Prev Next
īģŋ

  1.  

Fitting-fixing materials

 

 

 

 

 

 

 

 

 

(i)

Teflon tape

0.3

pcs

@

Tk.

16.00

per pcs

=

Tk.

4.80

  1.  

Labour:

 

 

 

 

 

 

 

 

 

  1.  

Plumber

0.025

no

@

Tk.

600.00

each

=

Tk.

15.00

  1.  

Skilled labour

0.05

no

@

Tk.

390.00

each

=

Tk.

19.50

  1.  

Ordinary labour

0.095

no

@

Tk.

320.00

each

=

Tk.

30.40

 

 

 

 

 

 

 

Sub - Total

=

Tk.

914.70

 

 

 

 

 

 

Profit

10.00%

=

Tk.

91.47

 

 

 

 

 

 

Overhead

3.50%

=

Tk.

32.01

 

 

 

 

 

 

 

Total

=

Tk.

1,038.18

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

66.27

 

 

 

 

 

 

 

Grand Total

=

Tk.

1,104.45

 

 

 

 

 

 

 

Rate per No.

=

Tk.

1,104.45

26.52.3

12 mm plastic bib cock with internal thread

 

 

Say,

Tk.

1,104 .00 each

 

 

 

 

 

 

 

 

 

Considering 1 No. of fixture

 

 

 

 

 

 

 

 

 

  1.  

12 mm plastic bib cock

 

 

 

 

 

 

 

 

 

 

with internal thread

1

no

@

Tk.

150.00

each

=

Tk.

150.00

  1.  

Fitting-fixing materials

 

 

 

 

 

 

 

 

 

(i)

Teflon tape

0.3

pcs

@

Tk.

16.00

per pcs

=

Tk.

4.80

  1.  

Labour:

 

 

 

 

 

 

 

 

 

  1.  

Plumber

0.0125

no

@

Tk.

600.00

each

=

Tk.

7.50

  1.  

Skilled labour

0.025

no

@

Tk.

390.00

each

=

Tk.

9.75

  1.  

Ordinary labour

0.048

no

@

Tk.

320.00

each

=

Tk.

15.36

 

 

 

 

 

 

 

Sub - Total

=

Tk.

187.41

 

 

 

 

 

 

Profit

10.00%

=

Tk.

18.74

 

 

 

 

 

 

Overhead

3.50%

=

Tk.

6.56

 

 

 

 

 

 

 

Total

=

Tk.

212.71

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

13.58

 

 

 

 

 

 

 

Grand Total

=

Tk.

226.29

 

 

 

 

 

 

 

Rate per No.

=

Tk.

226.29

Item No.- 26.53

 

 

Say,

Tk.

226 .00 each

 

 

 

 

 

 

 

 

26.53.1

12 mm CP medium quality pillar cock

 

 

 

 

 

 

 

 

 

 

Considering 1 No. of fixture

 

 

 

 

 

 

 

 

 

  1.  

12 mm CP medium

 

 

 

 

 

 

 

 

 

 

quality pillar cock

1

no

@

Tk.

950.00

each

=

Tk.

950.00

  1.  

Fitting-fixing materials

 

 

 

 

 

 

 

 

 

(i)

Teflon tape

0.3

pcs

@

Tk.

16.00

per pcs

=

Tk.

4.80

  1.  

Labour:

 

 

 

 

 

 

 

 

 

  1.  

Plumber

0.025

no

@

Tk.

600.00

each

=

Tk.

15.00

  1.  

Skilled labour

0.05

no

@

Tk.

390.00

each

=

Tk.

19.50

  1.  

Ordinary labour

0.095

no

@

Tk.

320.00

each

=

Tk.

30.40

 

 

 

 

 

 

 

Sub - Total

=

Tk.

1,019.70

 

 

 

 

 

 

Profit

10.00%

=

Tk.

101.97

 

 

 

 

 

 

Overhead

3.50%

=

Tk.

35.69

 

 

 

 

 

 

 

Total

=

Tk.

1,157.36

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

73.87

 

 

 

 

 

 

 

Grand Total

=

Tk.

1,231.23

 

 

 

 

 

 

 

Rate per No.

=

Tk.

1,231.23

26.53.2

12 mm CP special heavy duty pillar cock

 

 

Say,

Tk.

1,231 .00 each

 

 

 

 

 

 

 

 

 

Considering 1 No. of fixture

 

 

 

 

 

 

 

 

 

  1.  

12 mm CP heavy duty pillar cock

1

no

@

Tk.

990.00

each

=

Tk.

990.00

  1.  

Fitting-fixing materials

 

 

 

 

 

 

 

 

 

(i)

Teflon tape

0.3

pcs

@

Tk.

16.00

per pcs

=

Tk.

4.80

  1.  

Labour:

 

 

 

 

 

 

 

 

 

(i)

Plumber

0.025

no

@

Tk.

600.00

each

=

Tk.

15.00