Prev Next
īģŋ

Add VAT with adjustment factor

 

Profit 10.00%

Overhead 3.50%

=

=

Tk. Tk.

968.00

338.80

1.06383 6.00%

=

=

Tk. Tk.

10,986.80

701.29

 

 

Grand total

=

Tk.

11,688.09

 

 

Rate per sft

=

Tk.

97.40

 

 

Rate per sqm.

=

Tk.

1,048.41

Say,

Tk.

1,048 .00 per sqm