547.94 kg @ Tk. 55.00

Deduct the resale value 40 % of the original

Fabrication and erection of the angle truss and base beam= 547.94 kg @ Tk. 20.00

For single use

  1. supply, fabrication and Fixing of dia 20 mm rebar as purlin perpendicular to the truss frame @600 mm c/c

per kg

per kg Total

cost per sqm

= = = = =

Tk.

Tk. Tk. Tk.

30,136.70 12,054.68 10,958.80 29,040.82

513.81

 

3.14X2.6X5=40.82 [email protected] kg per m= 105.87 kg @ Tk. 60.50

per kg

=

Tk.

6,405.14

 

Deduct the resale value 30 % of the original

 

=

Tk.

1,921.54

 

 

Total

=

Tk.

4,483.60

 

For single use

Cost per sqm

=

Tk.

79.33

  1.  

Hessian tap for making shutter

 

 

 

 

 

water-tight 56.52 sqm @ Tk. 13.45

per sqm

=

Tk.

760.19

  1.  

Curing for 28 days for surface area 56.52 sqm @ Tk. 28.69

per sqm

=

Tk.

1,621.56

 

 

Grand total

=

Tk.

2,381.75

 

For single use

Cost per sqm

=

Tk.

42.14

  1.  

Formwork/shuttering, prop and necessary supports etc. (steel)(for single use)

per sqm

=

Tk.

1,515.18

  1.  

Formwork/shuttering, prop and necessary supports etc. (steel)(for 2-times use)

per sqm

=

Tk.

1,060.63

  1.  

Formwork/shuttering, prop and necessary supports etc. (steel)(for 3-times use)

per sqm

=

Tk.

757.59

  1.  

Formwork/shuttering, prop and necessary supports etc. (steel)(for more than 3-times use use)

per sqm

=

Tk.

530.31

  1.  

Formwork/shuttering, prop and necessary supports etc. (steel)(exceedind 8 m span)

per sqm

=

Tk.

378.80

C-22

Extra Rate for making fair-faced concrete surface

 

 

 

 

 

Assuming 10'-0" x 12" x 12" Column

 

 

 

 

 

Shuttering Area: 40 sft

 

 

 

 

  1.  

2" x 2" x 1/4" angle for frame

 

 

 

 

 

4 x 2 x 10'-0"= 80.00 rft

 

 

 

 

 

2 x 3 x 1'-4"= 7.98 rft

 

 

 

 

 

2 x 3 x 1'-0"= 6.00 rft

 

 

 

 

 

93.98 rft

 

 

 

 

 

Add 5% wastage = 4.699 rft

 

 

 

 

 

= 98.68 rft

 

 

 

 

 

3.2 Ibs per rft = 316.76 Ibs @ Tk. 24.94

per Ib

=

Tk.

7,899.99

  1.  

1" x3/16" F.I. bar for stiffner

 

 

 

 

 

2 x 8 x 1'-4"= 21.28 rft

 

 

 

 

 

2 x 8 x 1'-0"= 16.00 rft

 

 

 

 

 

= 37.28 rft

 

 

 

 

 

Add 5% wastage= 1.86 rft

 

 

 

 

 

39.14 rft

 

 

 

 

 

@ 0.64Ib. per rft= 25.05 Ibs @ Tk. 24.94

per Ib

=

Tk.

624.75

  1.  

10 BWG steel sheet for covering frame

 

 

 

 

 

2 x 10'-0" x 1'-4"= 26.60 sft

 

 

 

 

 

2 x 10'-0" x 1'-0"= 20.00 sft

 

 

 

 

 

46.60 sft

 

 

 

 

 

Add 5% wastage= 2.33 sft

 

 

 

 

 

48.93 sft

 

 

 

 

 

@ 5.4 Ibs per sft= 264.222 Ibs @ Tk. 27.44

per Ib

=

Tk.

7,250.25

  1.  

Fabrication of steel shutter:

 

 

 

 

 

2 x 10'-0" x 1'-4"= 26.67 sft

 

 

 

 

 

2 x 10'-0" x 1'-0"= 20.00 sft

 

 

 

 

 

46.67 sft @ Tk. 75.00

per sft

=

Tk.

3,500.25

  1.  

Nuts, bolts, J-hooks etc. 1.5 kg @ Tk. 160.00

per kg

=

Tk.

240.00

 

 

Total

=

Tk.

19,515.24

 

Considering 15 times use

 

=

Tk.

1,301.02

  1.  

1.5" dia M.S. pipe for propping

 

 

 

 

 

4 x 8'-0"= 32.00 rft @ Tk. 115.00

Per rft

=

Tk.

3,680.00

  1.  

Turn-buckle in/c tie-rod 4.00 nos @ Tk. 450.00

each

=

Tk.

1,800.00

 

 

Total

=

Tk.

5,480.00

 

Considering 50 times use

 

=

Tk.

109.60

  1.  

Labour for fitting fixing steel shutter and props