Prev Next
īģŋ

  1.  
  2.  
  3.  

Plumber 0.0125

Skilled labour 0.025

Ordinary labour 0.048

no
no
no

@

@

@

Tk.
Tk.
Tk.

600.00

390.00

320.00

Profit
Overhead

each
each
each

=

=

=

Tk.
Tk.
Tk.

7.50

9.75

15.36

Sub - Total

10.00%

3.50%

=

=

=

Tk.
Tk.
Tk.

756.09

75.61

26.46

Total

=

Tk.

858.16

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

54.78

 

 

 

 

 

 

Grand Total

=

Tk.

912.94

 

 

 

 

 

 

Rate per No.

=

Tk.

912.94

26.63.6

Special concealed heavy type angle stop cock

 

Say,

Tk.

913 .00 each

 

 

 

 

 

 

 

 

 

Considering 1 No. of fixture

 

 

 

 

 

 

 

 

  1.  

Special concealed heavy

 

 

 

 

 

 

 

 

 

type angle stop cock 1

no

@

Tk.

950.00

each

=

Tk.

950.00

  1.  

Fitting-fixing materials

 

 

 

 

 

 

 

 

(i)

Teflon tape 0.53

pcs

@

Tk.

16.00

per pcs

=

Tk.

8.48

  1.  

Labour:

 

 

 

 

 

 

 

 

  1.  

Plumber 0.0125

no

@

Tk.

600.00

each

=

Tk.

7.50

  1.  

Skilled labour 0.025

no

@

Tk.

390.00

each

=

Tk.

9.75

  1.  

Ordinary labour 0.048

no

@

Tk.

320.00

each

=

Tk.

15.36

 

 

 

 

 

 

Sub - Total

=

Tk.

991.09

 

 

 

 

 

Profit

10.00%

=

Tk.

99.11

 

 

 

 

 

Overhead

3.50%

=

Tk.

34.69

 

 

 

 

 

 

Total

=

Tk.

1,124.89

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

71.80

 

 

 

 

 

 

Grand Total

=

Tk.

1,196.69

 

 

 

 

 

 

Rate per No.

=

Tk.

1,196.69

 

 

 

Say,

Tk.

1,197 .00 each

 

 

 

 

 

 

 

 

Item No.- 26.64

 

 

 

 

 

 

Groove cutting in brick work, RCC floor etc. and cement mortaring after laying pipe

 

 

 

 

 

 

26.64.1

Groove size: 40 x 40 mm (for laying 12 to 20 mm dia pipe)

 

 

 

 

 

 

 

 

 

Considering 3 meter long groove

 

 

 

 

 

 

 

 

(a)

Labour cutting and filling groove

 

 

 

 

 

 

 

 

  1.  

Plumber 0.06

no

@

Tk.

600.00

each

=

Tk.

36.00

  1.  

Skilled labour 0.12

no

@

Tk.

390.00

each

=

Tk.

46.80

  1.  

Ordinary labour 0.248

no

@

Tk.

320.00

each

=

Tk.

79.36

(b)

Cement mortar (1:4)

 

 

 

 

 

 

 

 

  1.  

Cement 0.024

bag

@

Tk.

395.00

per bag

=

Tk.

9.48

  1.  

Sand (F.M. 1.2) 0.12

cft

@

Tk.

1,400.00

per % cft

=

Tk.

1.68

 

 

 

 

 

 

Sub - Total

=

Tk.

162.16

 

 

 

 

 

Profit

10.00%

=

Tk.

16.22

 

 

 

 

 

Overhead

3.50%

=

Tk.

5.68

 

 

 

 

 

 

Total

=

Tk.

184.06

 

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

11.75

 

 

 

 

 

 

Grand Total

=

Tk.

195.81

 

 

 

 

 

 

Rate per m

=

Tk.

65.27

26.64.2

Groove size: 75 x 75 mm (for laying 25 to 40 mm dia pipe)

 

Say,

Tk.

65

.00 per meter

 

 

 

 

 

 

 

 

 

Considering 3 meter long groove

 

 

 

 

 

 

 

 

(a)

Labour for cutting and filling groove

 

 

 

 

 

 

 

 

  1.  

Plumber 0.09

no

@

Tk.

600.00

each

=

Tk.

54.00

  1.  

Skilled labour 0.156

no

@

Tk.

390.00

each

=

Tk.

60.84

  1.  

Ordinary labour 0.4

no

@

Tk.

320.00

each

=

Tk.

128.00

(b)

Cement mortar (1:4)

 

 

 

 

 

 

 

 

  1.  

Cement 0.1

bag

@

Tk.

395.00

per bag

=

Tk.

39.50

  1.  

Sand (F.M. 1.2) 0.5

cft

@

Tk.

1,400.00

per % cft

=

Tk.

7.00