Your Quantity
Rate by
Sand filling in foundation and plinth with local sand (F.M. 0.5 to 0.80)(100 cft)
Material | quantity | Unit | Rate | Amount |
Fine Sand |
130.00 | cft |
|
0 |
Head Masson (Civil) |
0.13 | person |
920.00 |
119.6 |
Ordinary Labour |
0.67 | person |
638.00 |
427.46 |
Miscellaneous (taka) |
300.00 | LS |
1.14 |
342 |
sthapattya-o-nirman is a renowned Architectural and Engineering Magazine. They have latest bazardar. For details visit ths site from the above link