Cement 0.1 bag

Sand (F.M. 1.2) 0.5 cft

Labour:

Plumber 0.25 no

Skilled labour 0.5 no

Ordinary labour 0.5 no

@

@

@

@

@

Tk. 395.00

Tk. 1,400.00

Tk. 600.00

Tk. 390.00

Tk. 320.00

Profit
Overhead

per bag
per % cft

each
each
each

=

=

=

=

=

Tk. Tk.

Tk. Tk. Tk.

39.50

7.00

150.00

195.00

160.00

Sub - Total

10.00%

3.50%

=

=

=

Tk.
Tk.
Tk.

1,704.50

170.45

59.66

Total

=

Tk.

1,934.61

 

Add VAT with adjustment factor

1.06383

6.00%

=

Tk.

123.49

 

 

 

 

Grand Total

=

Tk.

2,058.10

 

 

 

 

Rate per No.

=

Tk.

2,058.10

 

 

Say,

Tk. 2,058 .00 each

 

 

 

26.5.1.3

Special coloured long pan with foot-rest 530x430x210 mm 12.5

kg or equivalent

 

 

 

 

 

Considering 1 No. of fixture

 

 

 

 

1.

Special coloured long pan: 1 no

@

Tk. 1,330.00

each

=

Tk.

1,330.00

2.

Fitting fixing materials:

 

 

 

 

 

 

(a)

Cement mortar (1:4)

 

 

 

 

 

 

  1.  

Cement 0.1 bag

@

Tk. 395.00

per bag

=

Tk.

39.50

  1.  

Sand (F.M. 1.2) 0.5 cft

@

Tk. 1,400.00

per % cft

=

Tk.

7.00

3.

Labour:

 

 

 

 

 

 

  1.  

Plumber 0.25 no

@

Tk. 600.00

each

=

Tk.

150.00

  1.  

Skilled labour 0.5 no

@

Tk. 390.00

each

=

Tk.

195.00

  1.  

Ordinary labour 0.5 no

@

Tk. 320.00

each

=

Tk.

160.00

 

 

 

 

Sub - Total

=

Tk.

1,881.50

 

 

 

Profit

10.00%

=

Tk.

188.15

 

 

 

Overhead

3.50%

=

Tk.

65.85

 

 

 

 

Total

=

Tk.

2,135.50

 

Add VAT with adjustment factor

1.06383

6.00%

=

Tk.

136.31

 

 

 

 

Grand Total

=

Tk.

2,271.81

 

 

 

 

Rate per No.

=

Tk.

2,271.81

26.5.2.1

White colour approx.530x450x290 mm 14.5 kg

Say,

Tk. 2,272 .00 each

 

 

 

 

 

 

 

 

Considering 1 No. of fixture

 

 

 

 

 

 

1.

White long pan: 1 no

@

Tk. 1,315.00

each

=

Tk.

1,315.00

2.

Fitting fixing materials:

 

 

 

 

 

 

(a)

Cement mortar (1:4)

 

 

 

 

 

 

  1.  

Cement 0.1 bag

@

Tk. 395.00

per bag

=

Tk.

39.50

  1.  

Sand (F.M. 1.2) 0.5 cft

@

Tk. 1,400.00

per % cft

=

Tk.

7.00

3.

Labour:

 

 

 

 

 

 

  1.  

Plumber 0.25 no

@

Tk. 600.00

each

=

Tk.

150.00

  1.  

Skilled labour 0.5 no

@

Tk. 390.00

each

=

Tk.

195.00

  1.  

Ordinary labour 0.5 no

@

Tk. 320.00

each

=

Tk.

160.00

 

 

 

 

Sub - Total

=

Tk.

1,866.50

 

 

 

Profit

10.00%

=

Tk.

186.65

 

 

 

Overhead

3.50%

=

Tk.

65.33

 

 

 

 

Total

=

Tk.

2,118.48

 

Add VAT with adjustment factor

1.06383

6.00%

=

Tk.

135.22

 

 

 

 

Grand Total

=

Tk.

2,253.70

 

 

 

 

Rate per No.

=

Tk.

2,253.70

26.5.2.2

Coloured 530x450x290 mm 14.5 kg

Say,

Tk. 2,254 .00 each

 

 

 

 

 

 

 

 

Considering 1 No. of fixture

 

 

 

 

 

 

  1.  

Coloured long pan: 1 no

@

Tk. 1,643.00

each

=

Tk.

1,643.00

  1.  

Fitting fixing materials:

 

 

 

 

 

 

(a)

Cement mortar (1:4)