Overhead 3.50%

=

Tk.

1,117.73

Total

Add VAT with adjustment factor 1.06383 6.00%

=

=

Tk. Tk.

36,246.36

2,313.60

Grand Total

=

Tk.

38,559.96

Say, Tk. 38,560 .00 each

 

 

 

27.29.2 Development of tube well for the depth beyond 200 m:

=

Tk.

46,271.95

 

 

 

 

Say, Tk. 46,272 .00 each

 

 

 

 

 

Item No.- 27.30

 

 

 

Long term pumping test of the well by required capacity pump including drawdown and recovery test etc. complete

 

 

 

Considering 72 hrs.

  1. Hire charge of pump in/c

spare and maintenance 72 hrs @ Tk. 334.08 per hour

  1. Fuel for pump:

=

Tk.

24,053.76

@ 3.75 liter per hour 270 liter @ Tk. 89.00 per liter

=

Tk.

24,030.00

  1. Foreman: @ 1 No. per 8 hrs 9 nos @ Tk. 800.00 each

=

Tk.

7,200.00

  1. Skilled labour 6 nos @ Tk. 390.00 each

=

Tk.

2,340.00

  1. Local carriage, T & P LS

=

Tk.

1,040.00

Sub - Total

=

Tk.

58,663.76

Profit 10.00%

=

Tk.

5,866.38

Overhead 3.50%

=

Tk.

2,053.23

Total

=

Tk.

66,583.37

Add VAT with adjustment factor 1.06383 6.00%

=

Tk.

4,250.00

Grand Total

=

Tk.

70,833.37

Rate per hour

=

Tk.

983.80

Say, Tk. 984 .00 per hour

 

 

 

 

 

 

 

Item No.- 27.31

 

 

 

Disinfection of the tube well

 

 

 

Cost for disinfection of the tube well including supply of all the materials and other necessary cost as per specification

(for 100 x 200 mm tube-well) LS

=

Tk.

1,471.96

Profit 10.00%

=

Tk.

147.20

Overhead 3.50%

=

Tk.

51.52

Total

=

Tk.

1,670.68

Add VAT with adjustment factor 1.06383 6.00%

=

Tk.

106.64

Grand Total

=

Tk.

1,777.32

Say, Tk. 1,777 .00 each

 

 

 

 

 

 

 

Item No.- 27.32

 

 

 

Filling the bore hole around the well from top to the shrouding to G.L. as per specification

 

 

 

Considering 100 meter

  1. Foreman 1 no @ Tk. 800.00 each

=

Tk.

800.00

  1. Skilled labour 6 nos @ Tk. 390.00 each

=

Tk.

2,340.00

  1. Local carriage, T & P LS

=

Tk.

320.00

Sub - Total

=

Tk.

3,460.00

Profit 10.00%

=

Tk.

346.00

Overhead 3.50%

=

Tk.

121.10

Total

=

Tk.

3,927.10

Add VAT with adjustment factor 1.06383 6.00%

=

Tk.

250.67

Grand Total

=

Tk.

4,177.77

Rate per rm

=

Tk.

41.78