supply of all the materials and other necessary

 

 

 

 

cost as per specification

LS

=

Tk.

1,251.16

 

Profit 10.00%

=

Tk.

125.12

 

Overhead 3.50%

=

Tk.

43.79

 

Total

=

Tk.

1,420.07

Add VAT with adjustment factor

1.06383 6.00%

=

Tk.

90.64

 

Grand Total

=

Tk.

1,510.71

Say, Tk.

1,511 .00 each

 

 

 

 

 

 

 

 

Item No.- 27.69

 

 

 

 

Filling the bore hole around the well from top to the shrouding to G.L. as per specification

 

 

 

 

Considering 100 meter

  1. Foreman 1 no @ Tk.

800.00 each

=

Tk.

800.00

  1. Skilled labour 5 nos @ Tk.

390.00 each

=

Tk.

1,950.00

  1. Local carriage, T & P

LS

=

Tk.

400.00

 

Sub - Total

=

Tk.

3,150.00

 

Profit 10.00%

=

Tk.

315.00

 

Overhead 3.50%

=

Tk.

110.25

 

Total

=

Tk.

3,575.25

Add VAT with adjustment factor

1.06383 6.00%

=

Tk.

228.21

 

Grand Total

=

Tk.

3,803.46

 

Rate per rm

=

Tk.

38.03

Say, Tk.

38 .00 per meter

 

 

 

 

 

 

 

 

ANALYSIS FOR INSTALLATION OF 100 mm x 200 mm DIA SHROUDED

 

 

 

 

PRODUCTION WELL WITH G.I. PIPE

 

 

 

 

 

 

 

 

 

Item No.- 27.70.1

 

 

 

 

400 mm dia boring

a) Considering 0 m to 50 m

 

 

 

 

Cost for boring including all equipment, accessories, labours and materials along

with insurance coverage of risks 50 meter @ Tk.

854.13 per meter

=

Tk.

42,706.50

 

Profit 10.00%

=

Tk.

4,270.65

 

Overhead 3.50%

=

Tk.

1,494.73

 

Total

=

Tk.

48,471.88

Add VAT with adjustment factor

1.06383 6.00%

=

Tk.

3,093.95

 

Grand Total

=

Tk.

51,565.83

Rate per meter (from 0 m to 50 m)

=

Tk.

1,031.32

Say, Tk.

1,031 .00 per meter

 

 

 

 

 

 

 

 

Item No.- 27.70.2

 

 

 

 

400 mm dia boring

 

 

 

 

Considering 50 m to 100 m

  1. Rate for 0 m to 50 m

 

=

Tk.

1,031.32

  1. Add for 50 m to 100 m

15%

=

Tk.

154.70

 

Total

=

Tk.

1,186.02

 

Rate per meter (50 m to 100 m)

=

Tk.

1,186.02

Say, Tk.

1,186 .00 per meter

 

 

 

 

 

 

 

 

ITEM No.- 27.70.3

 

 

 

 

400 mm dia boring

 

 

 

 

Considering 100 m to 152 m

  1. Rate for 50 m to 100 m

 

=

Tk.

1,186.02

  1. Add for 100 m to 152 m

15%

=

Tk.

177.90

 

Total

=

Tk.

1,363.92

Rate per meter (100 m to 152 m)

=

Tk.

1,363.92

Say, Tk. 1,364 .00 per meter