Labour:

Plumber 0.15 no @ Tk. 600.00

Skilled labour 0.2 no @ Tk. 390.00

Ordinary labour 0.4 no @ Tk. 320.00

Profit Overhead

each
each
each

=

=

=

Tk.
Tk.
Tk.

90.00

78.00

128.00

Sub - Total

10.00%

3.50%

=

=

=

Tk.
Tk.
Tk.

3,277.00

327.70

114.70

Total

=

Tk.

3,719.40

 

Add VAT with adjustment factor 1.06383

6.00%

=

Tk.

237.41

 

 

Grand Total

=

Tk.

3,956.81

 

 

Rate per No.

=

Tk.

3,956.81

 

Say, Tk. 3,957 .00 each

 

 

 

 

 

 

 

 

 

Item No.- 26.14

 

 

 

 

Supplying, fitting and fixing glazed vitreous china flat or squatting urinal 510x380x85 mm in size, 9.5 kg

 

 

 

 

26.14.1

White flat/squatting urinal (Bangladeshi), size 510 x 380 x 85 mm, wt. 9.5 kgor equivalent

 

 

 

 

 

Considering 1 No. of fixture

 

 

 

 

1.

White flat/squatting urinal 1 no @ Tk. 950.00

each

=

Tk.

950.00

2.

Fitting fixing materials:

 

 

 

 

(a)

Cement mortar (1:4)

 

 

 

 

  1.  

Cement 0.2 bag @ Tk. 395.00

per bag

=

Tk.

79.00

  1.  

Sand (F.M. 1.2) 0.1 cft @ Tk. 1,400.00

per % cft

=

Tk.

1.40

3.

Labour:

 

 

 

 

  1.  

Plumber 0.2 no @ Tk. 600.00

each

=

Tk.

120.00

  1.  

Skilled labour 0.25 no @ Tk. 390.00

each

=

Tk.

97.50

  1.  

Ordinary labour 0.5 no @ Tk. 320.00

each

=

Tk.

160.00

 

 

Sub - Total

=

Tk.

1,407.90

 

Profit

10.00%

=

Tk.

140.79

 

Overhead

3.50%

=

Tk.

49.28

 

 

Total

=

Tk.

1,597.97

 

Add VAT with adjustment factor 1.06383

6.00%

=

Tk.

102.00

 

 

Grand Total

=

Tk.

1,699.97

 

 

Rate per No.

=

Tk.

1,699.97

 

Say, Tk. 1,700 .00 each

 

 

 

26.14.2

Coloured flat/squatting urinal (Bangladeshi), size 510 x 380 x 85 mm, wt. 9.5 kg or equivalent

 

 

 

 

 

Considering 1 No. of fixture

 

 

 

 

1.

Coloured flat/squatting urinal 1 no @ Tk. 1,000.00

each

=

Tk.

1,000.00

2.

Fitting fixing materials:

 

 

 

 

(a)

Cement mortar (1:4)

 

 

 

 

  1.  

Cement 0.2 bag @ Tk. 395.00

per bag

=

Tk.

79.00

  1.  

Sand (F.M. 1.2) 0.1 cft @ Tk. 1,400.00

per % cft

=

Tk.

1.40

3.

Labour:

 

 

 

 

  1.  

Plumber 0.2 no @ Tk. 600.00

each

=

Tk.

120.00

  1.  

Skilled labour 0.25 no @ Tk. 390.00

each

=

Tk.

97.50

  1.  

Ordinary labour 0.5 no @ Tk. 320.00

each

=

Tk.

160.00

 

 

Sub - Total

=

Tk.

1,457.90

 

Profit

10.00%

=

Tk.

145.79

 

Overhead

3.50%

=

Tk.

51.03

 

 

Total

=

Tk.

1,654.72

 

Add VAT with adjustment factor 1.06383

6.00%

=

Tk.

105.62

 

 

Grand Total

=

Tk.

1,760.34

 

 

Rate per No.

=

Tk.

1,760.34

 

Say, Tk. 1,760 .00 each

 

 

 

26.14.3

Special coloured flat/squatting urinal (Bangladeshi), size 510 x 380 x 85 mm, wt. 9.5 kg

 

 

 

 

 

Considering 1 No. of fixture

 

 

 

 

1.

Special Coloured flat/squatting urinal 1 no @ Tk. 1,100.00

each

=

Tk.

1,100.00