Prev Next
īģŋ

 

 

Considering 50 m to 100 m

  1. Rate for 0 m to 50 m
  2. Add for 50 m to 100 m

 

15%

=

=

Tk. Tk.

938.97

140.85

Total

Rate per meter (50 m to 100 m)

=

=

Tk. Tk.

1,079.82

1,079.82

Say,

Tk. 1,080 .00 per meter

 

 

 

 

 

 

 

Item No.- 27.56.3

 

 

 

 

 

325 mm dia boring

 

 

 

 

 

Considering 100 m to 152 m

  1. Rate for 50 m to 100 m

 

 

=

Tk.

1,079.82

  1. Add for 100 m to 152 m

 

15%

=

Tk.

161.97

 

 

Total

=

Tk.

1,241.79

 

 

Rate per meter (100 m to 152 m)

=

Tk.

1,241.79

 

Say, Tk. 1,242 .00 per meter

 

 

 

 

 

 

 

 

 

Item No.- 27.56.4

 

 

 

 

 

325 mm dia boring

 

 

 

 

 

Considering 152 m to 200 m

  1. Rate for 100 m to 152 m

 

 

=

Tk.

1,241.79

  1. Add for 152 m to 200 m

 

15%

=

Tk.

186.27

 

 

Total

=

Tk.

1,428.06

 

 

Rate per meter (152 m to 200 m)

=

Tk.

1,428.06

 

Say, Tk. 1,428 .00 per meter

 

 

 

 

 

 

 

 

 

Item No.- 27.56.5

 

 

 

 

 

325 mm dia boring

 

 

 

 

 

Considering 200 m to 250 m

  1. Rate for 152 m to 200 m

 

 

=

Tk.

1,428.06

  1. Add for 200 m to 250 m

 

15%

=

Tk.

214.21

 

 

Total

=

Tk.

1,642.27

 

 

Rate per meter (200 m to 250 m)

=

Tk.

1,642.27

 

Say,

Tk. 1,642 .00 per meter

 

 

 

 

 

 

 

 

 

Item No.- 27.56.6

 

 

 

 

 

325 mm dia boring

 

 

 

 

 

Beyond 250 m

  1. Rate for 200m to 250 m

 

 

=

Tk.

1,642.27

  1. Add for beyond 250 m

 

15%

=

Tk.

246.34

 

 

Total

=

Tk.

1,888.61

 

 

Rate per meter (beyond 250 m)

=

Tk.

1,888.61

 

Say,

Tk. 1,889 .00 per meter

 

 

 

 

 

 

 

 

 

Item No.- 27.57.1

 

 

 

 

 

Supplying 150 mm dia M.S. cap

 

 

 

 

 

Considering 1 No.

  1. 6 mm thick 150 mm dia M.S. cap

1 no @

Tk. 1,102.80 each

=

Tk.

1,102.80

  1. Carriage of materials

 

LS

=

Tk.

25.60

 

 

Sub - Total

=

Tk.

1,128.40

 

 

Profit 10.00%

=

Tk.

112.84

 

 

Overhead 3.50%

=

Tk.

39.49

 

 

Total

=

Tk.

1,280.73

 

Add VAT with adjustment factor

1.06383 6.00%

=

Tk.

81.75

 

 

Grand Total

=

Tk.

1,362.48