26.51.3

100 mm dia plastic "Y" or "T-Y" cleanout Considering 1 No. of fixture

 

 

 

 

 

 

 

 

 

 

  1.  

100 mm dia plastic

 

 

 

 

 

 

 

 

 

 

Y or "T-Y" cleanout

1

no

@

Tk.

430.00

each

=

Tk.

430.00

  1.  

Jointing Materials

 

 

 

 

 

 

 

 

 

(i)

Solvent cement

27

ml

@

Tk.

0.70

per ml

=

Tk.

18.90

  1.  

Labour:

 

 

 

 

 

 

 

 

 

  1.  

Plumber

0.045

no

@

Tk.

600.00

each

=

Tk.

27.00

  1.  

Skilled labour

0.09

no

@

Tk.

390.00

each

=

Tk.

35.10

  1.  

Ordinary labour

0.161

no

@

Tk.

320.00

each

=

Tk.

51.52

 

 

 

 

 

 

 

Sub - Total

=

Tk.

562.52

 

 

 

 

 

 

Profit

10.00%

=

Tk.

56.25

 

 

 

 

 

 

Overhead

3.50%

=

Tk.

19.69

 

 

 

 

 

 

 

Total

=

Tk.

638.46

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

40.75

 

 

 

 

 

 

 

Grand Total

=

Tk.

679.21

 

 

 

 

 

 

 

Rate per No.

=

Tk.

679.21

26.51.4

50 mm dia plastic "P" or "S" trap

 

 

Say,

Tk.

679 .00 each

 

 

 

 

 

 

 

 

 

Considering 1 No. of fixture

 

 

 

 

 

 

 

 

 

  1.  

50 mm dia plastic trap

1

no

@

Tk.

350.00

each

=

Tk.

350.00

  1.  

Jointing materials

 

 

 

 

 

 

 

 

 

(i)

Solvent cement

10

ml

@

Tk.

0.70

per ml

=

Tk.

7.00

  1.  

Labour:

 

 

 

 

 

 

 

 

 

  1.  

Plumber

0.025

no

@

Tk.

600.00

each

=

Tk.

15.00

  1.  

Skilled labour

0.05

no

@

Tk.

390.00

each

=

Tk.

19.50

  1.  

Ordinary labour

0.095

no

@

Tk.

320.00

each

=

Tk.

30.40

 

 

 

 

 

 

 

Sub - Total

=

Tk.

421.90

 

 

 

 

 

 

Profit

10.00%

=

Tk.

42.19

 

 

 

 

 

 

Overhead

3.50%

=

Tk.

14.77

 

 

 

 

 

 

 

Total

=

Tk.

478.86

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

30.57

 

 

 

 

 

 

 

Grand Total

=

Tk.

509.43

 

 

 

 

 

 

 

Rate per No.

=

Tk.

509.43

 

 

 

 

Say,

Tk.

509 .00 each

 

 

 

 

 

 

 

 

Item No.- 26.52

 

 

 

 

 

 

 

 

 

Supplying, fitting fixing Faucets of following type:

 

 

 

 

 

 

 

 

 

26.52.1

12 mm CP bib cock

 

 

 

 

 

 

 

 

 

 

Considering 1 No. of fixture

 

 

 

 

 

 

 

 

 

  1.  

12 mm CP bib cock

1

no

@

Tk.

770.00

each

=

Tk.

770.00

  1.  

Fitting-fixing materials

 

 

 

 

 

 

 

 

 

(i)

Teflon tape

0.3

pcs

@

Tk.

16.00

per pcs

=

Tk.

4.80

  1.  

Labour:

 

 

 

 

 

 

 

 

 

  1.  

Plumber

0.025

no

@

Tk.

600.00

each

=

Tk.

15.00

  1.  

Skilled labour

0.05

no

@

Tk.

390.00

each

=

Tk.

19.50

  1.  

Ordinary labour

0.095

no

@

Tk.

320.00

each

=

Tk.

30.40

 

 

 

 

 

 

 

Sub - Total

=

Tk.

839.70

 

 

 

 

 

 

Profit

10.00%

=

Tk.

83.97

 

 

 

 

 

 

Overhead

3.50%

=

Tk.

29.39

 

 

 

 

 

 

 

Total

=

Tk.

953.06

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

60.83

 

 

 

 

 

 

 

Grand Total

=

Tk.

1,013.89

 

 

 

 

 

 

 

Rate per No.

=

Tk.

1,013.89

26.52.2

12 mm special quality CP bib cock

 

 

Say,

Tk.

1,014 .00 each

 

 

 

 

 

 

 

 

 

Considering 1 No. of fixture

 

 

 

 

 

 

 

 

 

(a)

12 mm special quality CP bib cock

1

no

@

Tk.

845.00

each

=

Tk.

845.00