(iii) 3/4" x 3/4" x 1/4" M.S. angle for box: @ 0.585 lbs per rft : 22 x 2 x 3'-0"= 132.00 rft |
|
|
|
|
Add wastage 5%= 6.60 rft | per Ib | = | Tk. | 2,022.14 |
= 138.60 rft = 81.08 lbs @ Tk. 24.94 (b) Fittings, hardwares and consumables: | ||||
(i) Electrodes in/c electricity 140.00 nos @ Tk. 10.00 (c) Labour for making grill fencing
| each | = = | Tk. Tk. | 1,400.00 1,800.00 |
| per day | = | Tk. | 1,170.00 |
| per day | = | Tk. | 960.00 |
(d) Carrying of materials to work-shop and fabricated materials to site: |
| = | Tk. | 480.00 |
| Sub-total | = | Tk. | 11,359.65 |
(e) Work-shop charges: L.S | 10% | = | Tk. | 1,135.97 |
(f) Ancillary works for fitting-fixing the grill fencing: | Sub-Total | = | Tk. | 12,495.62 |
3" x 3" x 12" size grooves 4 nos @ Tk. 32.00
| each | = | Tk. | 128.00 |
4 x 3" x 3" x 12"= 0.25 cft @ Tk. 17,763.63 (g) Labour charge for fitting-fixing the grill fencing: | per % cft | = | Tk. | 44.41 |
| per day | = | Tk. | 250.00 |
| per day | = | Tk. | 195.00 |
| Sub - Total | = | Tk. | 13,113.03 |
Profit | 10.00% | = | Tk. | 1,311.30 |
Overhead | 3.50% | = | Tk. | 458.96 |
| Total | = | Tk. | 14,883.29 |
Add VAT with adjustment factor 1.06383 | 6.00% | = | Tk. | 950.00 |
| Grand Total | = | Tk. | 15,833.29 |
| Rate per sft | = | Tk. | 435.22 |
| Rate per sqm | = | Tk. | 4,684.71 |
Say, Tk. 4,685 .00 per sqm |
|
|
| |
|
|
|
|
|
Item No.- 21.3 |
|
|
|
|
Supplying, fitting & fixing of steel grill fencing with outer frame having 1.5" x 1.5" x 1/4" M.S. angle and inner member having 1/4" dia M.S. rod placed 4.5" c/c diagonally on both directions. |
|
|
|
|
Considering 1 No. steel grill fencing |
|
|
|
|
Considering a panel of 7'-9" x 3'-3"= 25.19 sft fencing work (a) Materials: |
|
|
|
|
2 x 3'-3"= 6.50 rft |
|
|
|
|
Horizontal: 2 x 7'-9"= 15.50 rft |
|
|
|
|
= 22 rft | ||||
Add wastage 5%= 1.1 rft | Per lb. | = | Tk. | 1,348.01 |
23.1 rft = 54.05 Ibs @ Tk. 24.94
20 x 3'-3"= 65.00 rft 8 x 7'-9"= 62.00 rft | ||||
127.00 rft | ||||
Add wastage 5%= 6.35 rft | per Ib | = | Tk. | 585.70 |
= 133.35 rft = 22.27 lbs @ Tk. 26.30 (b) Fittings, hardwares and consumables: | ||||
(i) Electrodes in/c electricity 35.00 nos @ Tk. 10.00 (c) Labour for making grill fencing
| each | = = | Tk. Tk. | 350.00 600.00 |
| per day | = | Tk. | 390.00 |
| per day | = | Tk. | 320.00 |
(d) Carrying of materials to work-shop and fabricated materials to site: |
| = | Tk. | 240.00 |