Prev Next


 

 

 

Profit
Overhead

Sub - Total

10.00%

3.50%

=

=

=

Tk.
Tk.
Tk.

242.84

24.28

8.50

Total

=

Tk.

275.62

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

17.59

 

 

 

 

Grand Total

=

Tk.

293.21

 

 

 

 

Rate per m

=

Tk.

97.74

 

Say,

Tk.

98

.00 per meter

 

 

 

 

 

 

 

 

 

 

 

Item No.- 26.65

 

 

 

 

 

 

 

Supply and fitting-fixing cleanging shower for ablution including holder

 

 

 

 

 

 

 

26.65.1 Fixed type 100 mm CP shower rose

 

 

 

 

 

 

 

Considering 1 No. of fixture

(a) Fixed type 100 mm CP

cleanging shower rose 1 no

(b) Fitting-fixing materials

  1. Teflon tape 0.27 pcs

@

@

Tk. Tk.

440.00

16.00

each
per pcs

=

=

Tk. Tk.

440.00

4.32

  1. Rowel plug & screw 4 nos

(c) Labour:

@

Tk.

9.00

each

=

Tk.

36.00

  1. Plumber 0.025 no

@

Tk.

600.00

each

=

Tk.

15.00

  1. Skilled labour 0.05 no

@

Tk.

390.00

each

=

Tk.

19.50

  1. Ordinary labour 0.095 no

@

Tk.

320.00

each

=

Tk.

30.40

 

 

 

 

Sub - Total

=

Tk.

545.22

 

 

 

Profit

10.00%

=

Tk.

54.52

 

 

 

Overhead

3.50%

=

Tk.

19.08

 

 

 

 

Total

=

Tk.

618.82

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

39.50

 

 

 

 

Grand Total

=

Tk.

658.32

 

 

 

 

Rate per No.

=

Tk.

658.32

 

Say,

Tk.

658 .00 each

 

 

 

26.65.2 Moving type 100 mm CP shower rose

 

 

 

 

 

 

 

Considering 1 No. of fixture

(a) Moving type 100 mm CP

cleanging shower rose 1 no

(b) Fitting-fixing materials

  1. Teflon tape 0.3 pcs

@

@

Tk. Tk.

900.00

16.00

each
per pcs

=

=

Tk. Tk.

900.00

4.80

  1. Rowel plug & screw 4 nos

(c) Labour:

@

Tk.

9.00

each

=

Tk.

36.00

  1. Plumber 0.115 no

@

Tk.

600.00

each

=

Tk.

69.00

  1. Skilled labour 0.19 no

@

Tk.

390.00

each

=

Tk.

74.10

  1. Ordinary labour 0.225 no

@

Tk.

320.00

each

=

Tk.

72.00

 

 

 

 

Sub - Total

=

Tk.

1,155.90

 

 

 

Profit

10.00%

=

Tk.

115.59

 

 

 

Overhead

3.50%

=

Tk.

40.46

 

 

 

 

Total

=

Tk.

1,311.95

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

83.74

 

 

 

 

Grand Total

=

Tk.

1,395.69

 

 

 

 

Rate per No.

=

Tk.

1,395.69

 

Say,

Tk.

1,396 .00 each

 

 

 

 

 

 

 

 

 

 

 

Item No.- 26.66

 

 

 

 

 

 

 

Supply and fitting-fixing cleanging hand shower for ablution including holder

 

 

 

 

 

 

 

26.66.1 CP Moving hand shower

 

 

 

 

 

 

 

Considering 1 No. of fixture

(a) Fixed type 100 mm

 

 

 

 

 

 

 

CP shower rose 1 no

  1. Ftting-fixing materials

(i) Teflon tape 0.3 pcs

  1. Labour:

@

@

Tk. Tk.

1,215.00

16.00

each
per pcs

=

=

Tk. Tk.

1,215.00

4.80