07.9.11 Formwork/shuttering, prop and necessary supports etc. (steel)

 

Profit
Overhead

1.06383

per sqm

10.00%

3.50%

=

=

=

Tk.
Tk.
Tk.

477.97

47.80

16.73

Waffle or Ribbed floor upto Ground Floor (From Secondary Input : Item C-20)

Add VAT with adjustment factor

Total

6.00%

=

=

Tk. Tk.

542.50

34.63

Grand Total

=

Tk.

577.13

Say,

Tk.

 

578 .00 per sqm

 

Tk.

1,515.18

07.9.12.1 Formwork/shuttering, prop and necessary supports etc. (steel)

 

 

per sqm

=

Arch, domes, vaults upto 8m span(for single use)

 

Profit

10.00%

=

Tk.

151.52

(From Secondary Input : Item C-21(i))

 

Overhead

3.50%

=

Tk.

53.03

 

 

 

Total

=

Tk.

1,719.73

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

109.77

 

 

 

Grand Total

=

Tk.

1,829.50

Say,

Tk.

 

1,830 .00 per sqm

 

Tk.

1,060.63

07.9.12.2 Formwork/shuttering, prop and necessary supports etc. (steel)

 

 

per sqm

=

Arch, domes, vaults upto 8m span(for 2-times use)

 

Profit

10.00%

=

Tk.

106.06

(From Secondary Input : Item C-21(ii))

 

Overhead

3.50%

=

Tk.

37.12

 

 

 

Total

=

Tk.

1,203.81

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

76.84

 

 

 

Grand Total

=

Tk.

1,280.65

Say,

Tk.

 

1,281 .00 per sqm

 

Tk.

757.59

07.9.12.3 Formwork/shuttering, prop and necessary supports etc. (steel)

 

 

per sqm

=

Arch, domes, vaults upto 8m span(for 3-times use)

 

Profit

10.00%

=

Tk.

75.76

(From Secondary Input : Item C-21(iii))

 

Overhead

3.50%

=

Tk.

26.52

 

 

 

Total

=

Tk.

859.87

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

54.89

 

 

 

Grand Total

=

Tk.

914.76

Say,

Tk.

 

915 .00 per sqm

 

Tk.

530.31

07.9.12.4 Formwork/shuttering, prop and necessary supports etc. (steel)

 

 

per sqm

=

Arch, domes, vaults upto 8m span(for more than 3-times use)

 

Profit

10.00%

=

Tk.

53.03

(From Secondary Input : Item C-21(iv))

 

Overhead

3.50%

=

Tk.

18.56

 

 

 

Total

=

Tk.

601.90

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

38.42

 

 

 

Grand Total

=

Tk.

640.32

Say,

Tk.

 

641 .00 per sqm

 

 

 

 

 

 

 

 

 

 

IItem No.- 07.10

 

 

 

 

 

 

Extra for Formwork/shuttering, prop and necessary supports etc. (steel)

 

 

per sqm

=

Tk.

378.80

Arch, domes, vaults exceeding 8m span

 

Profit

10.00%

=

Tk.

37.88

(From Secondary Input : Item C-21(v))

 

Overhead

3.50%

=

Tk.

13.26

 

 

 

Total

=

Tk.

429.94

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

27.44

 

 

 

Grand Total

=

Tk.

457.38

Say,

Tk.

 

458 .00 per sqm

 

 

 

 

 

 

 

 

 

 

IItem No.- 07.11

 

 

 

 

 

 

Extra for Formwork/shuttering, prop and necessary supports etc. (steel)

 

 

per sqm

=

Tk.

75.28

in circular work

 

Profit

10.00%

=

Tk.

7.53

 

 

Overhead

3.50%

=

Tk.

2.63

 

 

 

Total

=

Tk.

85.44

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

5.45