VAT with adjustment factor 1.06383 | 6.00% = | Tk. | 339.04 |
Grand Total = Rate per sqm = | Tk. Tk. | 5,650.72 1,686.78 | |
Say, Tk. 1,687 .00 per sqm | |||
|
|
|
|
Item No. 32.41.1 |
|
|
|
Renewing white washing: 1 coat |
|
|
|
Materials for considering 100 sqm of work for 3 coats
| per kg = | Tk. | 401.60 |
| per kg = | Tk. | 64.00 |
| per kg = | Tk. | 44.00 |
|
| Tk. | 509.60 |
Hence, material for one coat
good the holes, patch etc. 0.125 no @ Tk. 500.00 | = each = | Tk. Tk. | 203.84 62.50 |
| each = | Tk. | 300.00 |
| each = | Tk. | 160.00 |
| LS = = | Tk. Tk. | 96.00 160.00 |
| SubTotal = | Tk. | 982.34 |
Contractor's profit | 10% = | Tk. | 98.23 |
Overhead expenses | 3.50% = | Tk. | 34.38 |
| Total = | Tk. | 1,114.95 |
VAT with adjustment factor 1.06383 | 6.00% = | Tk. | 71.17 |
| Grand Total = | Tk. | 1,186.12 |
| Rate per sqm = | Tk. | 11.86 |
Say, Tk. 12 .00 per sqm |
|
| |
|
|
|
|
Item No. 32.41.2 |
|
|
|
Renewing white washing: 2 coats |
|
|
|
Considering 100 sqm of work
a) Mason for mending good the holes, patch etc. 0.125 no @ Tk. 500.00 | = each = | Tk. Tk. | 382.20 62.50 |
| each = | Tk. | 450.00 |
| each = | Tk. | 240.00 |
| LS = = | Tk. Tk. | 192.00 160.00 |
| SubTotal = | Tk. | 1,486.70 |
Contractor's profit | 10% = | Tk. | 148.67 |
Overhead expenses | 3.50% = | Tk. | 52.03 |
| Total = | Tk. | 1,687.40 |
VAT with adjustment factor 1.06383 | 6.00% = | Tk. | 107.71 |
| Grand Total = | Tk. | 1,795.11 |
| Rate per sqm = | Tk. | 17.95 |
Say, Tk. 18 .00 per sqm |
|
| |
|
|
|
|
Item No. 32.42.1 |
|
|
|
Renewing colour washing with yellow orchre: 1 coat colour washing over 1 coat white washing |
|
|
|
Considering 100 sqm of work for 1 coat
| = | Tk. | 982.34 |
40% of 2.0 kg 0.8 kg @ Tk. 180.00 | per kg = | Tk. | 144.00 |