Prev Next
īģŋ

  1.  
  2.  
  3.  
  4.  (viii)

Pump operator 1 no @

Helper 1 no @

Skilled labour for maintaining drainage 1 no @

Provide drainage facilities and connection to discharge system Tools and plant, sundries etc.

Tk.
Tk.
Tk.

600.00

390.00

390.00

per day
per day
per day

LS

LS

= = = = =

Tk. Tk. Tk. Tk. Tk.

600.00 390.00 390.00 250.00 150.00

 

 

 

 

Sub - Total

=

Tk.

3,580.00

 

 

 

Profit

10.00%

=

Tk.

358.00

 

 

 

Overhead

3.50%

=

Tk.

125.30

 

 

 

 

Total

=

Tk.

4,063.30

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

243.80

 

 

 

 

Grand Total

=

Tk.

4,307.10

 

 

 

 

Rate per hour

=

Tk.

538.39

2.19.2

Say,

Tk.

538

.00 per hour

 

 

 

Bailing-out water using 1 cusec pump electricity operated pump set

 

 

 

 

 

Considering 1 day operation = 8 Hrs.

 

 

 

 

 

 

  1.  

Hire charge of pump including suction

 

 

 

 

 

 

 

and delivery pipe, connection, switch 1 day @

Tk.

800.00

per day

=

Tk.

800.00

  1.  

Electricity, lubricant, spares, maintenance etc.

 

 

LS

=

Tk.

300.00

  1.  

Pump operator 1 no @

Tk.

600.00

per day

=

Tk.

600.00

  1.  

Helper 1 no @

Tk.

390.00

per day

=

Tk.

390.00

  1.  

Skilled labour for maintaining drainage 1 no @

Tk.

390.00

per day

=

Tk.

390.00

  1.  

Provide drainage facilities and connection to discharge facilities

 

 

LS

=

Tk.

250.00

(viii)

Tools and plant, sundries etc.

 

 

LS

=

Tk.

150.00

 

 

 

 

Sub - Total

=

Tk.

2,880.00

 

 

 

Profit

10.00%

=

Tk.

288.00

 

 

 

Overhead

3.50%

=

Tk.

100.80

 

 

 

 

Total

=

Tk.

3,268.80

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

196.13

 

 

 

 

Grand Total

=

Tk.

3,464.93

 

 

 

 

Rate per hour

=

Tk.

433.12

 

Say,

Tk.

433

.00 per hour