Prev Next


 

 

 

Rate per sft Rate per sqm

=

=

Tk. Tk.

2.06

22.17

Say,

Tk.

22

.00 per sqm

 

 

 

 

 

 

 

 

Item No.- 16.13

 

 

 

 

 

 

Colour washing: 3 coats

 

 

 

 

 

 

Considering 1000 sft of work

  1. Slaked lime 18.66 kg @

Tk.

20.00

per kg

=

Tk.

373.20

  1. Gum 0.3 kg @

Tk.

200.00

per kg

=

Tk.

60.00

  1. Blue 0.2 kg @

Tk.

200.00

per kg

=

Tk.

40.00

(d) Colour pigment 1 kg @

(e) Labour

  1. Mason 1.5 nos @

Tk. Tk.

200.00

500.00

per kg
each

=

=

Tk. Tk.

200.00

750.00

  1. Ordinary labour 1 no @

Tk.

320.00

each

=

Tk.

320.00

(f) Scaffolding, sundries, local carriage etc.

 

 

LS

=

Tk.

160.00

 

 

 

Sub - Total

=

Tk.

1,903.20

 

 

Profit

10.00%

=

Tk.

190.32

 

 

Overhead

3.50%

=

Tk.

66.61

 

 

 

Total

=

Tk.

2,160.13

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

137.88

 

 

 

Grand Total

=

Tk.

2,298.01

 

 

 

Rate per sft

=

Tk.

2.30

 

 

 

Rate per sqm

=

Tk.

24.76

Say,

Tk.

25

.00 per sqm

 

 

 

 

 

 

 

 

 

 

Item No.- 16.14

 

 

 

 

 

Self leveling epoxy (SLE) coating for hospital floor (OT, ICU, PO etc) & where necessary

 

 

 

 

 

(2 Coats Application with clear base self leveling curing agent,screet coat,top coat)

 

 

 

 

 

 

Considering 100 sft of work

  1. Painter 0.5 no @

Tk.

600.00

each

=

Tk.

300.00

  1. Painter Helper 0.5 no @

Tk.

390.00

each

=

Tk.

195.00

  1. Scaffolding, sundries etc

 

 

LS

=

Tk.

500.00

  1. Self Leveling Epoxy Coating 100 sft

Tk.

150.00

per sft

=

Tk.

15,000.00

(4mm thickness)

 

 

 

 

 

 

 

 

 

Sub - Total

=

Tk.

15,995.00

 

 

Profit

10.00%

=

Tk.

1,599.50

 

 

Overhead

3.50%

=

Tk.

559.83

 

 

 

Total

=

Tk.

18,154.33

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

1,158.79

 

 

 

Grand Total

=

Tk.

19,313.12

 

 

 

Rate per sft

=

Tk.

193.13

 

 

 

Rate per sqm

=

Tk.

2,078.85

Say,

Tk.

2,079

.00 per sqm