Item No.- 30.26.1

 

 

 

 

Providing cladding work in facing in superstructure with 200 x 90 x 38 mm size concrete solid cladding pested with 20 mm thick cement mortar (1:4): Grey

 

 

 

 

Consideration of 100 sft work

(a) Materials

  1. Grey cladding block in/c wastage 480 nos @ Tk. 13.00

each

=

Tk.

6,240.00

  1. Cement 2.60 bags @ Tk. 395.00

per bag

=

Tk.

1,027.00

  1. Sand 16.25 cft @ Tk. 1,400.00

per % cft

=

Tk.

227.50

  1. Transportation 480 nos @ Tk. 2.31

(b) Labour

  1. Block work in/c screening sand & curing 100 sft @ Tk. 19.52

each
per sft

=

=

Tk. Tk.

1,108.80

1,952.00

  1. Scaffolding 25 sft @ Tk. 9.00

per sft

=

Tk.

225.00

  1. Tools and machinery 100 sft @ Tk. 3.20

per sft

 

Tk.

320.00

  1. Labour for local carriage, sundries etc. 0.75 no @ Tk. 320.00

each

=

Tk.

240.00

 

Sub - Total

=

Tk.

11,340.30

Profit

10.00%

=

Tk.

1,134.03

Overhead

3.50%

=

Tk.

396.91

 

Total

=

Tk.

12,871.24

Add VAT with adjustment factor 1.06383

6.00%

=

Tk.

821.57

 

Grand Total

=

Tk.

13,692.81

 

Rate per sft

=

Tk.

136.93

30.26.1.1 Ground floor

Rate per sqm

=

Tk.

1,473.91

 

 

 

 

 

Say, Tk. 1,474 .00 per sqm

 

30.26.1.2 Add for each addl. floor up to 5th floor (@ 1 No. lab. per % sft)

per sqm

=

Tk.

42

30.26.1.3 Add for each addl floor for 6th floor to 9th floor (@ 1.25 nos lab. per % sft)

per sqm

=

Tk.

52

30.26.1.4 Add for each addl floor for 10th floor and above (@ 1.5 nos lab. per % sft)

per sqm

=

Tk.

62

Item No.- 30.26.2

 

 

 

 

Providings cladding work in facing in superstructure with 200 x 90 x 38 mm size concrete solid cladding pested with 20 mm thick cement mortar (1:4): coloured

 

 

 

 

Consideration of 100 sft work

(a) Materials

  1. coloured cladding block in/c wastage 480 nos @ Tk. 15.00

each

=

Tk.

7,200.00

  1. Cement 2.60 bags @ Tk. 395.00

per bag

=

Tk.

1,027.00

  1. Sand 16.25 cft @ Tk. 1,400.00

per % cft

=

Tk.

227.50

  1. Transportation 480 nos @ Tk. 2.31

(b) Labour

  1. Cladding work in/c screening sand 100 sft @ Tk. 19.52

each
per sft

=

=

Tk. Tk.

1,108.80

1,952.00

  1. Scaffolding 25 sft @ Tk. 9.00

per sft

=

Tk.

225.00

  1. Tools and machinery 100 sft @ Tk. 3.20

per sft

 

Tk.

320.00

  1. Labour for local carriagesundries etc. 0.75 no @ Tk. 320.00

each

=

Tk.

240.00

 

Sub - Total

=

Tk.

12,300.30

Profit

10.00%

=

Tk.

1,230.03

Overhead

3.50%

=

Tk.

430.51

 

Total

=

Tk.

13,960.84

Add VAT with adjustment factor 1.06383

6.00%

=

Tk.

891.12

 

Grand Total

=

Tk.

14,851.96

 

Rate per sft

=

Tk.

148.52

30.26.2.1 Ground floor

Rate per sqm

=

Tk.

1,598.67

 

 

 

 

 

Say, Tk. 1,599 .00 per sqm

 

30.26.2.2 Add for each addl. floor up to 5th floor (@ 1 No. lab. per % sft)

per sqm

=

Tk.

42

30.26.2.3 Add for each addl floor for 6th floor to 9th floor (@ 1.25 nos lab. per % sft)

per sqm

=

Tk.

52

30.26.2.4 Add for each addl floor for 10th floor and above (@ 1.5 nos lab. per % sft)

per sqm

=

Tk.

62

Item No.- 30.26.3

 

 

 

 

Providing cladding work in facing in superstructure with 400 x 100 x 50 mm size concrete split cladding pested with 20 mm thick cement mortar (1:4): Grey

 

 

 

 

Consideration of 100 sft work