Plumber 0.0125 Skilled labour 0.025 Ordinary labour 0.048 | no | @ @ @ | Tk. | 600.00 390.00 320.00 Profit | each | = = = | Tk. | 7.50 9.75 15.36 | |
Sub - Total 10.00% 3.50% | = = = | Tk. | 756.09 75.61 26.46 | ||||||
Total | = | Tk. | 858.16 | ||||||
| Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 54.78 | ||
|
|
|
|
|
| Grand Total | = | Tk. | 912.94 |
|
|
|
|
|
| Rate per No. | = | Tk. | 912.94 |
26.63.6 | Special concealed heavy type angle stop cock |
| Say, | Tk. | 913 .00 each |
|
|
| |
|
|
|
|
| |||||
| Considering 1 No. of fixture |
|
|
|
|
|
|
|
|
Special concealed heavy |
|
|
|
|
|
|
|
| |
| type angle stop cock 1 | no | @ | Tk. | 950.00 | each | = | Tk. | 950.00 |
Fitting-fixing materials |
|
|
|
|
|
|
|
| |
(i) | Teflon tape 0.53 | pcs | @ | Tk. | 16.00 | per pcs | = | Tk. | 8.48 |
Labour: |
|
|
|
|
|
|
|
| |
Plumber 0.0125 | no | @ | Tk. | 600.00 | each | = | Tk. | 7.50 | |
Skilled labour 0.025 | no | @ | Tk. | 390.00 | each | = | Tk. | 9.75 | |
Ordinary labour 0.048 | no | @ | Tk. | 320.00 | each | = | Tk. | 15.36 | |
|
|
|
|
|
| Sub - Total | = | Tk. | 991.09 |
|
|
|
|
| Profit | 10.00% | = | Tk. | 99.11 |
|
|
|
|
| Overhead | 3.50% | = | Tk. | 34.69 |
|
|
|
|
|
| Total | = | Tk. | 1,124.89 |
| Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 71.80 | ||
|
|
|
|
|
| Grand Total | = | Tk. | 1,196.69 |
|
|
|
|
|
| Rate per No. | = | Tk. | 1,196.69 |
|
|
| Say, | Tk. | 1,197 .00 each |
|
|
| |
|
|
|
|
| |||||
Item No.- 26.64 |
|
|
|
|
|
| |||
Groove cutting in brick work, RCC floor etc. and cement mortaring after laying pipe |
|
|
|
|
|
| |||
26.64.1 | Groove size: 40 x 40 mm (for laying 12 to 20 mm dia pipe) |
|
|
|
|
|
|
|
|
| Considering 3 meter long groove |
|
|
|
|
|
|
|
|
(a) | Labour cutting and filling groove |
|
|
|
|
|
|
|
|
Plumber 0.06 | no | @ | Tk. | 600.00 | each | = | Tk. | 36.00 | |
Skilled labour 0.12 | no | @ | Tk. | 390.00 | each | = | Tk. | 46.80 | |
Ordinary labour 0.248 | no | @ | Tk. | 320.00 | each | = | Tk. | 79.36 | |
(b) | Cement mortar (1:4) |
|
|
|
|
|
|
|
|
Cement 0.024 | bag | @ | Tk. | 395.00 | per bag | = | Tk. | 9.48 | |
Sand (F.M. 1.2) 0.12 | cft | @ | Tk. | 1,400.00 | per % cft | = | Tk. | 1.68 | |
|
|
|
|
|
| Sub - Total | = | Tk. | 162.16 |
|
|
|
|
| Profit | 10.00% | = | Tk. | 16.22 |
|
|
|
|
| Overhead | 3.50% | = | Tk. | 5.68 |
|
|
|
|
|
| Total | = | Tk. | 184.06 |
| Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 11.75 | ||
|
|
|
|
|
| Grand Total | = | Tk. | 195.81 |
|
|
|
|
|
| Rate per m | = | Tk. | 65.27 |
26.64.2 | Groove size: 75 x 75 mm (for laying 25 to 40 mm dia pipe) |
| Say, | Tk. | 65 | .00 per meter |
|
|
|
|
|
|
|
| |||||
| Considering 3 meter long groove |
|
|
|
|
|
|
|
|
(a) | Labour for cutting and filling groove |
|
|
|
|
|
|
|
|
Plumber 0.09 | no | @ | Tk. | 600.00 | each | = | Tk. | 54.00 | |
Skilled labour 0.156 | no | @ | Tk. | 390.00 | each | = | Tk. | 60.84 | |
Ordinary labour 0.4 | no | @ | Tk. | 320.00 | each | = | Tk. | 128.00 | |
(b) | Cement mortar (1:4) |
|
|
|
|
|
|
|
|
Cement 0.1 | bag | @ | Tk. | 395.00 | per bag | = | Tk. | 39.50 | |
Sand (F.M. 1.2) 0.5 | cft | @ | Tk. | 1,400.00 | per % cft | = | Tk. | 7.00 | |