Add VAT with adjustment factor

Total

1.0638 6.00%

=

Tk. Tk.

68,042.57

4,343.02

Grand Total Rate per sft Rate per sqm

=

=

=

Tk.
Tk.
Tk.

72,385.59

1,088.51

11,716.72

 

Say,

Tk. 11,717 .00 per sqm

 

 

 

 

 

 

 

Item No.- 20.9.1

 

 

Providing 1.5" x 1.5" x 1/4" M.S. angle to the nosing of steps of stair case: one flight of stair case with 10 steps 3'-6" wide.

 

 

Considering 10 steps

 

 

 

 

 

Total rft of nosing: 10 x 3'-6"= 35 rft

(a) Cost of cutting @ 3 nos of grooves per steps
for fixing 1.5" x 1.5" x 3.5" size clamps

  1. Mason 0.25 No.

@

Tk. 500.00 per day

=

Tk.

125.00

  1. Skilled labour 0.5 No.

(b) Cost of CC (1:2:4) with smaller size of chips for fixing clamps:

@

Tk. 390.00 per day

=

Tk.

195.00

30 x 1.5" x1.5" x3.5"= 0.14 cft

(c) Cost of 1.5" x 1.5" x 1/4" M.S. angle: @ 2.34 Ibs per rft

10 x 3'-6"= 35 rft

@

Tk. 17,763.63 per % cft

=

Tk.

24.87

Add wastage 5%= 1.75 rft

@

Tk. 24.94 per Ib

=

Tk.

2,144.84

= 36.75 rft

= 86.00 Ibs

(d) Cost of 3/4" x 1/8" F.I. bar for clamps: @ 0.32 Ibs per rft

10 x 3 x 3"= 7.5 rft

Add wastage 5%= 0.375 rft

@

@

Tk. 24.94 per Ib

Tk. 8.00 each

=

=

Tk. Tk.

62.85

80.00

= 7.875 rft

= 2.52 Ibs

(e) Cutting charge of M.S. angle as per required measurement

in/c cost of T & P. 10 nos

(f) Cost of welding of 3/4" x 1/8" F.I. bar for fixing one end with angle including

 

 

 

 

bifercating on the other end. 30 nos

(g) Labour charge for fixing up the M.S. angle in the nosing of steps to
keep the angles in level and parallel with each of the steps properly

  1. Mason 0.5 no

@

@

Tk. 8.00 each

Tk. 500.00 per day

=

=

Tk.

Tk.

240.00

250.00

  1. Ordinary labour 0.5 no

@

Tk. 320.00 per day

=

Tk.

160.00

 

 

Sub - Total

=

Tk.

3,282.56

 

 

Profit 10.00%

=

Tk.

328.26

 

 

Overhead 3.50%

=

Tk.

114.89

 

 

Total

=

Tk.

3,725.71

Add VAT with adjustment factor

1.06383 6.00%

=

Tk.

237.81

 

 

Grand Total

=

Tk.

3,963.52

 

 

Rate per rft

=

Tk.

113.24

 

 

Rate per rm

=

Tk.

371.54

 

Say,

Tk. 372 .00 per meter

 

 

 

 

 

 

 

 

 

Item No.- 20.9.2

 

 

 

 

 

Providing 1.25" x 1.25" x 1/4" M.S. angle to the nosing of steps of stair case:

 

 

 

 

 

one flight of stair case with 10 steps 3'-6" wide.

 

 

 

 

 

Considering 10 steps

 

 

 

 

 

Total rft of nosing: 10 x 3'-6"= 35 rft of work

 

 

 

 

 

  1. Cost of nosing work: Same as item No. 20.9.1 except cost of 1.5" x 1.5" x 1/4" size angle

 

 

=

Tk.

1,137.72

  1. Cost of 1.25" x 1.25" x 1/4" angle: @ 1.91 Ibs per rft

1 x 10 x 3' - 6"= 35 rft

 

 

 

 

 

Add wastage 5%= 1.75 rft

@

Tk. 24.94 per Ib

=

Tk.

1,750.54

= 36.75 rft

= 70.19 Ibs

 

 

Sub - Total

=

Tk.

2,888.26

 

 

Profit 10.00%

=

Tk.

288.83