07.9.11 Formwork/shuttering, prop and necessary supports etc. (steel) |
| Profit 1.06383 | per sqm 10.00% 3.50% | = = = | Tk. | 477.97 47.80 16.73 |
Waffle or Ribbed floor upto Ground Floor (From Secondary Input : Item C-20) Add VAT with adjustment factor | ||||||
Total 6.00% | = = | Tk. Tk. | 542.50 34.63 | |||
Grand Total | = | Tk. | 577.13 | |||
Say, | Tk. |
| 578 .00 per sqm |
| Tk. | 1,515.18 |
07.9.12.1 Formwork/shuttering, prop and necessary supports etc. (steel) |
|
| per sqm | = | ||
Arch, domes, vaults upto 8m span(for single use) |
| Profit | 10.00% | = | Tk. | 151.52 |
(From Secondary Input : Item C-21(i)) |
| Overhead | 3.50% | = | Tk. | 53.03 |
|
|
| Total | = | Tk. | 1,719.73 |
Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 109.77 |
|
|
| Grand Total | = | Tk. | 1,829.50 |
Say, | Tk. |
| 1,830 .00 per sqm |
| Tk. | 1,060.63 |
07.9.12.2 Formwork/shuttering, prop and necessary supports etc. (steel) |
|
| per sqm | = | ||
Arch, domes, vaults upto 8m span(for 2-times use) |
| Profit | 10.00% | = | Tk. | 106.06 |
(From Secondary Input : Item C-21(ii)) |
| Overhead | 3.50% | = | Tk. | 37.12 |
|
|
| Total | = | Tk. | 1,203.81 |
Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 76.84 |
|
|
| Grand Total | = | Tk. | 1,280.65 |
Say, | Tk. |
| 1,281 .00 per sqm |
| Tk. | 757.59 |
07.9.12.3 Formwork/shuttering, prop and necessary supports etc. (steel) |
|
| per sqm | = | ||
Arch, domes, vaults upto 8m span(for 3-times use) |
| Profit | 10.00% | = | Tk. | 75.76 |
(From Secondary Input : Item C-21(iii)) |
| Overhead | 3.50% | = | Tk. | 26.52 |
|
|
| Total | = | Tk. | 859.87 |
Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 54.89 |
|
|
| Grand Total | = | Tk. | 914.76 |
Say, | Tk. |
| 915 .00 per sqm |
| Tk. | 530.31 |
07.9.12.4 Formwork/shuttering, prop and necessary supports etc. (steel) |
|
| per sqm | = | ||
Arch, domes, vaults upto 8m span(for more than 3-times use) |
| Profit | 10.00% | = | Tk. | 53.03 |
(From Secondary Input : Item C-21(iv)) |
| Overhead | 3.50% | = | Tk. | 18.56 |
|
|
| Total | = | Tk. | 601.90 |
Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 38.42 |
|
|
| Grand Total | = | Tk. | 640.32 |
Say, | Tk. |
| 641 .00 per sqm |
|
|
|
|
|
|
|
|
|
|
IItem No.- 07.10 |
|
|
|
|
|
|
Extra for Formwork/shuttering, prop and necessary supports etc. (steel) |
|
| per sqm | = | Tk. | 378.80 |
Arch, domes, vaults exceeding 8m span |
| Profit | 10.00% | = | Tk. | 37.88 |
(From Secondary Input : Item C-21(v)) |
| Overhead | 3.50% | = | Tk. | 13.26 |
|
|
| Total | = | Tk. | 429.94 |
Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 27.44 |
|
|
| Grand Total | = | Tk. | 457.38 |
Say, | Tk. |
| 458 .00 per sqm |
|
|
|
|
|
|
|
|
|
|
IItem No.- 07.11 |
|
|
|
|
|
|
Extra for Formwork/shuttering, prop and necessary supports etc. (steel) |
|
| per sqm | = | Tk. | 75.28 |
in circular work |
| Profit | 10.00% | = | Tk. | 7.53 |
|
| Overhead | 3.50% | = | Tk. | 2.63 |
|
|
| Total | = | Tk. | 85.44 |
Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 5.45 |