Item No.- 02.9

 

 

 

Removing Sludge/semi-liquid clay etc. from the bottom local sand of Fm. 0.8 to a proportion (1:10)

of any type of Marshy land/Lake/Ditch/Pond

in/c mixing fine

 

 

 

1

10

ratio

Considering 1000 cft=

1000.00

100

 

 

 

 

 

 

  1. Fine sand (F.M. 0.8)

100.00 cft @

Tk. 900.00

per % cft

=

Tk.

900.00

  1. Labour for mixing sand and cutting loose sludge

 

 

 

 

 

in/c spreading and stacking 12.00 nos @

Tk. 320.00

per day

=

Tk.

3,840.00

  1. Labour cutting dried sludge in/c loading, 7.00 nos @
    unloading and truck/cart etc.

Tk. 320.00

per day

=

Tk.

2,240.00

  1. Hire charge of truck 7.00 trip @

Tk. 1,700.00

per trip

=

Tk.

11,900.00

  1. Tools and plant, sundries, incidental etc.

 

LS

=

Tk.

1,733.33

 

 

Sub - Total

=

Tk.

20,613.33

 

Profit

10.00%

=

Tk.

2,061.33

 

Overhead

3.50%

=

Tk.

721.47

 

 

Total

=

Tk.

23,396.13

Add VAT with adjustment factor

1.06383

6.00%

=

Tk.

1,493.37

 

 

Grand Total

=

Tk.

24,889.50

 

 

Rate per cft

=

Tk.

24.89

 

 

 

Rate per cum

=

Tk.

878.99

 

Say,

Tk. 879

.00 per cum

 

 

 

 

 

 

 

 

 

 

Item No.- 02.10.1

 

 

 

 

 

Sand filling in foundation and plinth with local sand (F.M. 0.5 to 0.80)

 

 

 

 

 

Considering 100 cft of work

 

 

 

 

 

  1. Sand (F.M. 0.5 to 0.8) considering additional

 

 

 

 

 

30% for compaction 130 cft @

Tk. 900.00

per % cft

=

Tk.

1,170.00

  1. Head mason 1/8 no @

Tk. 600.00

per day

=

Tk.

75.00

  1. Labour for levelling,

compacting, watering etc. 2/3 no @

Tk. 320.00

per day

=

Tk.

213.33

  1. Sundries, T & P etc.

 

LS

=

Tk.

32.00

 

 

Sub - Total

=

Tk.

1,490.33

 

Profit

10.00%

=

Tk.

149.03

 

Overhead

3.50%

=

Tk.

52.16

 

 

Total

=

Tk.

1,691.52

Add VAT with adjustment factor

1.06383

6.00%

=

Tk.

107.97

 

 

Grand Total

=

Tk.

1,799.49

 

 

Rate per cft

=

Tk.

17.99

 

 

 

Rate per cum

=

Tk.

635.32

 

Say,

Tk. 635

.00 per cum

 

 

 

 

 

 

 

 

 

 

Item No.- 02.10.2

 

 

 

 

 

Sand filling in foundation and plinth with local sand (F.M. 1.2)

 

 

 

 

 

Considering 100 cft of work

 

 

 

 

 

  1. Sand (F.M. 1.2) considering additional

 

 

 

 

 

30% for compaction 130 cft @

Tk. 1,400.00

per % cft

=

Tk.

1,820.00

  1. Head mason 1/8 no @

Tk. 600.00

per day

=

Tk.

75.00

  1. Labour for levelling,

compacting, watering etc. 2/3 no @

Tk. 320.00

per day

=

Tk.

213.33

  1. Sundries, T & P etc.

 

LS

=

Tk.

32.00

 

 

Sub - Total

=

Tk.

2,140.33

 

Profit

10.00%

=

Tk.

214.03

 

Overhead

3.50%

=

Tk.

74.91

 

 

Total

=

Tk.

2,429.27