  1.  
  2.  

Skilled labour 0.05 no

Ordinary labour 0.095 no

Add VAT with adjustment

@

@

factor

Tk. Tk.

390.00

320.00

Profit
Overhead

1.06383

each
each

=

=

Tk. Tk.

19.50

30.40

Sub - Total

10.00%

3.50%

=

=

=

Tk.
Tk.
Tk.

1,059.70

105.97

37.09

Total

6.00%

=

=

Tk. Tk.

1,202.76

76.77

Grand Total Rate per No.

=

=

Tk. Tk.

1,279.53

1,279.53

 

 

 

 

Say,

Tk.

1,280 .00 each

 

 

 

 

 

 

 

 

Item No.- 26.54

 

 

 

 

 

 

 

 

 

26.54.1

CP self closing pillar cock [ Without Mixture ]

 

 

 

 

 

 

 

 

 

 

Considering 1 No. of fixture

 

 

 

 

 

 

 

 

 

  1.  

CP self closing pillar cock

1

no

@

Tk.

4,500.00

each

=

Tk.

4,500.00

  1.  

Fitting-fixing materials

 

 

 

 

 

 

 

 

 

(i)

Teflon tape

0.3

pcs

@

Tk.

16.00

per pcs

=

Tk.

4.80

  1.  

Labour:

 

 

 

 

 

 

 

 

 

  1.  

Plumber

0.03

no

@

Tk.

600.00

each

=

Tk.

18.00

  1.  

Skilled labour

0.07

no

@

Tk.

390.00

each

=

Tk.

27.30

  1.  

Ordinary labour

0.162

no

@

Tk.

320.00

each

=

Tk.

51.84

 

 

 

 

 

 

 

Sub - Total

=

Tk.

4,601.94

 

 

 

 

 

 

Profit

10.00%

=

Tk.

460.19

 

 

 

 

 

 

Overhead

3.50%

=

Tk.

161.07

 

 

 

 

 

 

 

Total

=

Tk.

5,223.20

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

333.40

 

 

 

 

 

 

 

Grand Total

=

Tk.

5,556.60

 

 

 

 

 

 

 

Rate per No.

=

Tk.

5,556.60

 

 

 

 

Say,

Tk.

5,557 .00 each

 

 

 

26.54.2

Exclusive : CP self closing pillar cock [ Without Mixture ]

 

 

 

 

 

 

 

 

 

Considering 1 No. of fixture

 

 

 

 

 

 

 

 

  1.  

CP self closing pillar cock

1

no

@

Tk.

15,000.00

each

=

Tk.

15,000.00

  1.  

Fitting-fixing materials

 

 

 

 

 

 

 

 

 

(i)

Teflon tape

0.3

pcs

@

Tk.

16.00

per pcs

=

Tk.

4.80

  1.  

Labour:

 

 

 

 

 

 

 

 

 

  1.  

Plumber

0.03

no

@

Tk.

600.00

each

=

Tk.

18.00

  1.  

Skilled labour

0.07

no

@

Tk.

390.00

each

=

Tk.

27.30

  1.  

Ordinary labour

0.162

no

@

Tk.

320.00

each

=

Tk.

51.84

 

 

 

 

 

 

 

Sub - Total

=

Tk.

15,101.94

 

 

 

 

 

 

Profit

10.00%

=

Tk.

1,510.19

 

 

 

 

 

 

Overhead

3.50%

=

Tk.

528.57

 

 

 

 

 

 

 

Total

=

Tk.

17,140.70

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

1,094.09

 

 

 

 

 

 

 

Grand Total

=

Tk.

18,234.79

 

 

 

 

 

 

 

Rate per No.

=

Tk.

18,234.79

26.54.3

CP self closing pillar cock [ With Mixture ]

 

 

Say,

Tk.

18,235 .00 each

 

 

 

 

 

 

 

 

 

Considering 1 No. of fixture

 

 

 

 

 

 

 

 

 

  1.  

CP self closing pillar cock

1

no

@

Tk.

6,500.00

each

=

Tk.

6,500.00

  1.  

Fitting-fixing materials

 

 

 

 

 

 

 

 

 

(i)

Teflon tape

0.3

pcs

@

Tk.

16.00

per pcs

=

Tk.

4.80

  1.  

Labour:

 

 

 

 

 

 

 

 

 

  1.  

Plumber

0.03

no

@

Tk.

600.00

each

=

Tk.

18.00

  1.  

Skilled labour

0.07

no

@

Tk.

390.00

each

=

Tk.

27.30

  1.  

Ordinary labour

0.162

no

@

Tk.

320.00

each

=

Tk.

51.84

 

 

 

 

 

 

 

Sub - Total

=

Tk.

6,601.94

 

 

 

 

 

 

Profit

10.00%

=

Tk.

660.19