Prev Next
īģŋ

= 5.25 rft

 

 

 

 

 

 

 

= 2.22 Ibs

(b) Fittings

  1. Stopper handle 2 nos

@

@

Tk. Tk.

24.94

20.00

per Ib
each

=

=

Tk. Tk.

55.37

40.00

  1. 12" long iron cleats 2 nos

@

Tk.

30.00

each

=

Tk.

60.00

  1. 2" long pin hinges 4 nos

@

Tk.

25.00

each

=

Tk.

100.00

  1. 6" long clamp for chowkat 4 nos

(c) Workshop charges:

@

Tk.

35.00

each

=

Tk.

140.00

Manufacturing including fabrication, revetting, welding in/c supply of all

necessary incidental materials. 15 sft

(d) Labour charges

@

Tk.

65.00

per sft

=

Tk.

975.00

Labour charges for fitting fixing in position finished window shutter and frames in the building including embeding clamp in

 

 

 

 

 

 

 

CC (1:2:4) & making grooves and mending

good the damage etc. complete. 1 no

(e) Carriage charges:

@

Tk.

172.87

per sft

=

Tk.

172.87

Carriage charge for iron materials from market to workshop & carrying the finished window

from workshop to building site. 1 no

(f) Glass panes:

@

Tk.

70.00

each

=

Tk.

70.00

  1. 3 mm glass panes in/c wastage etc. 15 sft
  2. Fitting fixing of glass panes with necessary

iron pins & pucca putty 15 sft

@

@

Tk. Tk.

40.00

16.00

per sft
per sft

=

=

Tk. Tk.

600.00

240.00

 

 

 

 

Sub - Total

=

Tk.

3,835.92

 

 

Profit

10.00%

=

Tk.

383.59

 

 

Overhead

3.50%

=

Tk.

134.26

 

 

 

 

Total

=

Tk.

4,353.77

Add VAT with adjustment factor

1.06383

6.00%

=

Tk.

277.90

 

 

 

 

Grand Total

=

Tk.

4,631.67

 

 

 

 

Rate per sft

=

Tk.

308.78

 

 

 

 

Rate per sqm

=

Tk.

3,323.71

 

Say,

Tk.

3,324 .00 per sqm

 

 

 

 

 

 

 

 

 

 

 

Item No.- 12.17

 

 

 

 

 

Supplying, fitting & fixing of fixed glazed frame with outer member of 3/4" x 3/4" x 3/4" x 1/8" Z

 

 

 

 

 

& 3/4" x 3/4" x 1/8" T-section etc.

 

 

 

 

 

 

 

Considering 1 No. fixed glazed frame

 

 

 

 

 

 

 

For 5'-0" x 2'-0"= 10 sft of work

(a) Steel materials:

 

 

 

 

 

 

 

  1. 3/4" x 3/4" x 3/4" x 1/8" Z-section (@0.96 Ib per rft):

2 x 5'-0" + 2 x 2'-0"= 14.00 rft

 

 

 

 

 

 

 

Add wastage 5%= 0.70 rft

@

Tk.

24.94

per Ib

=

Tk.

351.90

= 14.70 rft

= 14.11 Ibs

  1. 3/4" x 1/8" F.I. bar to make T-section

(@ 0.32 Ibs per rft) for horizontal and vertical divider

2 x (1 x 5'-0") + 2 x (2 x 5 x 1'-0")= 30.00 rft

Add wastage 5%= 1.50 rft

@

Tk.

24.94

per Ib

=

Tk.

510.77

= 31.50 rft

= 20.48 Ibs

  1. 6" long clamp for chowkat: 6.00 nos

(b) Workshop charges:

@

Tk.

35.00

each

=

Tk.

210.00

Manufacturing including fabrication, revetting, welding in/c supply of all

necessary incidental materials 10 sft

(c) Labour charges

@

Tk.

65.00

per sft

=

Tk.

650.00

Labour charges for fitting fixing in position finished window frames in the building shutter and including embeding clamp in

 

 

 

 

 

 

 

CC (1:2:4) & making grooves and mending

good the damage etc. complete. 1 no

@

Tk.

172.87

per sft

=

Tk.

172.87