| (excluding cost of re-inforcement) 14.78 | cft | @ | Tk. | 17,827.80 | per % cft | = | Tk. | 2,634.95 |
10" Honeycomb brick-work (1:6) in cement mortar |
|
|
|
|
|
|
|
| |
| (87.57% of solid b/work). 113.95 | cft | @ | Tk. | 12,403.41 | per % cft | = | Tk. | 14,133.69 |
10" solid brick-work (1:6) 117.75 | cft | @ | Tk. | 14,164.00 | per % cft | = | Tk. | 16,678.11 | |
R.C.C. (1:2:4) in curb well with 1.25% re-inforcement |
|
|
|
|
|
|
|
| |
| (excluding cost of reinforcement) 11.52 | cft | @ | Tk. | 17,827.80 | per % cft | = | Tk. | 2,053.76 |
40 grade re-inforcement & |
|
|
|
|
|
|
|
| |
| fabrication 1.25% 161.09 | Ibs | @ | Tk. | 29.74 | per Ibs | = | Tk. | 4,790.82 |
18" dia water sealed heavy type C.I. man-hole cover with locking |
|
|
|
|
|
|
| ||
| arrangement in/c making holes. 1 | no | @ | Tk. | 900.00 | each | = | Tk. | 900.00 |
Supply and filling graded |
|
|
|
|
|
|
|
| |
| khoa and sand. 295 | cft | @ | Tk. | 94.02 | per cft | = | Tk. | 27,735.90 |
|
|
|
|
|
| Sub - Total | = | Tk. | 71,281.41 |
|
|
|
| Profit | 10.00% | = | Tk. | 7,128.14 | |
|
|
|
| Overhead | 3.50% | = | Tk. | 2,494.85 | |
|
|
|
|
|
| Total | = | Tk. | 80,904.40 |
| Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 5,164.11 | ||
|
|
|
|
|
| Grand Total | = | Tk. | 86,068.51 |
|
|
|
|
|
| Rate per No. | = | Tk. | 86,068.51 |
|
|
| Say, | Tk. | 86,069 .00 each |
|
|
| |
26.85.2 | Soak-well for 100 users |
|
|
|
|
|
|
|
|
| Considering 1 No. soak-well |
|
|
|
|
|
|
|
|
Earth-work: 699 | cft | @ | Tk. | 2,958.33 | per % 0 cft | = | Tk. | 2,067.87 | |
R.C.C. (1:2:4) in curb well with 1.25% rinforcement cost of reinforcement) (excluding 13.51 | cft | @ | Tk. | 17,827.80 | per % cft | = | Tk. | 2,408.54 | |
10" Honeycomb brick-work (1:6) in cement mortar |
|
|
|
|
|
|
|
| |
| (87.57% of solid b/work). 104.18 | cft | @ | Tk. | 12,403.41 | per % cft | = | Tk. | 12,921.87 |
10" solid brick-work (1:6) 107.66 | cft | @ | Tk. | 14,164.00 | per % cft | = | Tk. | 15,248.96 | |
R.C.C. (1:2:4) in curb well with 1.25% re-inforcement |
|
|
|
|
|
|
|
| |
| (excluding cost of re-inforcement) 9.86 | cft | @ | Tk. | 17,827.80 | per % cft | = | Tk. | 1,757.82 |
40 grade reinforcement & |
|
|
|
|
|
|
|
| |
| fabrication 1.25% 143.14 | Ibs | @ | Tk. | 29.74 | per Ibs | = | Tk. | 4,256.98 |
18" dia water sealed heavy type C.I. man-hole cover with locking |
|
|
|
|
|
|
| ||
| arrangement in/c making holes. 1 | no | @ | Tk. | 900.00 | each | = | Tk. | 900.00 |
Supply and filling graded |
|
|
|
|
|
|
|
| |
| khoa and sand. 251 | cft | @ | Tk. | 94.02 | per cft | = | Tk. | 23,599.02 |
|
|
|
|
|
| Sub - Total | = | Tk. | 63,161.06 |
|
|
|
| Profit | 10.00% | = | Tk. | 6,316.11 | |
|
|
|
| Overhead | 3.50% | = | Tk. | 2,210.64 | |
|
|
|
|
|
| Total | = | Tk. | 71,687.81 |
| Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 4,575.82 | ||
|
|
|
|
|
| Grand Total | = | Tk. | 76,263.63 |
|
|
|
|
|
| Rate per No. | = | Tk. | 76,263.63 |
|
|
| Say, | Tk. | 76,264 .00 each |
|
|
| |
26.85.3 | Soak-well for 50 users |
|
|
|
|
|
|
|
|
| Considering 1 No. soak-well |
|
|
|
|
|
|
|
|
Earth-work: 608.9 | cft | @ | Tk. | 2,958.33 | per % 0 cft | = | Tk. | 1,801.33 | |
R.C.C. (1:2:4) in curb well with 1.25% reinforcement |
|
|
|
|
|
|
|
| |
| (excluding cost of reinforcement) 12.24 | cft | @ | Tk. | 17,827.80 | per % cft | = | Tk. | 2,182.12 |
10" Honeycomb brick-work (1:6) in cement |
|
|
|
|
|
|
|
| |
| mortar (87.57% of solid b/work). 94.4 | cft | @ | Tk. | 12,403.41 | per % cft | = | Tk. | 11,708.82 |
10" solid brick-work (1:6) 97.56 | cft | @ | Tk. | 14,164.00 | per % cft | = | Tk. | 13,818.40 | |
R.C.C. (1:2:4) in curb well with 1.25% reinforcement |
|
|
|
|
|
|
|
| |
| (excluding cost of reinforcement) 8.32 | cft | @ | Tk. | 17,827.80 | per % cft | = | Tk. | 1,483.27 |
40 grade reinforcement & |
|
|
|
|
|
|
|
| |
| fabrication 1.25% 125.93 | Ibs | @ | Tk. | 29.74 | per Ibs | = | Tk. | 3,745.16 |
18" dia water sealed heavy type C.I. man-hole cover with locking |
|
|
|
|
|
|
| ||
| arrangement in/c making holes. 1 no | @ | Tk. | 900.00 | each | = | Tk. | 900.00 | |
Supply and filling graded |
|
|
|
|
|
|
|
| |