(iii) 1.5" x 3/16" F.I . bar: @ 1'-0" c/c

Stiffner: 6 x 25 x 1'-2"= 140.00

Clamps: 6 x 16 x 6"= 48.00

rft rft

 

 

 

 

 

= 188.00

Add 5% wastage= 9.4

rft rft

= 197.40

rft

@ 0.956 Ibs per rft= 188.71

Ibs @ Tk.

24.94

per Ib

=

Tk.

4,706.43

  1. Cost of nuts & bolts: 25
  2. Manufacturing, fitting and fixing frame in/c drilling holes, welding & supplying of chemicals etc.:

kg @ Tk.

160.00

per kg

=

Tk.

4,000.00

2 x 6 x 50 x 1'-2"= 700.00

sft @ Tk.

75.00

per sft

=

Tk.

52,500.00

 

 

 

Total

=

Tk.

212,438.21

  1. Labour for fitting & fixing steel shuttering

in position as required 700.00

  1. Hessian tap for makin

shutter water proof 700.00

sft @ Tk.

sft @ Tk.

Using 16 times

10.00 per sft

1.25 per sft

=

=

=

Tk.
Tk.
Tk.

13,277.39

7,000.00

875.00

  1. Curing 700.00

sft @ Tk.

2.67

per sft

=

Tk.

1,281.60

 

 

 

Total

=

Tk.

22,433.99

 

 

Cost for 100 cft of work

=

Tk.

2,996.75

D. Cost of bed preparation:

 

 

 

 

 

 

Area of bed: 1 x 55'-0" x 13'-0"= 715.00

sft

 

 

 

 

 

(i) One layer brick flat soling: 715.00

(ii) 1/2" thick cement plaster

with neat cement finishing 715.00

sft @ Tk.

sft @ Tk.

0.32

21.58

per sft
per sft

=

=

Tk. Tk.

228.80

15,429.70

 

 

 

Total

=

Tk.

15,658.50

 

 

Cost for 100 cft of work

=

Tk.

2,091.68

 

 

Using 8 times

=

Tk.

261.46

E. Polythene as separator between pile layers

during casting concrete 715.00

sft @ Tk.

319.44 per % sft

=

Tk.

2,284.00

 

 

Cost for 100 cft of work

=

Tk.

305.10

Abstract of cosr for 100 cft of work

 

 

 

 

 

  1. Cost of concrete

 

 

 

=

Tk.

28,198.75

  1. Labour, machinery, fuel and lubricant for casting

 

 

 

=

Tk.

1,199.80

  1. Cost of shuttering

 

 

 

=

Tk.

2,996.75

  1. Cost of bed preparation

 

 

 

=

Tk.

261.46

  1. Polythene

 

 

 

=

Tk.

305.10

 

 

 

Sub - Total

=

Tk.

32,961.86

 

 

Profit

10.00%

=

Tk.

3,296.19

 

 

Overhead

3.50%

=

Tk.

1,153.67

 

 

 

Total

=

Tk.

37,411.72

Add VAT with adjustment factor

1.06383

6.00%

=

Tk.

2,387.98

 

 

 

Grand Total

=

Tk.

39,799.70

 

 

 

Rate per cft

=

Tk.

398.00

 

 

 

Rate per rft

=

Tk.

541.49

 

 

 

Rate per rm

=

Tk.

1,776.63

 

Say, Tk.

1,777

.00 per meter

 

 

 

 

 

 

 

 

 

 

Item No.- 09.10.4

 

 

 

 

 

 

16" x 16" Pre-cast pile with reinforced cement concrete (1 : 1.25 : 2.5) with stone chips.

 

 

 

 

 

Considering 55 rft long 16" x 16" size pile

 

 

 

 

 

Also considering 56.25 rft long pile making work using 100 cft concrete

 

 

 

 

 

  1. Cost of concrete materials

 

 

 

=

Tk.

28,198.75

  1. Labour, machinery, fuel & lubricants for casting

 

 

 

=

Tk.

1,199.80

  1. Cost of shuttering for 11 No. of pile

 

 

 

 

 

 

Volume of concrete:

 

 

 

 

 

 

11 x 16" x 16" x 55'-0" = 1075.56 cft

(a) Cost of shuttering:

 

 

 

 

 

 

(i) 14 BWG steel sheet:

 

 

 

 

 

 

Sides: 14 x 55'-0" x 1'-4"= 1026.67

Add wastage 5%= 51.33

sft sft