Prev Next


B. Labour cost for fitting and fixing:

  1. Skilled Technician 1 no
  2. Semi-Skilled Technician 1 no

C. Scaffolding

D. Local Carriage

@

@

Tk. Tk.

1,000.00

600.00

Total

per day per day

LS

LS

=

= = = =

Tk.

Tk. Tk. Tk. Tk. Tk.

23,462.44

1,000.00 600.00 50.00 100.00 25,212.44

Sub - Total

=

 

 

 

Profit

10.00%

=

Tk.

2,521.24

 

 

 

Overhead

3.50%

=

Tk.

882.44

 

 

 

 

Total

=

Tk.

28,616.12

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

1,826.56

 

 

 

 

Grand Total

=

Tk.

30,442.68

 

 

 

 

Rate per sft

=

Tk.

1,449.65

 

 

 

 

Rate per sqm

=

Tk.

15,604.03

 

Say,

Tk.

15,604

.00 per sqm

 

 

 

 

 

 

 

 

 

 

 

Item No.- 22.4

 

 

 

 

 

 

 

Supplying, fitting-fixing 10 mm thick clear glass partition with aluminium box

 

 

 

 

 

 

 

Considering : 1X 5'-0"X 7'-0" = 35.00 sft

 

 

 

 

 

 

 

A. Cost of Materials

  1. Cost of 10 mm thick glass 35.00 sft

 

 

 

 

 

 

 

Add 3% wastage= 1.05 sft

 

 

 

 

 

 

 

36.05 sft

@

Tk.

140.00

per sft

=

Tk.

5,047.00

  1. 44mm x 44mm Aluminium box 5 rft

@

Tk.

79.00

per rft

=

Tk.

395.00

  1. Protector bit (Single) 17.00 rft

@

Tk.

19.33

per rft

=

Tk.

328.61

  1. Protector bit (Double) 17.00 rft

@

Tk.

26.76

per rft

=

Tk.

454.92

  1. SS Screws 8 nos

@

Tk.

2.50

each

=

Tk.

20.00

  1. Silicon (1 piece 300 ml) 1 no

@

Tk.

300.00

each

=

Tk.

300.00

  1. Rowel plug 8 nos

@

Tk.

1.00

each

=

Tk.

8.00

  1. Rivet 6 nos

@

Tk.

5.00

each

=

Tk.

30.00

 

 

 

 

Sub Total

=

Tk.

6,583.53

B Labour cost 3.5 sft

@

Tk.

320.00

per sft
(A)

=

Tk.

1,120.00

 

 

 

 

Sub - Total

=

Tk.

7,703.53

 

 

 

Profit

10.00%

=

Tk.

770.35

 

 

 

Overhead

3.50%

=

Tk.

269.62

 

 

 

 

Total

=

Tk.

8,743.50

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

558.10

 

 

 

 

Grand Total

=

Tk.

9,301.60

 

 

 

 

Rate per sft

=

Tk.

265.76

 

 

 

 

Rate per sqm

=

Tk.

2,860.64

 

Say,

Tk.

2,861

.00 per sqm

 

 

 

 

 

 

 

 

 

 

 

Item No.- 22.5

 

 

 

 

 

 

 

Supplying fitting fixing Chittagong teak wood strip 62 mm x 25 mm x 20 mm for fixing curtain rail for doors and windows.

 

 

 

 

 

 

 

Considering 4 rft of work

(a) Chittagong teak wood:

 

 

 

 

 

 

 

1 x 4'-0" x 2.5" x 1" = 0.069 cft

 

 

 

 

 

 

 

Add wastage 5%= 0.0035 cft

 

 

 

 

 

 

 

0.073 cft

(b) Labour charge

  1. Carpenter 1/8 no

@

@

Tk. Tk.

4,390.0

600.00

per rft
per day

=

=

Tk. Tk.

320.47

75.00

  1. Helper 1/2 no

@

Tk.

390.00

per day

=

Tk.

195.00

(c) Fitting, fixing, screws and polishing

 

 

 

LS

=

Tk.

160.00

 

 

 

 

Sub-Total

=

Tk.

750.47

 

 

 

Profit

10.00%

=

Tk.

75.05

 

 

 

Overhead

3.50%

=

Tk.

26.27

 

 

 

 

Total

=

Tk.

851.79

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

54.37