Prev Next


 

 

 

 

Rate per cum

=

Tk.

185.40

2.18.2

Say,

Tk.

185

.00 per cum

 

 

 

For each additional lift of one foot beyond 5'-0" and upto 10'-0"

 

 

 

 

 

Considering 1000 cft of excavation work

 

 

 

 

 

 

(i)

Extra labour 1/2 no @

Tk.

320.00

per day

=

Tk.

160.00

 

 

 

Profit

10.00%

=

Tk.

16.00

 

 

 

Overhead

3.50%

=

Tk.

5.60

 

 

 

 

Total

=

Tk.

181.60

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

11.59

 

 

 

 

Grand Total

=

Tk.

193.19

 

 

 

 

Rate per cft

=

Tk.

0.19

 

 

 

 

Rate per cum

=

Tk.

6.71

 

Say

Tk.

7

.00 per cum

 

 

 

2.18.3

For each additional lift of one foot beyond 10'-0" and upto 15'-0"

 

 

 

 

 

 

 

Considering 1000 cft of excavation work

 

 

 

 

 

 

(i)

Extra labour 3/4 no @

Tk.

320.00

per day

=

Tk.

240.00

 

 

 

Profit

10.00%

=

Tk.

24.00

 

 

 

Overhead

3.50%

=

Tk.

8.40

 

 

 

 

Total

=

Tk.

272.40

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

17.39

 

 

 

 

Grand Total

=

Tk.

289.79

 

 

 

 

Rate per cft

=

Tk.

0.29

 

 

 

 

Rate per cum

=

Tk.

10.24

 

Say

Tk.

10

.00 per cum

 

 

 

2.18.4

For each additional lift of one foot beyond 15'-0" and upto 20'-0"

 

 

 

 

 

 

 

Considering 1000 cft of excavation work

 

 

 

 

 

 

(i)

Extra labour 1 no @

Tk.

320.00

per day

=

Tk.

320.00

 

 

 

Profit

10.00%

=

Tk.

32.00

 

 

 

Overhead

3.50%

=

Tk.

11.20

 

 

 

 

Total

=

Tk.

363.20

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

23.18

 

 

 

 

Grand Total

=

Tk.

386.38

 

 

 

 

Rate per cft

=

Tk.

0.39

 

 

 

 

Rate per cum

=

Tk.

13.77

2.18.5

Say,

Tk.

14

.00 per cum

 

 

 

Extra each additional lead of 100'-0"

 

 

 

 

 

Considering 1000 cft of excavation work

 

 

 

 

 

 

(i)

Extra labour 2 nos @

Tk.

320.00

per day

=

Tk.

640.00

 

 

 

Profit

10.00%

=

Tk.

64.00

 

 

 

Overhead

3.50%

=

Tk.

22.40

 

 

 

 

Total

=

Tk.

726.40

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

46.37

 

 

 

 

Grand Total

=

Tk.

772.77

 

 

 

 

Rate per cft

=

Tk.

0.77

 

 

 

 

Rate per cum

=

Tk.

27.19

 

Say

Tk.

27

.00 per cum

 

 

 

2.19.1

Bailing-out water using 1 cusec diesel operated pump set

 

 

 

 

 

 

 

Considering 1 day operation = 8 Hrs.

 

 

 

 

 

 

  1.  

Hire charge of pump including suction

 

 

 

 

 

 

 

and delivery pipe, connection, switch 1 day @

Tk.

1,200.00

per day

=

Tk.

1,200.00

  1.  

Fuel, lubricant, spares, maintenance etc.

 

 

LS

=

Tk.

600.00