(ii) (b)

4.

  1.  
  2.  
  3.  

Sand (F.M. 1.2) 0.05 cft

CI brakets 1 pair
Labour:

Plumber 0.15 no

Skilled labour 0.2 no

Ordinary labour 0.4 no

@

@

@

@

@

Tk. Tk.

Tk. Tk. Tk.

1,400.00

115.00

600.00

390.00

320.00

Profit
Overhead

per % cft
per pair

each
each
each

=

=

=

=

=

Tk. Tk.

Tk. Tk. Tk.

0.70

115.00

90.00

78.00

128.00

Sub - Total

10.00%

3.50%

=

=

=

Tk.
Tk.
Tk.

2,127.65

212.77

74.47

Total

=

Tk.

2,414.89

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

154.14

 

 

 

 

 

Grand Total

=

Tk.

2,569.03

 

 

 

 

 

Rate per No.

=

Tk.

2,569.03

 

 

Say,

Tk.

2,569 .00 each

 

 

 

 

 

 

 

 

 

 

 

 

Item No.- 26.10

 

 

 

 

 

 

 

26.10.1

Size 660 x 545 x 850 mm, 29kg or equivalent

 

 

 

 

 

 

 

26.10.1.1

Light colour (Ivory/ Alpine White/ Grey/ Pink/ Blue/ Aqua Verde)

 

 

 

 

 

 

 

 

Considering 1 No. of fixture

 

 

 

 

 

 

 

1.

Coloured wash-basin 1 no

@

Tk.

3,295.00

each

=

Tk.

3,295.00

2.

Accessories:

 

 

 

 

 

 

 

  1.  

32 mm dia PVC waste pipe 1 no

@

Tk.

150.00

each

=

Tk.

150.00

  1.  

Grating with brass coupling 1 no

@

Tk.

300.00

each

=

Tk.

300.00

  1.  

CP chain with rubber plug 1 no

@

Tk.

80.00

each

=

Tk.

80.00

3.

Fitting fixing materials:

 

 

 

 

 

 

 

(a)

Cement mortar (1:4)

 

 

 

 

 

 

 

  1.  

Cement 0.01 bag

@

Tk.

395.00

per bag

=

Tk.

3.95

  1.  

Sand (F.M. 1.2) 0.05 cft

@

Tk.

1,400.00

per % cft

=

Tk.

0.70

(b)

CI brakets 1 pair

@

Tk.

115.00

per pair

=

Tk.

115.00

4.

Labour:

 

 

 

 

 

 

 

  1.  

Plumber 0.15 no

@

Tk.

600.00

each

=

Tk.

90.00

  1.  

Skilled labour 0.2 no

@

Tk.

390.00

each

=

Tk.

78.00

  1.  

Ordinary labour 0.4 no

@

Tk.

320.00

each

=

Tk.

128.00

 

 

 

 

 

Sub - Total

=

Tk.

4,240.65

 

 

 

 

Profit

10.00%

=

Tk.

424.07

 

 

 

 

Overhead

3.50%

=

Tk.

148.42

 

 

 

 

 

Total

=

Tk.

4,813.14

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

307.22

 

 

 

 

 

Grand Total

=

Tk.

5,120.36

 

 

 

 

 

Rate per No.

=

Tk.

5,120.36

 

 

Say,

Tk.

5,120 .00 each

 

 

 

26.10.1.2

Coloured (Marble Shade)

 

 

 

 

 

 

 

 

Considering 1 No. of fixture

 

 

 

 

 

 

 

1.

Special coloured wash-basin 1 no

@

Tk.

4,280.00

each

=

Tk.

4,280.00

2.

Accessories:

 

 

 

 

 

 

 

  1.  

32 mm dia PVC waste pipe 1 no

@

Tk.

150.00

each

=

Tk.

150.00

  1.  

Grating with brass coupling 1 no

@

Tk.

300.00

each

=

Tk.

300.00

  1.  

CP chain with rubber plug 1 no

@

Tk.

80.00

each

=

Tk.

80.00

3.

Fitting fixing materials:

 

 

 

 

 

 

 

(a)

Cement mortar (1:4)

 

 

 

 

 

 

 

  1.  

Cement 0.01 bag

@

Tk.

395.00

per bag

=

Tk.

3.95

  1.  

Sand (F.M. 1.2) 0.05 cft

@

Tk.

1,400.00

per % cft

=

Tk.

0.70

(b)

CI brakets 1 pair

@

Tk.

115.00

per pair

=

Tk.

115.00

4.

Labour:

 

 

 

 

 

 

 

  1.  

Plumber 0.15 no

@

Tk.

600.00

each

=

Tk.

90.00

  1.  

Skilled labour 0.2 no

@

Tk.

390.00

each

=

Tk.

78.00

  1.  

Ordinary labour 0.4 no

@

Tk.

320.00

each

=

Tk.

128.00

 

 

 

 

 

Sub - Total

=

Tk.

5,225.65

 

 

 

 

Profit

10.00%

=

Tk.

522.57

 

 

 

 

Overhead

3.50%

=

Tk.

182.90