B. Labour cost for fitting and fixing:
C. Scaffolding D. Local Carriage | @ @ | Tk. Tk. | 1,000.00 600.00 | Total per day per day LS LS | = = = = = | Tk. Tk. Tk. Tk. Tk. Tk. | 23,462.44 1,000.00 600.00 50.00 100.00 25,212.44 |
Sub - Total | = | ||||||
|
|
| Profit | 10.00% | = | Tk. | 2,521.24 |
|
|
| Overhead | 3.50% | = | Tk. | 882.44 |
|
|
|
| Total | = | Tk. | 28,616.12 |
Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 1,826.56 | |
|
|
|
| Grand Total | = | Tk. | 30,442.68 |
|
|
|
| Rate per sft | = | Tk. | 1,449.65 |
|
|
|
| Rate per sqm | = | Tk. | 15,604.03 |
| Say, | Tk. | 15,604 | .00 per sqm |
|
|
|
|
|
|
|
|
|
|
|
Item No.- 22.4 |
|
|
|
|
|
|
|
Supplying, fitting-fixing 10 mm thick clear glass partition with aluminium box |
|
|
|
|
|
|
|
Considering : 1X 5'-0"X 7'-0" = 35.00 sft |
|
|
|
|
|
|
|
A. Cost of Materials
|
|
|
|
|
|
|
|
Add 3% wastage= 1.05 sft |
|
|
|
|
|
|
|
36.05 sft | @ | Tk. | 140.00 | per sft | = | Tk. | 5,047.00 |
| @ | Tk. | 79.00 | per rft | = | Tk. | 395.00 |
| @ | Tk. | 19.33 | per rft | = | Tk. | 328.61 |
| @ | Tk. | 26.76 | per rft | = | Tk. | 454.92 |
| @ | Tk. | 2.50 | each | = | Tk. | 20.00 |
| @ | Tk. | 300.00 | each | = | Tk. | 300.00 |
| @ | Tk. | 1.00 | each | = | Tk. | 8.00 |
| @ | Tk. | 5.00 | each | = | Tk. | 30.00 |
|
|
|
| Sub Total | = | Tk. | 6,583.53 |
B Labour cost 3.5 sft | @ | Tk. | 320.00 | per sft | = | Tk. | 1,120.00 |
|
|
|
| Sub - Total | = | Tk. | 7,703.53 |
|
|
| Profit | 10.00% | = | Tk. | 770.35 |
|
|
| Overhead | 3.50% | = | Tk. | 269.62 |
|
|
|
| Total | = | Tk. | 8,743.50 |
Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 558.10 | |
|
|
|
| Grand Total | = | Tk. | 9,301.60 |
|
|
|
| Rate per sft | = | Tk. | 265.76 |
|
|
|
| Rate per sqm | = | Tk. | 2,860.64 |
| Say, | Tk. | 2,861 | .00 per sqm |
|
|
|
|
|
|
|
|
|
|
|
Item No.- 22.5 |
|
|
|
|
|
|
|
Supplying fitting fixing Chittagong teak wood strip 62 mm x 25 mm x 20 mm for fixing curtain rail for doors and windows. |
|
|
|
|
|
|
|
Considering 4 rft of work (a) Chittagong teak wood: |
|
|
|
|
|
|
|
1 x 4'-0" x 2.5" x 1" = 0.069 cft |
|
|
|
|
|
|
|
Add wastage 5%= 0.0035 cft |
|
|
|
|
|
|
|
0.073 cft (b) Labour charge
| @ @ | Tk. Tk. | 4,390.0 600.00 | per rft | = = | Tk. Tk. | 320.47 75.00 |
| @ | Tk. | 390.00 | per day | = | Tk. | 195.00 |
(c) Fitting, fixing, screws and polishing |
|
|
| LS | = | Tk. | 160.00 |
|
|
|
| Sub-Total | = | Tk. | 750.47 |
|
|
| Profit | 10.00% | = | Tk. | 75.05 |
|
|
| Overhead | 3.50% | = | Tk. | 26.27 |
|
|
|
| Total | = | Tk. | 851.79 |
Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 54.37 | |