Add VAT with adjustment factor
Profit 10.00%
Overhead 3.50%
=
Tk. Tk.
968.00
338.80
1.06383 6.00%
10,986.80
701.29
Grand total
Tk.
11,688.09
Rate per sft
97.40
Rate per sqm.
1,048.41
Say,
1,048 .00 per sqm