Item No.- 30.16.2

 

 

 

 

Supplying and placing 60 mm coloured Uni-block for major walk way, car porch on 50 mm

stabilized sand base: compressive strength 49N/mm2 Consideration of 100 sft work

(a) Material

  1. 60 mm coloured uni-block

(222 x 110 x 60 mm) 388 nos @ Tk. 20.00

per block

=

Tk.

7,760.00

  1. Sand 30.00 cft @ Tk. 1,400.00

per % cft

=

Tk.

420.00

  1. Transportation of block 388 nos @ Tk. 2.06

(b) Labour

  1. Head mason 0.1 no @ Tk. 600.00

each
each

=

=

Tk. Tk.

799.28

60.00

  1. Mason 1 no @ Tk. 500.00

each

=

Tk.

500.00

  1. Ordinary Labour 2 nos @ Tk. 320.00

each

=

Tk.

640.00

(c) Tools & machinery 100 sft @ Tk. 3.20

per sft

=

Tk.

320.00

(d) Local carriage, storage & sundries etc.

LS.

=

Tk.

96.00

 

Sub - Total

=

Tk.

10,595.28

Profit

10.00%

=

Tk.

1,059.53

Overhead

3.50%

=

Tk.

370.83

 

Total

=

Tk.

12,025.64

Add VAT with adjustment factor 1.06383

6.00%

=

Tk.

767.59

 

Grand Total

=

Tk.

12,793.23

 

Rate per sft

=

Tk.

127.93

 

Rate per sqm

=

Tk.

1,377.04

Say, Tk. 1,377 .00 per sqm

 

 

 

 

 

 

 

 

Item No.- 30.17.1

 

 

 

 

Supplying and placing 80 mm grey Uni-block for bus terminal, minor road, industrial yard on 50 mm stabilized sand base: compressive strength 49N/mm2

 

 

 

 

Consideration of 100 sft of work

(a) Material

  1. 80 mm grey uni-block

(222 x 110 x 80 mm) 388 nos @ Tk. 22.00

per block

=

Tk.

8,536.00

  1. Sand 30.00 cft @ Tk. 1,400.00

per % cft

=

Tk.

420.00

  1. iii) Transportation of block 388 nos @ Tk. 2.06

(b) Labour

  1. Head mason 0.1 no @ Tk. 600.00

each
each

=

=

Tk. Tk.

799.28

60.00

  1. Mason 1 no @ Tk. 500.00

each

=

Tk.

500.00

  1. Ordinary Labour 2 nos @ Tk. 320.00

each

=

Tk.

640.00

(c) Tools & machinery 100 sft @ Tk. 3.20

per sft

=

Tk.

320.00

(d) Local carriage, storage & sundries etc.

LS.

=

Tk.

96.00

 

Sub - Total

=

Tk.

11,371.28

Profit

10.00%

=

Tk.

1,137.13

Overhead

3.50%

=

Tk.

397.99

 

Total

=

Tk.

12,906.40

Add VAT with adjustment factor 1.06383

6.00%

=

Tk.

823.81

 

Grand Total

=

Tk.

13,730.21

 

Rate per sft

=

Tk.

137.30

 

Rate per sqm

=

Tk.

1,477.90

Say, Tk. 1,478 .00 per sqm

 

 

 

 

 

 

 

 

Item No.- 30.17.2

 

 

 

 

Supplying and placing 80 mm coloured Uni-block for bus terminal, minor road, industrial yard on 50 mm stabilized sand base: compressive strength 49N/mm2

 

 

 

 

Consideration of 100 sft of work

(a) Material

  1. 80 mm coloured uni-block

(222 x 110 x 80 mm) 388 nos @ Tk. 28.00

per block

=

Tk.

10,864.00

  1. Sand 30.00 cft @ Tk. 1,400.00

per % cft

=

Tk.

420.00

  1. Transportation of block 388 nos @ Tk. 2.06

each

=

Tk.

799.28