Total (A+B+C)

=

 

10,037.24

Profit

10.00%

=

Tk.

1,003.72

Overhead

3.50%

=

Tk.

351.30

 

Total

=

Tk.

11,392.26

Add VAT with adjustment factor 1.06383

6.00%

=

Tk.

727.17

 

Grand Total

=

Tk.

12,119.43

 

Rate per sft

=

Tk.

1,009.95

 

Rate per sqm

=

Tk.

10,871.10

Say, Tk. 10,871 .00 per sqm

 

 

 

 

 

 

 

 

Item No.- 14.9.4

 

 

 

 

Supplying, fitting and fixing aluminium top hung/casement window (powder coated approved colour)

 

 

 

 

Considering 1 No. window

 

 

 

 

Considering 3'-0" x 4'-0" = 12 sft of work

(A) Cost of aluminium sections:

 

 

 

 

  1. 38.88 mm, 36.63 mm casement outer 1.5 mm thick

2 x 4'-0"= 8 rft

2 x 3'-0"= 6 rft

per rft

=

Tk.

784.00

= 14 rft @ Tk. 56.00

  1. 47.62 mm, 28.57 mm, 40.82 mm casement shutter of 1.9 mm thick

4 x 4'-0"= 16 rft

2 x 3'-0"= 6 rft

per rft

=

Tk.

2,134.00

= 22 rft @ Tk. 97.00

  1. 15.87 mm, 27.00 mm shutter glass clip of 1.245 mm thick

4 x 4'-0"= 16

2 x 3'-0"= 6

per rft

=

Tk.

638.00

= 22 rft @ Tk. 29.00

  1. 1" x 1" square pipe 4 rft @ Tk. 21.00

per rft

 

Tk.

84.00

 

 

=

Tk.

3,640.00

Add cutting wastage

3%

=

Tk.

109.20

 

Total (A)

=

Tk.

3,749.20

(B) Cost of accessories:

 

 

 

 

  1. 4-bar hinge 4 nos @ Tk. 700.00

per set

=

Tk.

2,800.00

  1. Casement handle 2 nos @ Tk. 260.00

each

=

Tk.

520.00

  1. Bolts and screws in/c sealants

LS

=

Tk.

585.88

 

Total (B)

=

Tk.

3,905.88

(C) Labour charge for fabrication, assembling and fitting-fixing in position

 

 

 

 

  1. Skilled technician 1.50 no @ Tk. 1,000.00

each

=

Tk.

1,500.00

  1. Semi- skilled technician 1.50 no @ Tk. 600.00

each

=

Tk.

900.00

  1. Tools and plant, sundries etc.

LS

=

Tk.

320.00

 

Sub total (C)

=

Tk.

2,720.00

 

Total (A+B+C)

=

 

10,375.08

Profit

10.00%

=

Tk.

1,037.51

Overhead

3.50%

=

Tk.

363.13

 

Total

=

Tk.

11,775.72

Add VAT with adjustment factor 1.06383

6.00%

=

Tk.

751.64

 

Grand Total

=

Tk.

12,527.36

 

Rate per sft

=

Tk.

1,043.95

 

Rate per sqm

=

Tk.

11,237.08

Say, Tk. 11,237 .00 per sqm

 

 

 

 

 

 

 

 

Item No.- 14.10.1.1

 

 

 

 

Supplying, fitting and fixing of corrugated aluminium curtain wall (S.S. colour/Black colour)

 

 

 

 

Considering 1 No. curtain

 

 

 

 

Considering 10'-0" x 7'-0"= 70 sft of work

(A) Cost of aluminium sections

1. 37.78 mm, 31.78 mm bottom cover