2 x 12 x 2'-6" x 6.25" x 1"= 2.604 cft

Bit: 2 x 4 x 2'-3" x 0.5" x 0.5"= 0.031 cft

 

 

 

 

 

 

 

= 4.465 cft

@

Tk.

2,390.00

per cft

=

Tk.

10,671.35

  1. Nails etc. 1.5 kg
  2. Labour cost:

@

Tk.

65.00

per kg

=

Tk.

97.50

Labour charge for making louver frames, cutting grooves, fitting, fixing horizontal louver blades, fitting wooden bit etc.

  1. Carpenter 1.5 nos

@

Tk.

600.00

per day

=

Tk.

900.00

  1. Carpenter helper 1.5 nos

@

Tk.

390.00

per day

=

Tk.

585.00

 

 

 

 

Sub - Total

=

Tk.

12,253.85

 

 

 

Profit

10.00%

=

Tk.

1,225.39

 

 

 

Overhead

3.50%

=

Tk.

428.88

 

 

 

 

Total

=

Tk.

13,908.12

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

887.75

 

 

 

 

Grand Total

=

Tk.

14,795.87

 

 

 

 

Rate per sft

=

Tk.

1,108.30

 

 

 

 

Rate per sqm

=

Tk.

11,929.74

 

Say,

Tk.

11,930 .00 per sqm

 

 

 

 

 

 

 

 

 

 

 

Item No.- 12.8.4

 

 

 

 

 

 

 

Supplying, fitting & fixing seasoned wooden fixed louver shutter

 

 

 

 

 

 

 

For 1 No. louver shutter

 

 

 

 

 

 

 

Considering 5'-0" x 2'-8" = 13.35 sft of work

 

 

 

 

 

 

 

For Burma Teak

(a) Cost of wood

 

 

 

 

 

 

 

Frame: 2 x 5'-0" x 2.75" x 5.25"= 1.003 cft

 

 

 

 

 

 

 

Frame: 3 x 2'-9" x 2.75" x 5.25"= 0.827 cft

 

 

 

 

 

 

 

In horizontal louver blade: 2" c/c

 

 

 

 

 

 

 

2 x 12 x 2'-6" x 6.25" x 1"= 2.604 cft

 

 

 

 

 

 

 

Bit: 2 x 4 x 2'-3" x 0.5" x 0.5"= 0.031 cft

 

 

 

 

 

 

 

= 4.465 cft

@

Tk.

6,500.00

per cft

=

Tk.

29,022.50

  1. Nails etc. 1.5 kg
  2. Labour cost:

@

Tk.

65.00

per kg

=

Tk.

97.50

Labour charge for making louver frames, cutting grooves, fitting, fixing horizontal louver blades, fitting wooden bit etc.

  1. Carpenter 1.5 nos

@

Tk.

600.00

per day

=

Tk.

900.00

  1. Carpenter helper 1.5 nos

@

Tk.

390.00

per day

=

Tk.

585.00

 

 

 

 

Sub - Total

=

Tk.

30,605.00

 

 

 

Profit

10.00%

=

Tk.

3,060.50

 

 

 

Overhead

3.50%

=

Tk.

1,071.18

 

 

 

 

Total

=

Tk.

34,736.68

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

2,217.24

 

 

 

 

Grand Total

=

Tk.

36,953.92

 

 

 

 

Rate per sft

=

Tk.

2,768.08

 

 

 

 

Rate per sqm

=

Tk.

29,795.61

 

Say,

Tk.

29,796 .00 per sqm

 

 

 

 

 

 

 

 

 

 

 

Item No.- 12.9.1

 

 

 

 

 

 

 

Supplying, fitting & fixing seasoned wood glazed ventilator louver shutter

 

 

 

 

 

 

 

For 1 No. louver shutter

 

 

 

 

 

 

 

Considering 5'-0" x 2'-8" = 13.35 sft of work

 

 

 

 

 

 

 

For Gamar wood

(a) Cost of materials

(i) Wood: Outer frame:

 

 

 

 

 

 

 

2 x 5'-0" x 2.75" x 5.25" = 1.003 cft

 

 

 

 

 

 

 

3 x 2'-9" x 2.75" x 5.25 = 0.827 cft

 

 

 

 

 

 

 

Inner shutter frame

 

 

 

 

 

 

 

2 x 2 x 2'-3.5" x 2.25" x 1.75" = 0.250 cft

 

 

 

 

 

 

 

2 x 2 x 2'-4" x 2.25" x 1.65" = 0.255 cft

sash, 2 x 3 x 2'-3.5" x 1.25" x 1.75" = 0.292 cft