= 5.25 rft |
|
|
|
|
|
|
|
= 2.22 Ibs (b) Fittings
| @ @ | Tk. Tk. | 24.94 20.00 | per Ib | = = | Tk. Tk. | 55.37 40.00 |
| @ | Tk. | 30.00 | each | = | Tk. | 60.00 |
| @ | Tk. | 25.00 | each | = | Tk. | 100.00 |
(c) Workshop charges: | @ | Tk. | 35.00 | each | = | Tk. | 140.00 |
Manufacturing including fabrication, revetting, welding in/c supply of all necessary incidental materials. 15 sft (d) Labour charges | @ | Tk. | 65.00 | per sft | = | Tk. | 975.00 |
Labour charges for fitting fixing in position finished window shutter and frames in the building including embeding clamp in |
|
|
|
|
|
|
|
CC (1:2:4) & making grooves and mending good the damage etc. complete. 1 no (e) Carriage charges: | @ | Tk. | 172.87 | per sft | = | Tk. | 172.87 |
Carriage charge for iron materials from market to workshop & carrying the finished window from workshop to building site. 1 no (f) Glass panes: | @ | Tk. | 70.00 | each | = | Tk. | 70.00 |
iron pins & pucca putty 15 sft | @ @ | Tk. Tk. | 40.00 16.00 | per sft | = = | Tk. Tk. | 600.00 240.00 |
|
|
|
| Sub - Total | = | Tk. | 3,835.92 |
|
| Profit | 10.00% | = | Tk. | 383.59 | |
|
| Overhead | 3.50% | = | Tk. | 134.26 | |
|
|
|
| Total | = | Tk. | 4,353.77 |
Add VAT with adjustment factor | 1.06383 | 6.00% | = | Tk. | 277.90 | ||
|
|
|
| Grand Total | = | Tk. | 4,631.67 |
|
|
|
| Rate per sft | = | Tk. | 308.78 |
|
|
|
| Rate per sqm | = | Tk. | 3,323.71 |
| Say, | Tk. | 3,324 .00 per sqm |
|
|
| |
|
|
|
|
|
|
|
|
Item No.- 12.17 |
|
|
|
|
| ||
Supplying, fitting & fixing of fixed glazed frame with outer member of 3/4" x 3/4" x 3/4" x 1/8" Z |
|
|
|
|
| ||
& 3/4" x 3/4" x 1/8" T-section etc. |
|
|
|
|
|
|
|
Considering 1 No. fixed glazed frame |
|
|
|
|
|
|
|
For 5'-0" x 2'-0"= 10 sft of work (a) Steel materials: |
|
|
|
|
|
|
|
2 x 5'-0" + 2 x 2'-0"= 14.00 rft |
|
|
|
|
|
|
|
Add wastage 5%= 0.70 rft | @ | Tk. | 24.94 | per Ib | = | Tk. | 351.90 |
= 14.70 rft = 14.11 Ibs
(@ 0.32 Ibs per rft) for horizontal and vertical divider 2 x (1 x 5'-0") + 2 x (2 x 5 x 1'-0")= 30.00 rft | |||||||
Add wastage 5%= 1.50 rft | @ | Tk. | 24.94 | per Ib | = | Tk. | 510.77 |
= 31.50 rft = 20.48 Ibs | |||||||
(b) Workshop charges: | @ | Tk. | 35.00 | each | = | Tk. | 210.00 |
Manufacturing including fabrication, revetting, welding in/c supply of all necessary incidental materials 10 sft (c) Labour charges | @ | Tk. | 65.00 | per sft | = | Tk. | 650.00 |
Labour charges for fitting fixing in position finished window frames in the building shutter and including embeding clamp in |
|
|
|
|
|
|
|
CC (1:2:4) & making grooves and mending good the damage etc. complete. 1 no | @ | Tk. | 172.87 | per sft | = | Tk. | 172.87 |