Prev Next
īģŋ

 

Profit
Overhead

Sub - Total

10.00%

3.50%

=

=

=

Tk.
Tk.
Tk.

14,578.25

1,457.83

510.24

Total

=

Tk.

16,546.32

Add VAT with adjustment factor

1.06383

6.00%

=

Tk.

1,056.15

 

 

Grand Total

=

Tk.

17,602.47

 

 

Rate per cft

=

Tk.

17.60

 

 

Rate per cum

=

Tk.

621.54

Say, Tk.

622

.00 per cum

 

 

 

 

 

 

 

 

 

Item No.- 02.15.2

 

 

 

 

 

Earth filling in foundation trenches with carted earth carried by truck or any other means

 

 

 

 

 

Considering 1000 cft of work in/c compacting, dressing and local carriage

 

 

 

 

 

For Chittagong / Sylhet/ Narayanganj Area

 

 

 

 

 

Loose earth required in/c 15% shrinkage =

1,150.00

cft

 

 

 

1. Royalty for earth 1150 cft @ Tk.

1,715.00

per % 0 cft

=

Tk.

1,972.25

2 Truck hire charge including cost of labour for 6 Trips @ Tk.

loading and unloading

3 Lbour for loca crriage, levelling & compacting etc. complete:

  1. Ordinary labour 6 nos @ Tk.

1,200.00

320.00

per trip
per day

=

=

Tk. Tk.

7,200.00

1,920.00

  1. Skilled labour 1 no @ Tk.

390.00

per day

=

Tk.

390.00

4 Sundries, T & P etc.

 

LS

=

 

172.23

 

 

Sub - Total

=

Tk.

11,654.48

 

Profit

10.00%

=

Tk.

1,165.45

 

Overhead

3.50%

=

Tk.

407.91

 

 

Total

=

Tk.

13,227.84

Add VAT with adjustment factor

1.06383

6.00%

=

Tk.

844.33

 

 

Grand Total

=

Tk.

14,072.17

 

 

Rate per cft

=

Tk.

14.07

 

 

Rate per cum

=

Tk.

496.88

Say, Tk.

497

.00 per cum

 

 

 

 

 

 

 

 

 

Item No.- 02.15.3

 

 

 

 

 

Earth filling in foundation trenches with carted earth carried by truck or any other means

 

 

 

 

 

Considering 1000 cft of work in/c conmpacting, dressing and local carriage

 

 

 

 

 

For Rajshahi / Barisal / Khulna metropolitan area

 

 

 

 

 

Loose earth required in/c 15% shrinkage =

1,150.00

cft

 

 

 

1. Royalty for earth 1150 cft @ Tk.

1,715.00

per % 0 cft

=

Tk.

1,972.25

3. Truck hire charge including

cost of labour for loading

and unloading 6 Trips @ Tk.

950.00

per trips

=

Tk.

5,700.00

4. Labour for local carriage, levelling & compacting etc. complete:

 

 

 

 

 

  1. Ordinary labour 6 nos @ Tk.

320.00

per day

=

Tk.

1,920.00

  1. Skilled labour 1 no @ Tk.

390.00

per day

=

Tk.

390.00

5. Sundries, T & P etc.

 

LS

=

 

149.73

 

 

Sub - Total

=

Tk.

10,131.98

 

Profit

10.00%

=

Tk.

1,013.20

 

Overhead

3.50%

=

Tk.

354.62

 

 

Total

=

Tk.

11,499.80

Add VAT with adjustment factor

1.06383

6.00%

=

Tk.

734.03

 

 

Grand Total

=

Tk.

12,233.83

 

 

Rate per cft

=

Tk.

12.23

 

 

Rate per cum

=

Tk.

431.90

Say, Tk.

432

.00 per cum

 

 

 

 

 

 

 

 

 

Item No.- 02.15.4

 

 

 

 

 

Earth filling in foundation trenches with carted earth carried by truck or any other means

 

 

 

 

 

Considering 1000 cft of work in/c compacting, dressing and local carriage

 

 

 

 

 

(d) For other than Dhaka, Ctg., Sylhet, Rajshahi, Barisal, Khulna metropolitan area and N'ganj district

 

 

 

Loose earth required in/c 15% shrinkage = 1,150.00 cft