Prev Next


 

Item No.- 28.13

 

 

 

 

Testing and purging the house line properly as per specification of the Titas Gas T&D Co. Ltd.

 

 

 

 

Considering 1 meter of work

(a) Testing & purging the house line

LS

=

Tk.

16.00

 

Incidental charges

10.00%

=

Tk.

1.60

 

Profit

10.00%

=

Tk.

1.60

 

Overhead

3.50%

=

Tk.

0.06

 

 

Total

=

Tk.

19.26

Add VAT with adjustment factor

1.06383

6.00%

=

Tk.

1.23

 

 

Grand Total

=

Tk.

20.49

 

 

Rate per rm

=

Tk.

20.49

Say,

Tk. 20

.00 per meter