Prev Next


2. Laying cost 100 sft @ Tk. 3,496.00

Profit Overhead

Add VAT with adjustment factor 1.06383

per % sft

=

Tk.

3,496.00

Sub - Total

10.00%

3.50%

=

=

=

Tk.
Tk.
Tk.

11,896.00

1,189.60

416.36

Total

6.00%

=

=

Tk. Tk.

13,501.96

861.83

Grand Total Rate per sft Rate per sqm

=

=

=

Tk.
Tk.
Tk.

14,363.79

143.64

1,546.14

Say, Tk. 1,546 .00 per sqm

 

 

 

 

 

 

 

 

Item No.- 06.14.5

 

 

 

 

Country made mirror polished floor tiles of size 600 mm x 600 mm with adhesives

 

 

 

 

Considering 100 sft of work

  1. Cost of floor tiles 100 sft @ Tk. 100.00

per sft

=

Tk.

10,000.00

Add wastage

5%

=

Tk.

500.00

  1. Laying cost 100 sft @ Tk. 3,496.00

per % sft

=

Tk.

3,496.00

 

Sub - Total

=

Tk.

13,996.00

Profit

10.00%

=

Tk.

1,399.60

Overhead

3.50%

=

Tk.

489.86

 

Total

=

Tk.

15,885.46

Add VAT with adjustment factor 1.06383

6.00%

=

Tk.

1,013.97

 

Grand Total

=

Tk.

16,899.43

 

Rate per sft

=

Tk.

168.99

 

Rate per sqm

=

Tk.

1,819.01

Say, Tk. 1,819 .00 per sqm

 

 

 

 

 

 

 

 

Item No.- 06.14.6

 

 

 

 

Country made mirror polished floor tiles of size 800 mm x 800 mm with adhesives

 

 

 

 

Considering 100 sft of work

  1. Cost of floor tiles 100 sft @ Tk. 110.00

per sft

=

Tk.

11,000.00

Add wastage

5%

=

Tk.

550.00

  1. Laying cost 100 sft @ Tk. 3,496.00

per % sft

=

Tk.

3,496.00

 

Sub - Total

=

Tk.

15,046.00

Profit

10.00%

=

Tk.

1,504.60

Overhead

3.50%

=

Tk.

526.61

 

Total

=

Tk.

17,077.21

Add VAT with adjustment factor 1.06383

6.00%

=

Tk.

1,090.03

 

Grand Total

=

Tk.

18,167.24

 

Rate per sft

=

Tk.

181.67

 

Rate per sqm

=

Tk.

1,955.50

Say, Tk. 1,956 .00 per sqm

 

 

 

 

 

 

 

 

Item No.- 06.14.7

 

 

 

 

Country made mirror polished floor tiles of size 600 mm x 900 mm with adhesives

 

 

 

 

Considering 100 sft of work

  1. Cost of floor tiles 100 sft @ Tk. 132.00

per sft

=

Tk.

13,200.00

Add wastage

5%

=

Tk.

660.00

  1. Laying cost 100 sft @ Tk. 3,496.00

per % sft

=

Tk.

3,496.00

 

Sub - Total

=

Tk.

17,356.00

Profit

10.00%

=

Tk.

1,735.60

Overhead

3.50%

=

Tk.

607.46

 

Total

=

Tk.

19,699.06

Add VAT with adjustment factor 1.06383

6.00%

=

Tk.

1,257.39

 

Grand Total

=

Tk.

20,956.45

 

Rate per sft

=

Tk.

209.56

 

Rate per sqm

=

Tk.

2,255.70

Say, Tk. 2,256 .00 per sqm