Prev Next
īģŋ

Add VAT with adjustment factor

 

1.06383

Total

6.00%

=

=

Tk. Tk.

3,933.24

251.06

Grand Total Rate per rm

=

=

Tk. Tk.

4,184.30

4,184.30

Say,

Tk.

4,184

.00 per meter

 

 

 

 

 

 

 

 

Item No.- 27.71.6

 

 

 

 

 

 

Supplying 200 mm dia 6 mm thick M.S. housing pipe (Seamless)

 

 

 

 

 

 

Considering 1 meter

  1. 200 mm dia 6 mm

thick M.S. housing pipe 1 meter @

Tk.

3,637.63

per meter

=

Tk.

3,637.63

  1. Carriage of materials

 

 

LS

=

Tk.

160.00

 

 

 

Sub - Total

=

Tk.

3,797.63

 

 

Profit

10.00%

=

Tk.

379.76

 

 

Overhead

3.50%

=

Tk.

132.92

 

 

 

Total

=

Tk.

4,310.31

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

275.13

 

 

 

Grand Total

=

Tk.

4,585.44

 

 

 

Rate per rm

=

Tk.

4,585.44

Say,

Tk.

4,585

.00 per meter

 

 

 

Item No.- 27.71.7

 

 

 

 

 

 

Supplying centralizer made with 12 mm dia M.S. rod of approved design

 

 

 

 

 

 

Considering 1 No.

  1. 1 set centralizer consists of four leaves:

 

 

 

 

 

 

10 mm dia M.S. rod

 

 

 

 

 

 

4 x 3'-0"=12'-0" 4.512 Ibs @

Tk.

27.44

per meter

=

Tk.

123.81

  1. Carriage, welding, fabrication and other necessary cost

 

 

LS

=

Tk.

64.00

 

 

 

Sub - Total

=

Tk.

187.81

 

 

Profit

10.00%

=

Tk.

18.78

 

 

Overhead

3.50%

=

Tk.

6.57

 

 

 

Total

=

Tk.

213.16

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

13.61

 

 

 

Grand Total

=

Tk.

226.77

 

 

 

Rate each.

=

Tk.

226.77

Say,

Tk.

227 .00 each

 

 

 

 

 

 

 

 

 

 

Item No.- 27.71.8

 

 

 

 

 

 

Supplying 200 mm dia M.S. cap of 6 mm thick.

 

 

 

 

 

 

Considering 1 No.

  1. 200 mm dia 6 mm thick M.S. cap. 1 no @

Tk.

1,421.27

each

=

Tk.

1,421.27

  1. Carriage, welding, fabrication and other necessary cost

 

 

LS

=

Tk.

500.00

 

 

 

Sub - Total

=

Tk.

1,921.27

 

 

Profit

10.00%

=

Tk.

192.13

 

 

Overhead

3.50%

=

Tk.

67.24

 

 

 

Total

=

Tk.

2,180.64

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

139.19

 

 

 

Grand Total

=

Tk.

2,319.83

 

 

 

Rate each.

=

Tk.

2,319.83

Say,

Tk.

2,320 .00 each

 

 

 

 

 

 

 

 

 

 

Item No.- 27.72

 

 

 

 

 

 

Complete installation of tube well fixtures

 

 

 

 

 

 

Considering 107 meter of 1 No. tube-well:

 

 

 

 

 

 

  1. Filling the pit with slurry in/c preparation of slurry
  2. Lowering the bail plug, strainer, 50 mm dia G.I. pipe and 150 mm dia M.S. housing

pipe in/c coverage of risk 107 meter @

Tk.

128.00

LS

per meter

=

=

Tk.

Tk.

2,133.33

13,696.00

  1. Verticality test 2 times @

Tk.

1,920.00

Per time

=

Tk.

3,840.00