(excluding cost of re-inforcement) 14.78

cft

@

Tk.

17,827.80

per % cft

=

Tk.

2,634.95

  1.  

10" Honeycomb brick-work (1:6) in cement mortar

 

 

 

 

 

 

 

 

 

(87.57% of solid b/work). 113.95

cft

@

Tk.

12,403.41

per % cft

=

Tk.

14,133.69

  1.  

10" solid brick-work (1:6) 117.75

cft

@

Tk.

14,164.00

per % cft

=

Tk.

16,678.11

  1.  

R.C.C. (1:2:4) in curb well with 1.25% re-inforcement

 

 

 

 

 

 

 

 

 

(excluding cost of reinforcement) 11.52

cft

@

Tk.

17,827.80

per % cft

=

Tk.

2,053.76

  1.  

40 grade re-inforcement &

 

 

 

 

 

 

 

 

 

fabrication 1.25% 161.09

Ibs

@

Tk.

29.74

per Ibs

=

Tk.

4,790.82

  1.  

18" dia water sealed heavy type C.I. man-hole cover with locking

 

 

 

 

 

 

 

 

arrangement in/c making holes. 1

no

@

Tk.

900.00

each

=

Tk.

900.00

  1.  

Supply and filling graded

 

 

 

 

 

 

 

 

 

khoa and sand. 295

cft

@

Tk.

94.02

per cft

=

Tk.

27,735.90

 

 

 

 

 

 

Sub - Total

=

Tk.

71,281.41

 

 

 

 

Profit

10.00%

=

Tk.

7,128.14

 

 

 

 

Overhead

3.50%

=

Tk.

2,494.85

 

 

 

 

 

 

Total

=

Tk.

80,904.40

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

5,164.11

 

 

 

 

 

 

Grand Total

=

Tk.

86,068.51

 

 

 

 

 

 

Rate per No.

=

Tk.

86,068.51

 

 

 

Say,

Tk.

86,069 .00 each

 

 

 

26.85.2

Soak-well for 100 users

 

 

 

 

 

 

 

 

 

Considering 1 No. soak-well

 

 

 

 

 

 

 

 

  1.  

Earth-work: 699

cft

@

Tk.

2,958.33

per % 0 cft

=

Tk.

2,067.87

  1.  

R.C.C. (1:2:4) in curb well with 1.25% rinforcement cost of reinforcement)

(excluding 13.51

cft

@

Tk.

17,827.80

per % cft

=

Tk.

2,408.54

  1.  

10" Honeycomb brick-work (1:6) in cement mortar

 

 

 

 

 

 

 

 

 

(87.57% of solid b/work). 104.18

cft

@

Tk.

12,403.41

per % cft

=

Tk.

12,921.87

  1.  

10" solid brick-work (1:6) 107.66

cft

@

Tk.

14,164.00

per % cft

=

Tk.

15,248.96

  1.  

R.C.C. (1:2:4) in curb well with 1.25% re-inforcement

 

 

 

 

 

 

 

 

 

(excluding cost of re-inforcement) 9.86

cft

@

Tk.

17,827.80

per % cft

=

Tk.

1,757.82

  1.  

40 grade reinforcement &

 

 

 

 

 

 

 

 

 

fabrication 1.25% 143.14

Ibs

@

Tk.

29.74

per Ibs

=

Tk.

4,256.98

  1.  

18" dia water sealed heavy type C.I. man-hole cover with locking

 

 

 

 

 

 

 

 

arrangement in/c making holes. 1

no

@

Tk.

900.00

each

=

Tk.

900.00

  1.  

Supply and filling graded

 

 

 

 

 

 

 

 

 

khoa and sand. 251

cft

@

Tk.

94.02

per cft

=

Tk.

23,599.02

 

 

 

 

 

 

Sub - Total

=

Tk.

63,161.06

 

 

 

 

Profit

10.00%

=

Tk.

6,316.11

 

 

 

 

Overhead

3.50%

=

Tk.

2,210.64

 

 

 

 

 

 

Total

=

Tk.

71,687.81

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

4,575.82

 

 

 

 

 

 

Grand Total

=

Tk.

76,263.63

 

 

 

 

 

 

Rate per No.

=

Tk.

76,263.63

 

 

 

Say,

Tk.

76,264 .00 each

 

 

 

26.85.3

Soak-well for 50 users

 

 

 

 

 

 

 

 

 

Considering 1 No. soak-well

 

 

 

 

 

 

 

 

  1.  

Earth-work: 608.9

cft

@

Tk.

2,958.33

per % 0 cft

=

Tk.

1,801.33

  1.  

R.C.C. (1:2:4) in curb well with 1.25% reinforcement

 

 

 

 

 

 

 

 

 

(excluding cost of reinforcement) 12.24

cft

@

Tk.

17,827.80

per % cft

=

Tk.

2,182.12

  1.  

10" Honeycomb brick-work (1:6) in cement

 

 

 

 

 

 

 

 

 

mortar (87.57% of solid b/work). 94.4

cft

@

Tk.

12,403.41

per % cft

=

Tk.

11,708.82

  1.  

10" solid brick-work (1:6) 97.56

cft

@

Tk.

14,164.00

per % cft

=

Tk.

13,818.40

  1.  

R.C.C. (1:2:4) in curb well with 1.25% reinforcement

 

 

 

 

 

 

 

 

 

(excluding cost of reinforcement) 8.32

cft

@

Tk.

17,827.80

per % cft

=

Tk.

1,483.27

  1.  

40 grade reinforcement &

 

 

 

 

 

 

 

 

 

fabrication 1.25% 125.93

Ibs

@

Tk.

29.74

per Ibs

=

Tk.

3,745.16

  1.  

18" dia water sealed heavy type C.I. man-hole cover with locking

 

 

 

 

 

 

 

 

arrangement in/c making holes. 1 no

@

Tk.

900.00

each

=

Tk.

900.00

  1.  

Supply and filling graded