31.3.2 Additional charge for bore hole depth above 20 to 30m

 

 

 

 

 

 

 

  1. Boring Cost

 

 

 

per bore

=

Tk.

5,538.75

  1. SPT Cost

 

 

 

per bore

=

Tk.

1,614.24

  1. Collection of Samples & visual soil classification

 

 

 

per bore

=

Tk.

1,500.00

  1. Soil Report Preparation & Submission

 

 

 

per bore

=

Tk.

500.00

 

 

 

 

Sub - Total

=

Tk.

9,152.99

 

 

 

Profit

10.00%

=

Tk.

915.30

 

 

 

Overhead

3.50%

=

Tk.

320.35

 

 

 

 

Total

=

Tk.

10,388.64

Add VAT with adjustment factor

 

 

1.06383

6.00%

=

Tk.

663.10

 

 

 

 

Grand Total

=

Tk.

11,051.74

 

 

 

 

Rate per meter =

Tk.

227.17

 

Say,

Tk.

216

.00 per meter

 

 

 

31.3.3 Additional charge for bore hole depth 30 to 40m

 

 

 

per bore

=

Tk.

8,123.50

  1. Boring Cost
  1. SPT Cost

 

 

 

per bore

=

Tk.

2,152.32

  1. Collection of Samples & visual soil classification

 

 

 

per bore

=

Tk.

1,500.00

  1. Soil Report Preparation & Submission

 

 

 

per bore

=

Tk.

500.00

 

 

 

 

Sub - Total

=

Tk.

12,275.82

 

 

 

Profit

10.00%

=

Tk.

1,227.58

 

 

 

Overhead

3.50%

=

Tk.

429.65

 

 

 

 

Total

=

Tk.

13,933.05

Add VAT with adjustment factor

 

 

1.06383

6.00%

=

Tk.

889.34

 

 

 

 

Grand Total

=

Tk.

14,822.39

 

 

 

 

Rate per meter =

Tk.

251.38

 

Say,

Tk.

239

.00 per meter

 

 

 

31.3.4 Additional charge for bore hole depth 40 to 50m

 

 

 

per bore

=

Tk.

10,919.25

  1. Boring Cost
  1. SPT Cost

 

 

 

per bore

=

Tk.

2,690.40

  1. Collection of Samples & visual soil classification

 

 

 

per bore

=

Tk.

1,500.00

  1. Soil Report Preparation & Submission

 

 

 

per bore

=

Tk.

500.00

 

 

 

 

Sub - Total

=

Tk.

15,609.65

 

 

 

Profit

10.00%

=

Tk.

1,560.97

 

 

 

Overhead

3.50%

=

Tk.

546.34

 

 

 

 

Total

=

Tk.

17,716.96

Add VAT with adjustment factor

 

 

1.06383

6.00%

=

Tk.

1,130.87

 

 

 

 

Grand Total

=

Tk.

18,847.83

 

 

 

 

Rate per meter =

Tk.

268.36

 

Say,

Tk.

255

.00 per meter

 

 

 

 

 

 

 

 

 

 

 

Item No.- 31.4

 

 

 

 

 

 

 

Installation of boring equipment at site: For depth of water above 1500 mm

 

 

 

 

 

 

 

Considering 1 point

(a) Man-power

  1. Foreman (1 x 1/16) 0.06 manday

@

Tk.

800.00

each

=

Tk.

48.00

  1. Rig operators (1 x 1/8) 0.13 manday

@

Tk.

600.00

each

=

Tk.

78.00

  1. Skilled labour (6 x 1/8) 0.75 manday

@

Tk.

390.00

each

=

Tk.

292.50

  1. Unskilled labour (2 x 1/8) 0.25 manday

(b) Material

  1. Bamboo for platform (using 6 times) 268 rft
  2. Wooden plank (using 6times)

10 x 8'-0" x 12" x 1.5"= 12 cft

@

@

@

Tk.
Tk.
Tk.

320.00

15.00

650.00

each

per rft
per cft

=

=

=

Tk.
Tk.
Tk.

80.00

670.00

1,300.00

  1. Rope (using 4 times) 8 kg

@

Tk.

60.00

per kg

=

Tk.

120.00

  1. Hire charge of small boat 1 no

@

Tk.

700.00

each

=

Tk.

700.00