Prev Next


26.9.9

26.9.9.1

Corner Basin 440x360x195 mm, 7.0kg by weight

Light colour (Ivory, Alpine White, Grey, Pink, Blue, Aqua Verde) Considering 1 No. of fixture

 

 

 

 

 

 

 

 

 

1.

Coloured wash-basin

1

no

@

Tk.

 

788.00

each

=

Tk.

788.00

2.

Accessories:

 

 

 

 

 

 

 

 

 

 

  1.  

32 mm dia PVC waste pipe

1

no

@

Tk.

 

150.00

each

=

Tk.

150.00

  1.  

Grating with brass coupling

1

no

@

Tk.

 

300.00

each

=

Tk.

300.00

  1.  

CP chain with rubber plug

1

no

@

Tk.

 

80.00

each

=

Tk.

80.00

3.

Fitting fixing materials:

 

 

 

 

 

 

 

 

 

 

(a)

Cement mortar (1:4)

 

 

 

 

 

 

 

 

 

 

  1.  

Cement

0.01

bag

@

Tk.

 

395.00

per bag

=

Tk.

3.95

  1.  

Sand (F.M. 1.2)

0.05

cft

@

Tk.

 

1,400.00

per % cft

=

Tk.

0.70

(b)

CI brakets

1

pair

@

Tk.

 

115.00

per pair

=

Tk.

115.00

4.

Labour:

 

 

 

 

 

 

 

 

 

 

  1.  

Plumber

0.15

no

@

Tk.

 

600.00

each

=

Tk.

90.00

  1.  

Skilled labour

0.2

no

@

Tk.

 

390.00

each

=

Tk.

78.00

  1.  

Ordinary labour

0.4

no

@

Tk.

 

320.00

each

=

Tk.

128.00

 

 

 

 

 

 

 

 

Sub - Total

=

Tk.

1,733.65

 

 

 

 

 

 

Profit

10.00%

=

Tk.

173.37

 

 

 

 

 

 

Overhead

3.50%

=

Tk.

60.68

 

 

 

 

 

 

 

 

Total

=

Tk.

1,967.70

 

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

125.60

 

 

 

 

 

 

 

 

Grand Total

=

Tk.

2,093.30

 

 

 

 

 

 

 

 

Rate per No.

=

Tk.

2,093.30

 

 

 

 

Say,

Tk.

 

2,093 .00 each

 

 

 

26.9.9.2

Coloured ( Marble Shade)

 

 

 

 

 

 

 

 

 

 

 

Considering 1 No. of fixture

 

 

 

 

 

 

 

 

 

 

1.

Coloured wash-basin

1

no

@

Tk.

 

1,024.40

each

=

Tk.

1,024.40

2.

Accessories:

 

 

 

 

 

 

 

 

 

 

  1.  

32 mm dia PVC waste pipe

1

no

@

Tk.

 

150.00

each

=

Tk.

150.00

  1.  

Grating with brass coupling

1

no

@

Tk.

 

300.00

each

=

Tk.

300.00

  1.  

CP chain with rubber plug

1

no

@

Tk.

 

80.00

each

=

Tk.

80.00

3.

Fitting fixing materials:

 

 

 

 

 

 

 

 

 

 

(a)

Cement mortar (1:4)

 

 

 

 

 

 

 

 

 

 

  1.  

Cement

0.01

bag

@

Tk.

 

395.00

per bag

=

Tk.

3.95

  1.  

Sand (F.M. 1.2)

0.05

cft

@

Tk.

 

1,400.00

per % cft

=

Tk.

0.70

(b)

CI brakets

1

pair

@

Tk.

 

115.00

per pair

=

Tk.

115.00

4.

Labour:

 

 

 

 

 

 

 

 

 

 

  1.  

Plumber

0.15

no

@

Tk.

 

600.00

each

=

Tk.

90.00

  1.  

Skilled labour

0.2

no

@

Tk.

 

390.00

each

=

Tk.

78.00

  1.  

Ordinary labour

0.4

no

@

Tk.

 

320.00

each

=

Tk.

128.00

 

 

 

 

 

 

 

 

Sub - Total

=

Tk.

1,970.05

 

 

 

 

 

 

Profit

10.00%

=

Tk.

197.01

 

 

 

 

 

 

Overhead

3.50%

=

Tk.

68.95

 

 

 

 

 

 

 

 

Total

=

Tk.

2,236.01

 

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

142.72

 

 

 

 

 

 

 

 

Grand Total

=

Tk.

2,378.73

 

 

 

 

 

 

 

 

Rate per No.

=

Tk.

2,378.73

 

 

 

 

Say,

Tk.

 

2,379 .00 each

 

 

 

26.9.9.3

Special coloured ( Deep Blue, Ruby, Rain Forest, Green), Considering 1 No. of fixture

 

 

 

 

 

 

 

 

 

 

1.

Coloured wash-basin

1

no

@

Tk.

 

1,182.00

each

=

Tk.

1,182.00

2.

Accessories:

 

 

 

 

 

 

 

 

 

 

  1.  

32 mm dia PVC waste pipe

1

no

@

Tk.

 

150.00

each

=

Tk.

150.00

  1.  

Grating with brass coupling

1

no

@

Tk.

 

300.00

each

=

Tk.

300.00

  1.  

CP chain with rubber plug

1

no

@

Tk.

 

80.00

each

=

Tk.

80.00

3.

Fitting fixing materials:

 

 

 

 

 

 

 

 

 

 

(a)

Cement mortar (1:4)

 

 

 

 

 

 

 

 

 

 

(i)

Cement

0.01

bag

@

Tk.

 

395.00

per bag

=

Tk.

3.95