of 1.2 mm thick

 

 

 

 

 

 

3 x 10'-0"= 30 rft @

Tk.

40.00

per rft

=

Tk.

1,200.00

2. 76.20 mm, 38.10 mm grouve cover

of 1.2 mm thick

3 x 10'-0"= 30 rft @

Tk.

90.00

per rft

=

Tk.

2,700.00

3. 57.15 mm, 15.80 mm grouve cover

of 1.2 mm thick

2 x 7'-0"= 14 rft

2 x 10'-0"= 20 rft

Tk.

60.00

per rft

=

Tk.

2,040.00

= 34 rft @

4. 76.20 mm, 38.10 mm, 57.15 mm top

& side of 1.5 mm thick

4 x 7'-0"= 28 rft

1 x 10'-0"= 10 rft

= 38 rft @

Tk.

118.00

per rft

=

Tk.

4,484.00

5. 7.14 mm span drel of 1.5 mm thick

22 x 7'-0"= 154 rft @

Tk.

90.00

per rft

=

Tk.

13,860.00

 

 

 

 

=

Tk.

24,284.00

 

 

Cutting wastage

5%

=

Tk.

1,214.20

 

 

 

Sub total (A)

=

Tk.

25,498.20

(B) Cost of accessories:

 

 

 

 

 

 

  1. Rivet 100 pcs @

Tk.

5.00

per pc

=

Tk.

500.00

  1. Screws 14 pcs @

Tk.

1.00

per pc

=

Tk.

14.00

  1. Fixed neoprene 204 rft @

Tk.

2.70

per rft

=

Tk.

550.80

 

 

 

Sub total (B)

=

Tk.

1,064.80

(C) Labour charge for fabrication, assembling and fitting-fixing in position

 

 

 

 

 

 

  1. Skilled technician 2.75 no @

Tk.

1,000.00

each

=

Tk.

2,750.00

  1. Semi- skilled technician 2.75 no @

Tk.

600.00

each

=

Tk.

1,650.00

  1. Tools and plant, sundries etc.

 

 

LS

=

Tk.

640.00

 

 

 

Sub total (C)

=

Tk.

5,040.00

 

 

 

Total (A+B+C)

=

 

31,603.00

 

 

Profit

10.00%

=

Tk.

3,160.30

 

 

Overhead

3.50%

=

Tk.

1,106.11

 

 

 

Total

=

Tk.

35,869.41

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

2,289.54

 

 

 

Grand Total

=

Tk.

38,158.95

 

 

 

Rate per sft

=

Tk.

545.13

 

 

 

Rate per sqm

=

Tk.

5,867.78

Say,

Tk.

5,868 .00 per sqm

 

 

 

 

 

 

 

 

 

 

Item No.- 14.10.1.2

 

 

 

 

 

 

Supplying, fitting and fixing of corrugated aluminium curtain wall (bronze colour)

 

 

 

 

 

 

Considering 1 No. curtain

 

 

 

 

 

 

Considering 10'-0" x 7'-0"= 70 sft of work

 

 

 

 

 

 

(A) Cost of aluminium sections

 

 

 

 

 

 

1. 37.78 mm, 31.78 mm bottom cover

of 1.5 mm thick

 

 

 

 

 

 

3 x 10'-0"= 30 rft @

Tk.

39.00

per rft

=

Tk.

1,170.00

2. 76.20 mm, 38.10 mm grouve cover

of 1.5 mm thick

3 x 10'-0"= 30 rft @

Tk.

88.00

per rft

=

Tk.

2,640.00

3. 57.15 mm, 15.80 mm grouve cover

of 1.5 mm thick

2 x 7'-0"= 14 rft

2 x 10'-0"= 20 rft

Tk.

59.00

per rft

=

Tk.

2,006.00

= 34 rft @

4. 76.20 mm, 38.10 mm, 57.15 mm top

& side of 1.5 mm thick

4 x 7'-0"= 28 rft

1 x 10'-0"= 10 rft

= 38 rft @

Tk.

115.00

per rft

=

Tk.

4,370.00