Prev Next
īģŋ

Item No.- 15.5

 

 

 

 

 

 

 

 

1/4" thick cement plaster (1:4) to ceiling, column, beams etc. and all other RCC surfaces Considering 100 sft of work

 

 

 

 

  1. Sand (F.M. 1.2)

2.5

cft

@

Tk.

1,400.00 per % cft

=

Tk.

35.00

  1. Cement

0.5

bag

@

Tk.

395.00 per bag

=

Tk.

197.50

  1. Extra cement for grouting
  2. Labour
  1. Head mason

0.125

0.25

bag
no

@

@

Tk. Tk.

395.00 per bag

600.00 per day

=

=

Tk. Tk.

49.38

150.00

  1. Mason

1.00

no

@

Tk.

500.00 per day

=

Tk.

500.00

  1. Ordinary labour

1.00

no

@

Tk.

320.00 per day

=

Tk.

320.00

  1. Extra labour for chiping RCC surface

0.50

no

@

Tk.

320.00 per day

=

Tk.

160.00

  1. Washing of sand, scaffolding, curing, sundries, local carriage etc.

 

 

LS

=

Tk.

320.00

 

 

 

 

 

Sub - Total

=

Tk.

1,731.88

 

 

 

 

 

Profit 10.00%

=

Tk.

173.19

 

 

 

 

 

Overhead 3.50%

=

Tk.

60.62

 

 

 

 

 

Total

=

Tk.

1,965.69

 

Add VAT with adjustment factor

 

1.06383 6.00%

=

Tk.

125.47

 

 

 

 

 

Grand Total

=

Tk.

2,091.16

 

 

 

 

 

Rate per sft

=

Tk.

20.91

i) For ground floor

 

 

 

 

Rate per sqm

=

Tk.

225.08

Say,

Tk.

225 .00 per sqm

 

 

 

 

 

 

 

 

 

 

Item No.- 15.6

 

 

 

 

 

 

 

 

Min 1/4" thick cement plaster (1:3) to walls

 

 

 

 

 

 

 

 

Considering 100 sft of work

 

 

 

 

 

 

 

 

A. For 1/2" thick cement plaster (1:3) to walls

(a) Sand (F.M. 1.2)

4.7

cft

@

Tk.

1,400.00 per % cft

=

Tk.

65.80

(b) Cement

(c) Labour

  1. Head mason

1.25

0.25

bag
no

@

@

Tk. Tk.

395.00 per bag

600.00 per day

=

=

Tk. Tk.

493.75

150.00

  1. Mason

1.00

no

@

Tk.

500.00 per day

=

Tk.

500.00

  1. Ordinary labour

1.00

no

@

Tk.

320.00 per day

=

Tk.

320.00

(d) Washing of sand, local carriage, scaffolding, curing, & sundries etc.

 

 

LS

=

Tk.

320.00

 

 

 

 

 

Sub - Total

=

Tk.

1,849.55

 

 

 

 

 

Profit 10.00%

=

Tk.

184.96

 

 

 

 

 

Overhead 3.50%

=

Tk.

64.73

 

 

 

 

 

Total

=

Tk.

2,099.24

 

Add VAT with adjustment factor

 

1.06383 6.00%

=

Tk.

133.99

 

 

 

 

 

Grand Total

=

Tk.

2,233.23

B. For 1/4" thick cement plaster (1:3) to walls

(a) Sand (F.M. 1.2)

2.35

cft

@

Tk.

1,400.00 per % cft

=

Tk.

32.90

(b) Cement

(c) Labour

  1. Head mason

0.625

1/4

bag
no

@

@

Tk. Tk.

395.00 per bag

600.00 per day

=

=

Tk. Tk.

246.88

150.00

  1. Mason

1.00

no

@

Tk.

500.00 per day

=

Tk.

500.00

  1. Ordinary labour

1.00

no

@

Tk.

320.00 per day

=

Tk.

320.00

(d) Washing of sand, local carriage, scaffolding, curing, & sundries etc.

 

 

LS

=

Tk.

320.00

 

 

 

 

 

Sub - Total

=

Tk.

1,569.78

 

 

 

 

 

Profit 10.00%

=

Tk.

156.98

 

 

 

 

 

Overhead 3.50%

=

Tk.

54.94

 

 

 

 

 

Total

=

Tk.

1,781.70

 

Add VAT with adjustment factor

 

1.06383 6.00%

=

Tk.

113.73

 

 

 

 

 

Grand Total

=

Tk.

1,895.43

 

 

 

 

 

Average of A & B

=

Tk.

2,064.33

(i) Ground floor

 

 

 

 

Rate per sft

=

Tk.

20.64

 

 

 

 

 

Rate per sqm

=

Tk.

222.17

 

 

 

Say,

Tk.

222 .00 per sqm