Item No.- 26.11

 

 

 

 

 

 

 

 

 

 

26.11.1

approx. 665x490x840 mm, 29.5 kg

 

 

 

 

 

 

 

 

26.11.1.1

Light colour (Ivory/ Alpine White/ Grey/ Pink/ Blue/ Aqua Verde)

 

 

 

 

 

 

 

 

 

.

 

 

 

 

 

 

 

 

1.

White wash-basin

1

no

@

Tk.

 

4,760.00

each

=

Tk.

4,760.00

2.

Accessories:

 

 

 

 

 

 

 

 

 

 

  1.  

a) 32 mm dia PVC waste pipe

1

no

@

Tk.

 

150.00

each

=

Tk.

150.00

  1.  

Grating with brass coupling

1

no

@

Tk.

 

300.00

each

=

Tk.

300.00

  1.  

CP chain with rubber plug

1

no

@

Tk.

 

80.00

each

=

Tk.

80.00

3.

Fitting fixing materials:

 

 

 

 

 

 

 

 

 

 

(a)

Cement mortar (1:4)

 

 

 

 

 

 

 

 

 

 

  1.  

Cement

0.01

bag

@

Tk.

 

395.00

per bag

=

Tk.

3.95

  1.  

Sand (F.M. 1.2)

0.05

cft

@

Tk.

 

1,400.00

per % cft

=

Tk.

0.70

(b)

CI brakets

1

pair

@

Tk.

 

115.00

per pair

=

Tk.

115.00

4.

Labour:

 

 

 

 

 

 

 

 

 

 

  1.  

Plumber

0.15

no

@

Tk.

 

600.00

each

=

Tk.

90.00

  1.  

Skilled labour

0.2

no

@

Tk.

 

390.00

each

=

Tk.

78.00

  1.  

Ordinary labour

0.4

no

@

Tk.

 

320.00

each

=

Tk.

128.00

 

 

 

 

 

 

 

 

Sub - Total

=

Tk.

5,705.65

 

 

 

 

 

 

Profit

10.00%

=

Tk.

570.57

 

 

 

 

 

 

Overhead

3.50%

=

Tk.

199.70

 

 

 

 

 

 

 

 

Total

=

Tk.

6,475.92

 

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

413.36

 

 

 

 

 

 

 

 

Grand Total

=

Tk.

6,889.28

 

 

 

 

 

 

 

 

Rate per No.

=

Tk.

6,889.28

 

 

 

 

Say,

Tk.

 

6,889 .00 each

 

 

 

26.11.1.2

Coloured (Marble Shaded)

 

 

 

 

 

 

 

 

 

 

 

Considering 1 No. of fixture

 

 

 

 

 

 

 

 

 

 

1.

Coloured wash-basin

1

no

@

Tk.

 

6,185.00

each

=

Tk.

6,185.00

2.

Accessories

 

 

 

 

 

 

 

 

 

 

  1.  

32 mm dia PVC waste pipe

1

no

@

Tk.

 

150.00

each

=

Tk.

150.00

  1.  

Grating with brass coupling

1

no

@

Tk.

 

300.00

each

=

Tk.

300.00

  1.  

CP chain with rubber plug

1

no

@

Tk.

 

80.00

each

=

Tk.

80.00

3.

Fitting fixing materials:

 

 

 

 

 

 

 

 

 

 

(a)

Cement mortar (1:4)

 

 

 

 

 

 

 

 

 

 

  1.  

Cement

0.01

bag

@

Tk.

 

395.00

per bag

=

Tk.

3.95

  1.  

Sand (F.M. 1.2)

0.05

cft

@

Tk.

 

1,400.00

per % cft

=

Tk.

0.70

(b)

CI brakets

1

pair

@

Tk.

 

115.00

per pair

=

Tk.

115.00

4.

Labour:

 

 

 

 

 

 

 

 

 

 

  1.  

Plumber

0.15

no

@

Tk.

 

600.00

each

=

Tk.

90.00

  1.  

Skilled labour

0.2

no

@

Tk.

 

390.00

each

=

Tk.

78.00

  1.  

Ordinary labour

0.4

no

@

Tk.

 

320.00

each

=

Tk.

128.00

 

 

 

 

 

 

 

 

Sub - Total

=

Tk.

7,130.65

 

 

 

 

 

 

Profit

10.00%

=

Tk.

713.07

 

 

 

 

 

 

Overhead

3.50%

=

Tk.

249.57

 

 

 

 

 

 

 

 

Total

=

Tk.

8,093.29

 

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

516.59

 

 

 

 

 

 

 

 

Grand Total

=

Tk.

8,609.88

 

 

 

 

 

 

 

 

Rate per No.

=

Tk.

8,609.88

 

 

 

 

Say,

Tk.

 

8,610 .00 each

 

 

 

26.11.1.3

Special coloured (Deep Blue/ Ruby/ Rain Forest/ Green)

 

 

 

 

 

 

 

 

 

 

Considering 1 No. of fixture

 

 

 

 

 

 

 

 

 

1.

Special coloured wash-basin

1

no

@

Tk.

 

7,135.00

each

=

Tk.

7,135.00

2.

Accessories:

 

 

 

 

 

 

 

 

 

 

  1.  

32 mm dia PVC waste pipe

1

no

@

Tk.

 

150.00

each

=

Tk.

150.00

  1.  

Grating with brass coupling

1

no

@

Tk.

 

300.00

each

=

Tk.

300.00

  1.  

CP chain with rubber plug

1

no

@

Tk.

 

80.00

each

=

Tk.

80.00

3.

Fitting fixing materials: