  1. Cutting Trapezoid shape Channel LS
  2. T & P, sundries etc. LS

=

=

Tk. Tk.

160.00

160.00

SubTotal

Contractor's profit 10%

Overhead expenses 3.50%

=

=

=

Tk.
Tk.
Tk.

1,123.40

112.34

39.32

Total

=

Tk.

1,275.06

VAT with adjustment factor 1.06383 6.00%

=

Tk.

81.39

Grand Total

=

Tk.

1,356.45

Rate per meter

=

Tk.

452.15

Say, Tk. 452 .00 per meter

 

 

 

 

 

 

 

Item No. 32.10

 

 

 

Taking out and relaying old brick soling including replacement of 10% brick

 

 

 

[Cost of fine sand required for attaining level to be paid by P.W.D. SoR 2018 Item No. 2.10.1

 

 

 

Considering 10 sqm of work

  1. Mason 0.25 no @ Tk. 500.00 each

=

Tk.

125.00

  1. Ordinary labour 1.00 nos @ Tk. 320.00 each

=

Tk.

320.00

  1. Local sand (F.M. 0.8) 0.14 cum @ Tk. 317.52 cum

=

Tk.

44.45

  1. Add cost of around 10% bricks 30.00 nos @ Tk. 8,700.00 per % 0 nos

=

Tk.

261.00

  1. Cleaning, sorting and stacking bricks LS

=

Tk.

96.00

  1. T & P, sundries LS

=

Tk.

32.00

SubTotal

=

Tk.

878.45

Contractor's profit 10%

=

Tk.

87.85

Overhead expenses 3.50%

=

Tk.

30.75

Total

=

Tk.

997.05

VAT with adjustment factor 1.06383 6.00%

=

Tk.

63.64

Grand Total

=

Tk.

1,060.69

Rate per sqm

=

Tk.

106.07

Say, Tk. 106 .00 per sqm

 

 

 

 

 

 

 

Item No. 32.11

 

 

 

Taking out and relaying brick soling after redressing the surfaces

 

 

 

[Cost of fine sand required for attaining level to be paid by P.W.D. SoR 2018 Item No. 2.10.1

 

 

 

Considering 10 sqm of work

  1. Mason 0.20 no @ Tk. 500.00 each

=

Tk.

100.00

  1. Ordinary labour 1.00 nos @ Tk. 320.00 each

=

Tk.

320.00

  1. Local sand (F.M. 0.8) 0.05 cum @ Tk. 317.52 cum

=

Tk.

15.88

  1. Cleaning, sorting and stacking bricks LS

=

Tk.

96.00

  1. T & P, sundries LS

=

Tk.

32.00

SubTotal

=

Tk.

563.88

Contractor's profit 10%

=

Tk.

56.39

Overhead expenses 3.50%

=

Tk.

19.74

Total

=

Tk.

640.01

VAT with adjustment factor 1.06383 6.00%

=

Tk.

40.85

Grand Total

=

Tk.

680.86

Rate per sqm

=

Tk.

68.09

Say, Tk. 68 .00 per sqm

 

 

 

 

 

 

 

Item No. 32.12.1

 

 

 

Taking out old brick on edge pavement and resetting (Herring bone bond) including replacement of 10% brick

 

 

 

[Cost of fine sand required for attaining level to be paid by P.W.D. SoR 2018 Item No. 2.10.1

 

 

 

Considering 10 sqm of work