Item No.- 28.1.3

 

 

 

 

 

 

Installation of 50 PSI API 5L, Grade-B ERW M.S. Pipe line for supplying Titas Gas 25 mm ND (33.40 mm O.D) M.S. pipe. Considering 100 rft of pipe line

(a) Materials:

 

 

 

 

 

 

  1. Cost of pipe 100 rft

@

Tk. 100.00

per rft

=

Tk.

10,000.00

  1. Cost of tape: 2" x 200'-0" 1.5 roll

@

Tk. 1,168.55

per roll

=

Tk.

1,752.83

  1. Cost of primer 0.65 liter

(b) Labour:

@

Tk. 315.00

per liter

=

Tk.

204.75

(i) Cutting trenches:

 

 

 

 

 

 

100'-0" x 1'-6" x 3'-0"= 450.00 cft

  1. Laying and back-filling in/c levelling the top

surface with excavated earth 100 rft

  1. Skilled labour for applying primer, wrapping the

pipe with tap in/c scrapping 100 rft

@

@

@

Tk. 2,958.33

Tk. 14.88

Tk. 9.75

per % 0 cft
per rft
per rft

=

=

=

Tk.
Tk.
Tk.

1,331.25

1,488.00

975.00

  1. Carrying from Titas Gas store to work side in/c loading & unloading

 

 

LS

=

Tk.

480.00

 

 

 

Sub - Total

=

Tk.

16,231.83

 

 

Incidental charges

10.00%

=

Tk.

1,623.18

 

 

Profit

10.00%

=

Tk.

1,623.18

 

 

Overhead

3.50%

=

Tk.

56.81

 

 

 

Total

=

Tk.

19,535.00

Add VAT with adjustment factor

1.06383

6.00%

=

Tk.

1,246.92

 

 

 

Grand Total

=

Tk.

20,781.92

 

 

 

Rate per rft

=

Tk.

207.82

 

 

 

Rate per rm

=

Tk.

681.86

 

Say,

Tk. 682

.00 per meter

 

 

 

 

 

 

 

 

 

 

Item No.- 28.1.4

 

 

 

 

 

 

Installation of 50 PSI API 5L, Grade-B ERW M.S. Pipe line for supplying

 

 

 

 

 

 

Titas Gas 20 mm ND (26.7 mm O.D) M.S. pipe.

 

 

 

 

 

 

Considering 100 rft of pipe line

(a) Materials:

 

 

 

 

 

 

  1. Cost of pipe 100 rft

@

Tk. 65.00

per rft

=

Tk.

6,500.00

  1. Cost of tape: 2" x 200'-0" 1.25 roll

@

Tk. 1,168.55

per roll

=

Tk.

1,460.69

  1. Cost of primer 0.57 liter

(b) Labour:

@

Tk. 315.00

per liter

=

Tk.

179.55

(i) Cutting trenches:

 

 

 

 

 

 

100'-0" x 1'-6" x 3'-0"= 450.00 cft

  1. Laying and back-filling in/c levelling the top

surface with excavated earth 100 rft

  1. Skilled labour for applying primer, wrapping the pipe

with tap in/c scrapping 100 rft

@

@

@

Tk. 2,958.33

Tk. 14.88

Tk. 9.75

per % 0 cft
per rft
per rft

=

=

=

Tk.
Tk.
Tk.

1,331.25

1,488.00

975.00

  1. Carrying from Titas Gas store to work side in/c loading & unloading

 

 

LS

=

Tk.

480.00

 

 

 

Sub - Total

=

Tk.

12,414.49

 

 

Incidental charges

10.00%

=

Tk.

1,241.45

 

 

Profit

10.00%

=

Tk.

1,241.45

 

 

Overhead

3.50%

=

Tk.

43.45

 

 

 

Total

=

Tk.

14,940.84

Add VAT with adjustment factor

1.06383

6.00%

=

Tk.

953.67

 

 

 

Grand Total

=

Tk.

15,894.51

 

 

 

Rate per rft

=

Tk.

158.95

 

 

 

Rate per rm

=

Tk.

521.51

 

Say,

Tk. 522

.00 per meter

 

 

 

 

 

 

 

 

 

 

Item No.- 28.2

 

 

 

 

 

 

Sand filling the trench with sand of F.M. 0.8

 

 

 

 

 

 

Considering: 100'-0" x 1'-6" x 1'-0"= 150 cft

  1. Sand in/c 30% for compaction 195 cft
  2. Labour for watering, levelling

& compaction etc. 1.00 no

@

@

Tk. 900.00

Tk. 320.00

per % cft
each

=

=

Tk. Tk.

1,755.00

320.00