Skilled labour 0.05 no Ordinary labour 0.095 no Add VAT with adjustment | @ @ factor | Tk. Tk. | 390.00 320.00 Profit 1.06383 | each | = = | Tk. Tk. | 19.50 30.40 | |||
Sub - Total 10.00% 3.50% | = = = | Tk. | 1,059.70 105.97 37.09 | |||||||
Total 6.00% | = = | Tk. Tk. | 1,202.76 76.77 | |||||||
Grand Total Rate per No. | = = | Tk. Tk. | 1,279.53 1,279.53 | |||||||
|
|
|
| Say, | Tk. | 1,280 .00 each |
|
|
| |
|
|
|
|
| ||||||
Item No.- 26.54 |
|
|
|
|
|
|
|
|
| |
26.54.1 | CP self closing pillar cock [ Without Mixture ] |
|
|
|
|
|
|
|
|
|
| Considering 1 No. of fixture |
|
|
|
|
|
|
|
|
|
CP self closing pillar cock | 1 | no | @ | Tk. | 4,500.00 | each | = | Tk. | 4,500.00 | |
Fitting-fixing materials |
|
|
|
|
|
|
|
|
| |
(i) | Teflon tape | 0.3 | pcs | @ | Tk. | 16.00 | per pcs | = | Tk. | 4.80 |
Labour: |
|
|
|
|
|
|
|
|
| |
Plumber | 0.03 | no | @ | Tk. | 600.00 | each | = | Tk. | 18.00 | |
Skilled labour | 0.07 | no | @ | Tk. | 390.00 | each | = | Tk. | 27.30 | |
Ordinary labour | 0.162 | no | @ | Tk. | 320.00 | each | = | Tk. | 51.84 | |
|
|
|
|
|
|
| Sub - Total | = | Tk. | 4,601.94 |
|
|
|
|
|
| Profit | 10.00% | = | Tk. | 460.19 |
|
|
|
|
|
| Overhead | 3.50% | = | Tk. | 161.07 |
|
|
|
|
|
|
| Total | = | Tk. | 5,223.20 |
| Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 333.40 | |||
|
|
|
|
|
|
| Grand Total | = | Tk. | 5,556.60 |
|
|
|
|
|
|
| Rate per No. | = | Tk. | 5,556.60 |
|
|
|
| Say, | Tk. | 5,557 .00 each |
|
|
| |
26.54.2 | Exclusive : CP self closing pillar cock [ Without Mixture ] |
|
|
|
|
|
|
|
| |
| Considering 1 No. of fixture |
|
|
|
|
|
|
|
| |
CP self closing pillar cock | 1 | no | @ | Tk. | 15,000.00 | each | = | Tk. | 15,000.00 | |
Fitting-fixing materials |
|
|
|
|
|
|
|
|
| |
(i) | Teflon tape | 0.3 | pcs | @ | Tk. | 16.00 | per pcs | = | Tk. | 4.80 |
Labour: |
|
|
|
|
|
|
|
|
| |
Plumber | 0.03 | no | @ | Tk. | 600.00 | each | = | Tk. | 18.00 | |
Skilled labour | 0.07 | no | @ | Tk. | 390.00 | each | = | Tk. | 27.30 | |
Ordinary labour | 0.162 | no | @ | Tk. | 320.00 | each | = | Tk. | 51.84 | |
|
|
|
|
|
|
| Sub - Total | = | Tk. | 15,101.94 |
|
|
|
|
|
| Profit | 10.00% | = | Tk. | 1,510.19 |
|
|
|
|
|
| Overhead | 3.50% | = | Tk. | 528.57 |
|
|
|
|
|
|
| Total | = | Tk. | 17,140.70 |
| Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 1,094.09 | |||
|
|
|
|
|
|
| Grand Total | = | Tk. | 18,234.79 |
|
|
|
|
|
|
| Rate per No. | = | Tk. | 18,234.79 |
26.54.3 | CP self closing pillar cock [ With Mixture ] |
|
| Say, | Tk. | 18,235 .00 each |
|
|
| |
|
|
|
|
| ||||||
| Considering 1 No. of fixture |
|
|
|
|
|
|
|
|
|
CP self closing pillar cock | 1 | no | @ | Tk. | 6,500.00 | each | = | Tk. | 6,500.00 | |
Fitting-fixing materials |
|
|
|
|
|
|
|
|
| |
(i) | Teflon tape | 0.3 | pcs | @ | Tk. | 16.00 | per pcs | = | Tk. | 4.80 |
Labour: |
|
|
|
|
|
|
|
|
| |
Plumber | 0.03 | no | @ | Tk. | 600.00 | each | = | Tk. | 18.00 | |
Skilled labour | 0.07 | no | @ | Tk. | 390.00 | each | = | Tk. | 27.30 | |
Ordinary labour | 0.162 | no | @ | Tk. | 320.00 | each | = | Tk. | 51.84 | |
|
|
|
|
|
|
| Sub - Total | = | Tk. | 6,601.94 |
|
|
|
|
|
| Profit | 10.00% | = | Tk. | 660.19 |