2 x 12 x 2'-6" x 6.25" x 1"= 2.604 cft Bit: 2 x 4 x 2'-3" x 0.5" x 0.5"= 0.031 cft |
|
|
|
|
|
|
|
= 4.465 cft | @ | Tk. | 2,390.00 | per cft | = | Tk. | 10,671.35 |
| @ | Tk. | 65.00 | per kg | = | Tk. | 97.50 |
Labour charge for making louver frames, cutting grooves, fitting, fixing horizontal louver blades, fitting wooden bit etc.
| @ | Tk. | 600.00 | per day | = | Tk. | 900.00 |
| @ | Tk. | 390.00 | per day | = | Tk. | 585.00 |
|
|
|
| Sub - Total | = | Tk. | 12,253.85 |
|
|
| Profit | 10.00% | = | Tk. | 1,225.39 |
|
|
| Overhead | 3.50% | = | Tk. | 428.88 |
|
|
|
| Total | = | Tk. | 13,908.12 |
Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 887.75 | |
|
|
|
| Grand Total | = | Tk. | 14,795.87 |
|
|
|
| Rate per sft | = | Tk. | 1,108.30 |
|
|
|
| Rate per sqm | = | Tk. | 11,929.74 |
| Say, | Tk. | 11,930 .00 per sqm |
|
|
| |
|
|
|
|
|
|
|
|
Item No.- 12.8.4 |
|
|
|
|
|
|
|
Supplying, fitting & fixing seasoned wooden fixed louver shutter |
|
|
|
|
|
|
|
For 1 No. louver shutter |
|
|
|
|
|
|
|
Considering 5'-0" x 2'-8" = 13.35 sft of work |
|
|
|
|
|
|
|
For Burma Teak (a) Cost of wood |
|
|
|
|
|
|
|
Frame: 2 x 5'-0" x 2.75" x 5.25"= 1.003 cft |
|
|
|
|
|
|
|
Frame: 3 x 2'-9" x 2.75" x 5.25"= 0.827 cft |
|
|
|
|
|
|
|
In horizontal louver blade: 2" c/c |
|
|
|
|
|
|
|
2 x 12 x 2'-6" x 6.25" x 1"= 2.604 cft |
|
|
|
|
|
|
|
Bit: 2 x 4 x 2'-3" x 0.5" x 0.5"= 0.031 cft |
|
|
|
|
|
|
|
= 4.465 cft | @ | Tk. | 6,500.00 | per cft | = | Tk. | 29,022.50 |
| @ | Tk. | 65.00 | per kg | = | Tk. | 97.50 |
Labour charge for making louver frames, cutting grooves, fitting, fixing horizontal louver blades, fitting wooden bit etc.
| @ | Tk. | 600.00 | per day | = | Tk. | 900.00 |
| @ | Tk. | 390.00 | per day | = | Tk. | 585.00 |
|
|
|
| Sub - Total | = | Tk. | 30,605.00 |
|
|
| Profit | 10.00% | = | Tk. | 3,060.50 |
|
|
| Overhead | 3.50% | = | Tk. | 1,071.18 |
|
|
|
| Total | = | Tk. | 34,736.68 |
Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 2,217.24 | |
|
|
|
| Grand Total | = | Tk. | 36,953.92 |
|
|
|
| Rate per sft | = | Tk. | 2,768.08 |
|
|
|
| Rate per sqm | = | Tk. | 29,795.61 |
| Say, | Tk. | 29,796 .00 per sqm |
|
|
| |
|
|
|
|
|
|
|
|
Item No.- 12.9.1 |
|
|
|
|
|
|
|
Supplying, fitting & fixing seasoned wood glazed ventilator louver shutter |
|
|
|
|
|
|
|
For 1 No. louver shutter |
|
|
|
|
|
|
|
Considering 5'-0" x 2'-8" = 13.35 sft of work |
|
|
|
|
|
|
|
For Gamar wood (a) Cost of materials (i) Wood: Outer frame: |
|
|
|
|
|
|
|
2 x 5'-0" x 2.75" x 5.25" = 1.003 cft |
|
|
|
|
|
|
|
3 x 2'-9" x 2.75" x 5.25 = 0.827 cft |
|
|
|
|
|
|
|
Inner shutter frame |
|
|
|
|
|
|
|
2 x 2 x 2'-3.5" x 2.25" x 1.75" = 0.250 cft |
|
|
|
|
|
|
|
2 x 2 x 2'-4" x 2.25" x 1.65" = 0.255 cft sash, 2 x 3 x 2'-3.5" x 1.25" x 1.75" = 0.292 cft |
|
|
|
|
|
|
|