Earth work in foundation trenches up to 1.5 m depth and maximum 10 m lead including protecting and maintaining the trench: Soft claye soil/ loose sand / silt ( 100 cft )
Material
quantity
Unit
Rate
Amount
Skill Labour (civil)
0.10
person
660.00
66.00
Ordinary Labour
0.50
person
638.00
319.00
Miscellaneous (taka)
30.00
LS
1.14
34.20
Total amount
419.20
sthapattya-o-nirman is a renowned Architectural and Engineering Magazine. They have latest bazardar. For details visit ths site from the above link