  1. Skilled labour 2.5 nos @ Tk. 390.00
  2. Tools and plant, protecting and maintaining trench dry

Profit Overhead

per day
LS

=

=

Tk. Tk.

975.00

133.33

Sub - Total

10.00%

3.50%

=

=

=

Tk.
Tk.
Tk.

4,433.33

443.33

155.17

Total

=

Tk.

5,031.83

Add VAT with adjustment factor 1.06383

6.00%

=

Tk.

321.18

 

Grand Total

=

Tk.

5,353.01

 

Rate per cft

=

Tk.

5.35

 

Rate per cum

=

Tk.

188.94

Say, Tk. 189

.00 per cum

 

 

 

 

 

 

 

 

Item No.- 02.1.5

 

 

 

 

Earth work in foundation trenches up to 1.5 m depth and maximum 10 m lead including

protecting and maintaining the trench: very soft / saturated / organic claye soil/ soil of semi-liquid state

 

 

 

 

Considering 1000 cft work

  1. Mason 0.25 no @ Tk. 500.00

per day

=

Tk.

125.00

  1. Ordinary labour 11 nos @ Tk. 320.00

per day

=

Tk.

3,520.00

  1. Skilled labour 3 nos @ Tk. 390.00

per day

=

Tk.

1,170.00

  1. Tools and plant, protecting and maintaining trench dry

LS

=

Tk.

266.67

 

Sub - Total

=

Tk.

5,081.67

Profit

10.00%

=

Tk.

508.17

Overhead

3.50%

=

Tk.

177.86

 

Total

=

Tk.

5,767.70

Add VAT with adjustment factor 1.06383

6.00%

=

Tk.

368.15

 

Grand Total

=

Tk.

6,135.85

 

Rate per cft

=

Tk.

6.14

 

Rate per cum

=

Tk.

216.83

Say, Tk. 217

.00 per cum

 

 

 

 

 

 

 

 

Item No.- 02.1.6

 

 

 

 

Extra rate for each additional 0.5 meter depth exceeding 1.5 meter

 

 

 

 

Considering 1000 cft work

1. Ordinary labour 1.50 nos @ Tk. 320.00

per day

=

Tk.

480.00

 

Sub - Total

=

Tk.

480.00

Profit

10.00%

=

Tk.

48.00

Overhead

3.50%

=

Tk.

16.80

 

Total

=

Tk.

544.80

Add VAT with adjustment factor 1.06383

6.00%

=

Tk.

34.77

 

Grand Total

=

Tk.

579.57

 

Rate per cft

=

Tk.

0.58

 

Rate per cum

=

Tk.

20.48

Say, Tk. 20

.00 per cum

 

 

 

 

 

 

 

 

Item No.- 02.1.7

 

 

 

 

Extra rate for each 1 m additional lead beyond 10 m

 

 

 

 

Considering 1000 cft work

1. Ordinary labour 0.20 no @ Tk. 320.00

per day

=

Tk.

64.00

 

Sub - Total

=

Tk.

64.00

Profit

10.00%

=

Tk.

6.40

Overhead

3.50%

=

Tk.

2.24

 

Total

=

Tk.

72.64

Add VAT with adjustment factor 1.06383

6.00%

=

Tk.

4.64

 

Grand Total

=

Tk.

77.28

 

Rate per cft

=

Tk.

0.08

 

Rate per cum

=

Tk.

2.83

Say, Tk. 3

.00 per cum