Item No.- 30.26.1 |
|
|
|
|
Providing cladding work in facing in superstructure with 200 x 90 x 38 mm size concrete solid cladding pested with 20 mm thick cement mortar (1:4): Grey |
|
|
|
|
Consideration of 100 sft work (a) Materials
| each | = | Tk. | 6,240.00 |
| per bag | = | Tk. | 1,027.00 |
| per % cft | = | Tk. | 227.50 |
(b) Labour
| each | = = | Tk. Tk. | 1,108.80 1,952.00 |
| per sft | = | Tk. | 225.00 |
| per sft |
| Tk. | 320.00 |
| each | = | Tk. | 240.00 |
| Sub - Total | = | Tk. | 11,340.30 |
Profit | 10.00% | = | Tk. | 1,134.03 |
Overhead | 3.50% | = | Tk. | 396.91 |
| Total | = | Tk. | 12,871.24 |
Add VAT with adjustment factor 1.06383 | 6.00% | = | Tk. | 821.57 |
| Grand Total | = | Tk. | 13,692.81 |
| Rate per sft | = | Tk. | 136.93 |
30.26.1.1 Ground floor | Rate per sqm | = | Tk. | 1,473.91 |
|
|
|
|
|
Say, Tk. 1,474 .00 per sqm |
| |||
30.26.1.2 Add for each addl. floor up to 5th floor (@ 1 No. lab. per % sft) | per sqm | = | Tk. | 42 |
30.26.1.3 Add for each addl floor for 6th floor to 9th floor (@ 1.25 nos lab. per % sft) | per sqm | = | Tk. | 52 |
30.26.1.4 Add for each addl floor for 10th floor and above (@ 1.5 nos lab. per % sft) | per sqm | = | Tk. | 62 |
Item No.- 30.26.2 |
|
|
|
|
Providings cladding work in facing in superstructure with 200 x 90 x 38 mm size concrete solid cladding pested with 20 mm thick cement mortar (1:4): coloured |
|
|
|
|
Consideration of 100 sft work (a) Materials
| each | = | Tk. | 7,200.00 |
| per bag | = | Tk. | 1,027.00 |
| per % cft | = | Tk. | 227.50 |
(b) Labour
| each | = = | Tk. Tk. | 1,108.80 1,952.00 |
| per sft | = | Tk. | 225.00 |
| per sft |
| Tk. | 320.00 |
| each | = | Tk. | 240.00 |
| Sub - Total | = | Tk. | 12,300.30 |
Profit | 10.00% | = | Tk. | 1,230.03 |
Overhead | 3.50% | = | Tk. | 430.51 |
| Total | = | Tk. | 13,960.84 |
Add VAT with adjustment factor 1.06383 | 6.00% | = | Tk. | 891.12 |
| Grand Total | = | Tk. | 14,851.96 |
| Rate per sft | = | Tk. | 148.52 |
30.26.2.1 Ground floor | Rate per sqm | = | Tk. | 1,598.67 |
|
|
|
|
|
Say, Tk. 1,599 .00 per sqm |
| |||
30.26.2.2 Add for each addl. floor up to 5th floor (@ 1 No. lab. per % sft) | per sqm | = | Tk. | 42 |
30.26.2.3 Add for each addl floor for 6th floor to 9th floor (@ 1.25 nos lab. per % sft) | per sqm | = | Tk. | 52 |
30.26.2.4 Add for each addl floor for 10th floor and above (@ 1.5 nos lab. per % sft) | per sqm | = | Tk. | 62 |
Item No.- 30.26.3 |
|
|
|
|
Providing cladding work in facing in superstructure with 400 x 100 x 50 mm size concrete split cladding pested with 20 mm thick cement mortar (1:4): Grey |
|
|
|
|
Consideration of 100 sft work |
|
|
|
|