Item No.- 26.11 |
|
|
|
|
|
|
|
|
|
| |
26.11.1 | approx. 665x490x840 mm, 29.5 kg |
|
|
|
|
|
|
|
| ||
26.11.1.1 | Light colour (Ivory/ Alpine White/ Grey/ Pink/ Blue/ Aqua Verde) |
|
|
|
|
|
|
|
| ||
| . |
|
|
|
|
|
|
|
| ||
1. | White wash-basin | 1 | no | @ | Tk. |
| 4,760.00 | each | = | Tk. | 4,760.00 |
2. | Accessories: |
|
|
|
|
|
|
|
|
|
|
a) 32 mm dia PVC waste pipe | 1 | no | @ | Tk. |
| 150.00 | each | = | Tk. | 150.00 | |
Grating with brass coupling | 1 | no | @ | Tk. |
| 300.00 | each | = | Tk. | 300.00 | |
CP chain with rubber plug | 1 | no | @ | Tk. |
| 80.00 | each | = | Tk. | 80.00 | |
3. | Fitting fixing materials: |
|
|
|
|
|
|
|
|
|
|
(a) | Cement mortar (1:4) |
|
|
|
|
|
|
|
|
|
|
Cement | 0.01 | bag | @ | Tk. |
| 395.00 | per bag | = | Tk. | 3.95 | |
Sand (F.M. 1.2) | 0.05 | cft | @ | Tk. |
| 1,400.00 | per % cft | = | Tk. | 0.70 | |
(b) | CI brakets | 1 | pair | @ | Tk. |
| 115.00 | per pair | = | Tk. | 115.00 |
4. | Labour: |
|
|
|
|
|
|
|
|
|
|
Plumber | 0.15 | no | @ | Tk. |
| 600.00 | each | = | Tk. | 90.00 | |
Skilled labour | 0.2 | no | @ | Tk. |
| 390.00 | each | = | Tk. | 78.00 | |
Ordinary labour | 0.4 | no | @ | Tk. |
| 320.00 | each | = | Tk. | 128.00 | |
|
|
|
|
|
|
|
| Sub - Total | = | Tk. | 5,705.65 |
|
|
|
|
|
| Profit | 10.00% | = | Tk. | 570.57 | |
|
|
|
|
|
| Overhead | 3.50% | = | Tk. | 199.70 | |
|
|
|
|
|
|
|
| Total | = | Tk. | 6,475.92 |
|
| Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 413.36 | |||
|
|
|
|
|
|
|
| Grand Total | = | Tk. | 6,889.28 |
|
|
|
|
|
|
|
| Rate per No. | = | Tk. | 6,889.28 |
|
|
|
| Say, | Tk. |
| 6,889 .00 each |
|
|
| |
26.11.1.2 | Coloured (Marble Shaded) |
|
|
|
|
|
|
|
|
|
|
| Considering 1 No. of fixture |
|
|
|
|
|
|
|
|
|
|
1. | Coloured wash-basin | 1 | no | @ | Tk. |
| 6,185.00 | each | = | Tk. | 6,185.00 |
2. | Accessories |
|
|
|
|
|
|
|
|
|
|
32 mm dia PVC waste pipe | 1 | no | @ | Tk. |
| 150.00 | each | = | Tk. | 150.00 | |
Grating with brass coupling | 1 | no | @ | Tk. |
| 300.00 | each | = | Tk. | 300.00 | |
CP chain with rubber plug | 1 | no | @ | Tk. |
| 80.00 | each | = | Tk. | 80.00 | |
3. | Fitting fixing materials: |
|
|
|
|
|
|
|
|
|
|
(a) | Cement mortar (1:4) |
|
|
|
|
|
|
|
|
|
|
Cement | 0.01 | bag | @ | Tk. |
| 395.00 | per bag | = | Tk. | 3.95 | |
Sand (F.M. 1.2) | 0.05 | cft | @ | Tk. |
| 1,400.00 | per % cft | = | Tk. | 0.70 | |
(b) | CI brakets | 1 | pair | @ | Tk. |
| 115.00 | per pair | = | Tk. | 115.00 |
4. | Labour: |
|
|
|
|
|
|
|
|
|
|
Plumber | 0.15 | no | @ | Tk. |
| 600.00 | each | = | Tk. | 90.00 | |
Skilled labour | 0.2 | no | @ | Tk. |
| 390.00 | each | = | Tk. | 78.00 | |
Ordinary labour | 0.4 | no | @ | Tk. |
| 320.00 | each | = | Tk. | 128.00 | |
|
|
|
|
|
|
|
| Sub - Total | = | Tk. | 7,130.65 |
|
|
|
|
|
| Profit | 10.00% | = | Tk. | 713.07 | |
|
|
|
|
|
| Overhead | 3.50% | = | Tk. | 249.57 | |
|
|
|
|
|
|
|
| Total | = | Tk. | 8,093.29 |
|
| Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 516.59 | |||
|
|
|
|
|
|
|
| Grand Total | = | Tk. | 8,609.88 |
|
|
|
|
|
|
|
| Rate per No. | = | Tk. | 8,609.88 |
|
|
|
| Say, | Tk. |
| 8,610 .00 each |
|
|
| |
26.11.1.3 | Special coloured (Deep Blue/ Ruby/ Rain Forest/ Green) |
|
|
|
|
|
|
|
|
| |
| Considering 1 No. of fixture |
|
|
|
|
|
|
|
|
| |
1. | Special coloured wash-basin | 1 | no | @ | Tk. |
| 7,135.00 | each | = | Tk. | 7,135.00 |
2. | Accessories: |
|
|
|
|
|
|
|
|
|
|
32 mm dia PVC waste pipe | 1 | no | @ | Tk. |
| 150.00 | each | = | Tk. | 150.00 | |
Grating with brass coupling | 1 | no | @ | Tk. |
| 300.00 | each | = | Tk. | 300.00 | |
CP chain with rubber plug | 1 | no | @ | Tk. |
| 80.00 | each | = | Tk. | 80.00 | |
3. | Fitting fixing materials: |
|
|
|
|
|
|
|
|
|
|