Grand total
Rate per sft
Rate per sqm

=

=

=

Tk.
Tk.
Tk.

7,863.68

78.64

846.48

Say,

Tk.

846 .00 per sqm

 

 

 

 

 

 

 

 

 

 

 

 

Item No.- 24.12

 

 

 

 

 

 

 

 

 

1.5" compacted bitumenous carpeting (with stone chips)

 

 

 

 

 

 

 

 

 

Considering 100 sft of work

 

 

 

 

 

 

 

 

 

(a)

Cost of materials

 

 

 

 

 

 

 

 

 

  1.  

Stone Chips 20 mm downgraded

4.43

cft

@

Tk.

19,500.00

per % cft

=

Tk.

863.85

  1.  

(LAA<30% Stone Chips 12 mm downgraded

10.63

cft

@

Tk.

16,500.00

per % cft

=

Tk.

1,753.95

  1.  

(LAA<30% Bitumen (60/70)

76.00

lbs

@

Tk.

23.58

per Ib

=

Tk.

1,792.08

  1.  

Stone Dust (2.38 mm down)

2.66

cft

@

Tk.

4,248.00

per % cft

=

Tk.

113.00

  1.  

Fire wood

1.00

mnds

@

Tk.

200.00

per mnds

=

Tk.

200.00

 

 

 

 

 

 

 

Sub-Total (a)

=

Tk.

4,722.88

(b)

Labour charges:

 

 

 

 

 

 

 

 

 

  1.  

Mason

0.026

no

@

Tk.

500.00

per day

=

Tk.

13.00

  1.  

Skilleded labour

0.158

no

@

Tk.

390.00

per day

=

Tk.

61.62

  1.  

Ordinary labour

0.650

no

@

Tk.

320.00

per day

=

Tk.

208.00

  1.  

Sundries and T & P

 

 

 

 

 

LS

=

Tk.

106.67

 

 

 

 

 

 

 

Sub-Total (b)

=

Tk.

389.29

(c)

Equipment Charges:

 

 

 

 

 

 

 

 

 

  1.  

Hire Charge of Vibratory

 

 

 

 

 

 

 

 

 

 

(Ride On) Roller 2 Steel Drum Compactor (3-

0.015

day

@

Tk.

5,000.00

per day

=

Tk.

75.00

  1.  

5 tons)

Hire Charge of Pneumatic

 

 

 

 

 

 

 

 

 

 

Multiple Tired Roller (7 tires, 8-10 tons)

0.015

day

@

Tk.

5,000.00

per day

=

Tk.

75.00

  1.  

Diesel

0.251

litre

@

Tk.

68.00

per litre

=

Tk.

17.07

  1.  

Lubricants

0.025

litre

@

Tk.

220.00

per litre

=

Tk.

5.50

 

 

 

 

 

 

 

Sub-Total (c)

=

Tk.

172.57

 

 

 

 

 

 

Sub-Total (a+b+c)

=

Tk.

5,284.74

 

 

 

 

 

 

Profit

10.00%

=

Tk.

528.47

 

 

 

 

 

 

Overhead

3.50%

=

Tk.

184.97

 

 

 

 

 

 

 

Total

=

Tk.

5,998.18

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

382.86

 

 

 

 

 

 

 

Grand total

=

Tk.

6,381.04

 

 

 

 

 

 

 

Rate per sft

=

Tk.

63.81

 

 

 

 

 

 

 

Rate per sqm

=

Tk.

686.85

 

 

 

 

Say,

Tk.

687 .00 per sqm

 

 

 

 

 

 

 

 

Item No.- 24.13

 

 

 

 

 

 

 

 

 

1" compacted bitumenous carpeting (with stone chips )

 

 

 

 

 

 

 

 

 

Considering 100 sft of work

 

 

 

 

 

 

 

 

 

(a)

Cost of materials

 

 

 

 

 

 

 

 

 

  1.  

Stone Chips 12 mm downgraded

9.97

cft

@

Tk.

16,500.00

per % cft

=

Tk.

1,645.05

  1.  

(LAA<30% Bitumin 60/70

48.00

lbs

@

Tk.

23.58

per Ib

=

Tk.

1,131.84

  1.  

Stone Dust (2.38 mm down)

1.11

cft

@

Tk.

4,248.00

per % cft

=

Tk.

47.15

  1.  

Firewood

0.60

Mnds

@

Tk.

200.00

per mnd

=

Tk.

120.00

 

 

 

 

 

 

 

Sub-Total (a)

=

Tk.

2,944.04

(b)

Labour charges:

 

 

 

 

 

 

 

 

 

  1.  

Mason

0.02

no

@

Tk.

500.00

per day

=

Tk.

10.00

  1.  

Skilled labour

0.11

no

@

Tk.

390.00

per day

=

Tk.

42.90

  1.  

Ordinary labour

0.45

no

@

Tk.

320.00

per day

=

Tk.

144.00

  1.  

Sundries and T & P

 

 

 

 

 

LS

=

Tk.

106.67

 

 

 

 

 

 

 

Sub-Total (b)

=

Tk.

303.57

(c)

Equipment Charges:

 

 

 

 

 

 

 

 

 

  1.  

Hire Charge of Vibratory (Ride On)

 

 

 

 

 

 

 

 

 

 

Roller 2 Steel Drum Compactor (3-5 tons)

0.01

day

@

Tk.

5,000.00

per day

=

Tk.

50.00

  1.  

Hire Charge of Pneumatic

 

 

 

 

 

 

 

 

 

 

Multiple Tired Roller (7 tires, 8-10 tons)

0.01

day

@

Tk.

5,000.00

per day

=

Tk.

50.00