Your Quantity
Rate by
Concrete (1:3:6) work using BRICK CHIPS and sand of F.M. 1.2 ( 100 cft )
Material | quantity | Unit | Rate | Amount |
Bricks |
765.00 |
Nos |
14.17 |
10,840.05 |
Breaking chips including screening |
90.00 |
cft |
|
0.00 |
Sand 1.2 FM |
45.00 |
cft |
53.55 |
2,409.75 |
Cement |
13.00 |
bag |
603.75 |
7,848.75 |
Miscellaneous (taka) |
1,000.00 |
LS |
1.14 |
1,140.00 |
Total amount |
22,238.55 |
sthapattya-o-nirman is a renowned Architectural and Engineering Magazine. They have latest bazardar. For details visit ths site from the above link