Item No.- 23.1

 

 

 

 

 

Ferrocement roof panel for floor / roof slab.

 

 

 

 

 

Considering 100 sft of work

 

 

 

 

 

1 Stone chips (12mm down well graded) 6.62 cft @ Tk.

165.00

per cft

=

Tk.

1,092.30

2 Stone chips (6mm down graded) 8.68 cft @ Tk.

140.00

per cft

=

Tk.

1,215.20

3 Sand (F.M. 1.2) 0.50 cft @ Tk.

14.00

per cft

=

Tk.

7.00

4 Sand (FM. 2.2) 13.27 cft @ Tk.

45.00

per cft

=

Tk.

597.15

5 Cement 6.40 bags @ Tk.

415.00

per bag

=

Tk.

2,656.00

6 MS rod (fy=400MPa) 12mm dia 33.34 kg @ Tk.

60.50

per kg

=

Tk.

2,017.07

7 MS rod (fy=400MPa) 10mm dia 17.21 kg @ Tk.

60.50

per kg

=

Tk.

1,041.21

8 MS rod (fy=400MPa) 3mm dia 5.06 kg @ Tk.

60.50

per kg

=

Tk.

306.13

9 18 BWG galvanized wire mesh (2 mesh per 200.00 sft @ Tk.

20.00

per sft

=

Tk.

4,000.00

25mm)

 

 

 

 

 

10 24 No. G.I. wire 0.20 kg @ Tk.

120.00

per kg

=

Tk.

24.00

11 Hire charge of Mixture machine including Oil 0.25 no @ Tk.

2,004.00

per day

=

Tk.

501.00

& Operator

 

 

 

 

 

12 Hire charge of Vibrator table including Oil & 0.25 no @ Tk.

996.00

per day

=

Tk.

249.00

Operator

 

 

 

 

 

13 Formworks / Shuttering (Steel) 100.00 sft @ Tk.

2.03

per sft

=

Tk.

203.00

14 Head Mason 0.50 no @ Tk.

600.00

each

=

Tk.

300.00

15 Mason 1.50 nos @ Tk.

500.00

each

=

Tk.

750.00

16 Rod binder 0.50 no @ Tk.

500.00

each

=

Tk.

250.00

17 Helper to Rod binder 0.50 no @ Tk.

390.00

each

=

Tk.

195.00

18 Skilled Labour for casting 2.00 nos @ Tk.

390.00

each

=

Tk.

780.00

19 Skilled Labour for lifting & assembling 3.00 nos @ Tk.

390.00

each

=

Tk.

1,170.00

20 Ordinary Labour for sand, screening & 0.50 no @ Tk.

washing

320.00

each

=

Tk.

160.00

21 Ordinary Labour for 7 days curing 0.88 no @ Tk.

320.00

each

=

Tk.

280.00

22 Local Carriage, Sundries, T&P water etc. 1.00 no @ Tk.

320.00

each

=

Tk.

320.00

 

 

Sub - Total

=

Tk.

18,114.06

Profit

10.00%

=

Tk.

1,811.41

Overhead

3.50%

=

Tk.

633.99

 

 

Total

=

Tk.

20,559.46

Add VAT with adjustment factor 1.06383

6.00%

=

Tk.

1,312.31

 

 

Grand Total

=

Tk.

21,871.77

 

 

Rate per sft

=

Tk.

218.72

 

 

Rate per sqm

=

Tk.

2,353.43

23.1.1 For ground floor, span up to 3810 mm for floor/roof slab.

 

 

=

Tk.

2,354.00

23.1.2.1 Add for each additional span length of 150mm long direction (3810 mm<span ≤ 4800mm)

 

 

=

Tk.

9.00

23.1.2.2 Add for each additional floor up to 5th floor

 

 

=

Tk.

35.00

23.1.2.3 Add for each additional floor from 6th floor

 

 

=

Tk.

40.00

 

 

 

 

 

 

Item No.- 23.2

 

 

 

 

 

Ferrocement folded plate for roof

 

 

 

 

 

Considering 100 sft of work

1 Sand (F.M. 1.2) 2.70 cft @ Tk.

14.00

per cft

=

Tk.

37.80

2 Sand (F.M. 2.2) 10.00 cft @ Tk.

45.00

per cft

=

Tk.

450.00

3 Cement 4.50 bags @ Tk.

415.00

per bag

=

Tk.

1,867.50

4 MS Rod (fy = 400 Mpa) 60.94 Kg @ Tk.

60.50

per kg

=

Tk.

3,686.87

5 20 BWG galvanized wire mesh (2 mesh per 150.00 sft @ Tk.

25.00

per sft

=

Tk.

3,750.00

25mm)

 

 

 

 

 

6 Jute hassian 75.00 sft @ Tk.

2.50

per sft

=

Tk.

187.50

7 Polythene sheet 75.00 sft @ Tk.

2.50

per sft

=

Tk.

187.50

8 24 BWG G.I. wire 2.00 kg @ Tk.

120.00

per kg

=

Tk.

240.00

9 Shuttering (Steel)

 

LS

=

Tk.

200.00

10 Hire charge of Mixture machine including Oil 0.25 no @ Tk.

2,004.00

per day

=

Tk.

501.00

& Operator