Prev Next


 

Add VAT with adjustment

factor

 

Profit
Overhead

1.06383

10.00%

3.50%

=

=

Tk. Tk.

244.20

85.47

Total

6.00%

=

=

Tk. Tk.

2,771.67

176.92

Grand Total Rate per No.

=

=

Tk. Tk.

2,948.59

2,948.59

26.13.2

Approx 445x355x330 mm, 10kg (partition Type)

 

Say,

Tk.

2,949 .00 each

 

 

 

 

 

 

 

 

26.13.2.1

Light colour

 

 

 

 

 

 

 

 

 

Considering 1 No. of fixture

 

 

 

 

 

 

 

 

(a)

White bowl urinal 1

no

@

Tk.

1,650.00

each

=

Tk.

1,650.00

(b)

Accessories:

 

 

 

 

 

 

 

 

  1.  

Grating with brass coupling 1

no

@

Tk.

300.00

each

=

Tk.

300.00

  1.  

32 mm dia PVC waste pipe 1

no

@

Tk.

150.00

each

=

Tk.

150.00

(c)

Fitting fixing materials:

 

 

 

 

 

 

 

 

(i)

75 mm rowel plug 2

nos

@

Tk.

13.00

each

=

Tk.

26.00

(d)

Labour:

 

 

 

 

 

 

 

 

  1.  

Plumber 0.15

no

@

Tk.

600.00

each

=

Tk.

90.00

  1.  

Skilled labour 0.2

no

@

Tk.

390.00

each

=

Tk.

78.00

  1.  

Ordinary labour 0.4

no

@

Tk.

320.00

each

=

Tk.

128.00

 

 

 

 

 

 

Sub - Total

=

Tk.

2,422.00

 

 

 

 

 

Profit

10.00%

=

Tk.

242.20

 

 

 

 

 

Overhead

3.50%

=

Tk.

84.77

 

 

 

 

 

 

Total

=

Tk.

2,748.97

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

175.47

 

 

 

 

 

 

Grand Total

=

Tk.

2,924.44

 

 

 

 

 

 

Rate per No.

=

Tk.

2,924.44

26.13.2.2

Coloured (Marble shaded)

 

Say,

Tk.

2,924 .00 each

 

 

 

 

 

 

 

 

 

Considering 1 No. of fixture

 

 

 

 

 

 

 

 

(a)

Coloured bowl urinal 1

no

@

Tk.

2,171.00

each

=

Tk.

2,171.00

(b)

Accessories:

 

 

 

 

 

 

 

 

  1.  

Grating with brass coupling 1

no

@

Tk.

300.00

each

=

Tk.

300.00

  1.  

32 mm dia PVC waste pipe 1

no

@

Tk.

150.00

each

=

Tk.

150.00

(c)

Fitting fixing materials:

 

 

 

 

 

 

 

 

(i)

75 mm rowel plug 2

nos

@

Tk.

13.00

each

=

Tk.

26.00

(d)

Labour:

 

 

 

 

 

 

 

 

  1.  

Plumber 0.15

no

@

Tk.

600.00

each

=

Tk.

90.00

  1.  

Skilled labour 0.2

no

@

Tk.

390.00

each

=

Tk.

78.00

  1.  

Ordinary labour 0.4

no

@

Tk.

320.00

each

=

Tk.

128.00

 

 

 

 

 

 

Sub - Total

=

Tk.

2,943.00

 

 

 

 

 

Profit

10.00%

=

Tk.

294.30

 

 

 

 

 

Overhead

3.50%

=

Tk.

103.01

 

 

 

 

 

 

Total

=

Tk.

3,340.31

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

213.21

 

 

 

 

 

 

Grand Total

=

Tk.

3,553.52

 

 

 

 

 

 

Rate per No.

=

Tk.

3,553.52

26.13.2.3

Special coloured (Deep Colour)

 

Say,

Tk.

3,554 .00 each

 

 

 

 

 

 

 

 

 

Considering 1 No. of fixture

 

 

 

 

 

 

 

 

(a)

Special coloured bowl rinal 1

no

@

Tk.

2,505.00

each

=

Tk.

2,505.00

(b)

Accessories:

 

 

 

 

 

 

 

 

  1.  

Grating with brass coupling 1

no

@

Tk.

300.00

each

=

Tk.

300.00

  1.  

32 mm dia PVC waste pipe 1

no

@

Tk.

150.00

each

=

Tk.

150.00

(c)

Fitting fixing materials:

 

 

 

 

 

 

 

 

(i)

75 mm rowel plug 2

nos

@

Tk.

13.00

each

=

Tk.

26.00