Prev Next
īģŋ

 

 

Item No.- 28.1.1

 

 

 

 

 

Installation of 50 PSI API 5L, Grade-B ERW M.S. Pipe line for supplying Titas Gas. 75 mm ND (88.90 mm O.D) M.S. pipe. Considering 100 rft of pipe line

(a) Materials:

 

 

 

 

 

  1. Cost of pipe 100 rft @

Tk. 312.94

per rft

=

Tk.

31,294.00

  1. Cost of tape: 4" x 400'-0" 1.0 roll @

Tk. 6,159.23

per roll

=

Tk.

6,159.23

  1. Cost of primer 1.136 liter @

(b) Labour:

Tk. 315.00

per liter

=

Tk.

357.84

  1. Cutting trenches

100'-0" x 1'-6" x 3'-0"= 450.00 cft @

  1. Laying and back-filling in/c levelling the top

surface with excavated earth 100 rft @

  1. Skilled labour for applying primer, wrapping the

pipe with tap in/c scrapping 100 rft @

Tk. 2,958.33

Tk. 14.88

Tk. 9.75

per % 0 cft
per rft
per rft

=

=

=

Tk.
Tk.
Tk.

1,331.25

1,488.00

975.00

  1. Carrying from Titas Gas store to work side in/c loading & unloading

 

LS

=

Tk.

480.00

 

 

Sub - Total

=

Tk.

42,085.32

 

Incidental charges

10.00%

=

Tk.

4,208.53

 

Profit

10.00%

=

Tk.

4,208.53

 

Overhead

3.50%

=

Tk.

147.30

 

 

Total

=

Tk.

50,649.68

Add VAT with adjustment factor

1.06383

6.00%

=

Tk.

3,232.96

 

 

Grand Total

=

Tk.

53,882.64

 

 

Rate per rft

=

Tk.

538.83

 

 

Rate per rm

=

Tk.

1,767.90

Say,

Tk. 1,768

.00 per meter

 

 

 

 

 

 

 

 

 

Item No.- 28.1.2

 

 

 

 

 

Installation of 50 PSI API 5L, Grade-B ERW M.S. Pipe line for supplying

 

 

 

 

 

Titas Gas. 50 mm ND (60.30 mm O.D) M.S. pipe.

 

 

 

 

 

Considering 100 rft of pipe line

(a) Materials:

 

 

 

 

 

  1. Cost of pipe 100 rft @

Tk. 205.00

per rft

=

Tk.

20,500.00

  1. Cost of tape: 2" x 200'-0" 3.0 roll @

Tk. 1,168.55

per roll

=

Tk.

3,505.65

  1. Cost of primer 0.757 liter @

(b) Labour:

Tk. 315.00

per liter

=

Tk.

238.46

(i) Cutting trenches:

 

 

 

 

 

100'-0" x 1'-6" x 3'-0"= 450.00 cft @

  1. Laying and back-filling in/c levelling the top

surface with excavated earth 100 rft @

  1. Skilled labour for applying primer, wrapping the

pipe with tap in/c scrapping 100 rft @

Tk. 2,958.33

Tk. 14.88

Tk. 9.75

per % 0 cft
per rft
per rft

=

=

=

Tk.
Tk.
Tk.

1,331.25

1,488.00

975.00

  1. Carrying from Titas Gas store to work side in/c loading & unloading

 

LS

=

Tk.

480.00

 

 

Sub - Total

=

Tk.

28,518.36

 

Incidental charges

10.00%

=

Tk.

2,851.84

 

Profit

10.00%

=

Tk.

2,851.84

 

Overhead

3.50%

=

Tk.

99.81

 

 

Total

=

Tk.

34,321.85

Add VAT with adjustment factor

1.06383

6.00%

=

Tk.

2,190.76

 

 

Grand Total

=

Tk.

36,512.61

 

 

Rate per rft

=

Tk.

365.13

 

 

Rate per rm

=

Tk.

1,197.99

Say,

Tk. 1,198 .00 per meter