Prev Next
īģŋ

(d)

Labour:

 

 

 

 

 

 

 

 

 

  1.  

Plumber

0.03

no

@

Tk.

600.00

each

=

Tk.

18.00

  1.  

Skilled labour

0.08

nos

@

Tk.

390.00

each

=

Tk.

31.20

  1.  

Ordinary labour

0.06

nos

@

Tk.

320.00

each

=

Tk.

19.20

 

 

 

 

 

 

 

Sub - Total

=

Tk.

253.40

 

 

 

 

 

 

Profit

10.00%

=

Tk.

25.34

 

 

 

 

 

 

Overhead

3.50%

=

Tk.

8.87

 

 

 

 

 

 

 

Total

=

Tk.

287.61

 

Add VAT with adjustment factor

 

 

 

1.06383

6.00%

=

Tk.

18.36

 

 

 

 

 

 

 

Grand Total

=

Tk.

305.97

 

 

 

 

Say,

Tk.

306 .00 each

 

 

 

Supplying, fitting-fixing of PP-R Union of following sizes:

 

 

 

 

 

 

 

 

 

26.40.3

1" PP-R Union

 

 

 

 

 

 

 

 

 

 

Considering 1no. Of fixture

 

 

 

 

 

 

 

 

 

(a)

1" PP-R Union

1

no

@

Tk.

170.00

each

=

Tk.

170.00

(b)

Fittings fixing materials:

 

 

 

 

 

 

 

 

 

(i)

Teflon Tape

2

pcs

@

Tk.

16.00

per pcs

=

Tk.

32.00

(d)

Labour:

 

 

 

 

 

 

 

 

 

  1.  

Plumber

0.04

no

@

Tk.

600.00

each

=

Tk.

24.00

  1.  

Skilled labour

0.09

nos

@

Tk.

390.00

each

=

Tk.

35.10

  1.  

Ordinary labour

0.07

nos

@

Tk.

320.00

each

=

Tk.

22.40

 

 

 

 

 

 

 

Sub - Total

=

Tk.

283.50

 

 

 

 

 

 

Profit

10.00%

=

Tk.

28.35

 

 

 

 

 

 

Overhead

3.50%

=

Tk.

9.92

 

 

 

 

 

 

 

Total

=

Tk.

321.77

 

Add VAT with adjustment factor

 

 

 

1.06383

6.00%

=

Tk.

20.54

 

 

 

 

 

 

 

Grand Total

=

Tk.

342.31

 

 

 

 

Say,

Tk.

342 .00 each

 

 

 

Supplying, fitting-fixing of PP-R Union of following sizes:

 

 

 

 

 

 

 

 

 

26.40.4

1.25" PP-R Union

 

 

 

 

 

 

 

 

 

 

Considering 1no. Of fixture

 

 

 

 

 

 

 

 

 

(a)

1.25" PP-R Union

1

no

@

Tk.

328.00

each

=

Tk.

328.00

(b)

Fittings fixing materials:

 

 

 

 

 

 

 

 

 

(i)

Teflon Tape

2

pcs

@

Tk.

16.00

per pcs

=

Tk.

32.00

(d)

Labour:

 

 

 

 

 

 

 

 

 

  1.  

Plumber

0.05

no

@

Tk.

600.00

each

=

Tk.

30.00

  1.  

Skilled labour

0.1

nos

@

Tk.

390.00

each

=

Tk.

39.00

  1.  

Ordinary labour

0.1

nos

@

Tk.

320.00

each

=

Tk.

32.00

 

 

 

 

 

 

 

Sub - Total

=

Tk.

461.00

 

 

 

 

 

 

Profit

10.00%

=

Tk.

46.10

 

 

 

 

 

 

Overhead

3.50%

=

Tk.

16.14

 

 

 

 

 

 

 

Total

=

Tk.

523.24

 

Add VAT with adjustment factor

 

 

 

1.06383

6.00%

=

Tk.

33.40

 

 

 

 

 

 

 

Grand Total

=

Tk.

556.64

 

 

 

 

Say,

Tk.

557 .00 each

 

 

 

Supplying, fitting-fixing of PP-R Union of following sizes:

 

 

 

 

 

 

 

 

 

26.40.5

1.5" PP-R Union

 

 

 

 

 

 

 

 

 

 

Considering 1no. Of fixture

 

 

 

 

 

 

 

 

 

(a)

1.5" PP-R Union

1

no

@

Tk.

524.00

each

=

Tk.

524.00

(b)

Fittings fixing materials:

 

 

 

 

 

 

 

 

 

(i)

Teflon Tape

2

pcs

@

Tk.

16.00

per pcs

=

Tk.

32.00

(d)

Labour:

 

 

 

 

 

 

 

 

 

  1.  

Plumber

0.06

no

@

Tk.

600.00

each

=

Tk.

36.00

  1.  

Skilled labour

0.11

nos

@

Tk.

390.00

each

=

Tk.

42.90

  1.  

Ordinary labour

0.2

nos

@

Tk.

320.00

each

=

Tk.

64.00