| Grand Total Rate per sft Rate per sqm | = = = | Tk. | 1,331.21 13.31 143.27 | ||
Say, | Tk. 143 | .00 per sqm |
| |||||
|
|
|
|
|
|
| ||
Item No.- 02.9 |
|
|
| |||||
Removing Sludge/semi-liquid clay etc. from the bottom local sand of Fm. 0.8 to a proportion (1:10) | of any type of Marshy land/Lake/Ditch/Pond | in/c mixing fine |
|
|
| |||
1 | 10 | ratio | ||||||
Considering 1000 cft= | 1000.00 | 100 |
|
|
|
|
|
|
| 100.00 cft @ | Tk. 900.00 | per % cft | = | Tk. | 900.00 | ||
|
|
|
|
|
| |||
in/c spreading and stacking 12.00 nos @ | Tk. 320.00 | per day | = | Tk. | 3,840.00 | |||
| Tk. 320.00 | per day | = | Tk. | 2,240.00 | |||
| Tk. 1,700.00 | per trip | = | Tk. | 11,900.00 | |||
|
| LS | = | Tk. | 1,733.33 | |||
|
| Sub - Total | = | Tk. | 20,613.33 | |||
| Profit | 10.00% | = | Tk. | 2,061.33 | |||
| Overhead | 3.50% | = | Tk. | 721.47 | |||
|
| Total | = | Tk. | 23,396.13 | |||
Add VAT with adjustment factor | 1.06383 | 6.00% | = | Tk. | 1,493.37 | |||
|
| Grand Total | = | Tk. | 24,889.50 | |||
|
| Rate per cft | = | Tk. | 24.89 | |||
|
|
| Rate per cum | = | Tk. | 878.99 | ||
| Say, | Tk. 879 | .00 per cum |
|
|
| ||
|
|
|
|
|
|
| ||
Item No.- 02.10.1 |
|
|
|
|
| |||
Sand filling in foundation and plinth with local sand (F.M. 0.5 to 0.80) |
|
|
|
|
| |||
Considering 100 cft of work |
|
|
|
|
| |||
|
|
|
|
|
| |||
30% for compaction 130 cft @ | Tk. 900.00 | per % cft | = | Tk. | 1,170.00 | |||
| Tk. 600.00 | per day | = | Tk. | 75.00 | |||
compacting, watering etc. 2/3 no @ | Tk. 320.00 | per day | = | Tk. | 213.33 | |||
|
| LS | = | Tk. | 32.00 | |||
|
| Sub - Total | = | Tk. | 1,490.33 | |||
| Profit | 10.00% | = | Tk. | 149.03 | |||
| Overhead | 3.50% | = | Tk. | 52.16 | |||
|
| Total | = | Tk. | 1,691.52 | |||
Add VAT with adjustment factor | 1.06383 | 6.00% | = | Tk. | 107.97 | |||
|
| Grand Total | = | Tk. | 1,799.49 | |||
|
| Rate per cft | = | Tk. | 17.99 | |||
|
|
| Rate per cum | = | Tk. | 635.32 | ||
| Say, | Tk. 635 | .00 per cum |
|
|
| ||
|
|
|
|
|
|
| ||
Item No.- 02.10.2 |
|
|
|
|
| |||
Sand filling in foundation and plinth with local sand (F.M. 1.2) |
|
|
|
|
| |||
Considering 100 cft of work |
|
|
|
|
| |||
|
|
|
|
|
| |||
30% for compaction 130 cft @ | Tk. 1,400.00 | per % cft | = | Tk. | 1,820.00 | |||
| Tk. 600.00 | per day | = | Tk. | 75.00 | |||
compacting, watering etc. 2/3 no @ | Tk. 320.00 | per day | = | Tk. | 213.33 | |||
|
| LS | = | Tk. | 32.00 | |||
|
| Sub - Total | = | Tk. | 2,140.33 | |||
| Profit | 10.00% | = | Tk. | 214.03 | |||
| Overhead | 3.50% | = | Tk. | 74.91 | |||
|
| Total | = | Tk. | 2,429.27 | |||