CONCRETE

 

 

 

 

 

 

 

 

A.

Labour, machinery, fuel and lubricant for casting CONCRETE using one concrete mixture machine (10 cft) per 1000cft /day

 

 

 

(a)

Head mason

1 no

@

Tk.

600.00

each

=

Tk.

600.00

(b)

Mason

2 nos

@

Tk.

500.00

each

=

Tk.

1,000.00

(c)

Skilled labour:

 

 

 

 

 

 

 

 

  1.  

Feeding cement

0.2 no

 

 

 

 

 

 

 

  1.  

Feeding sand

2 nos

 

 

 

 

 

 

 

  1.  

Feeding chips

2 nos

 

 

 

 

 

 

 

 

Total =

4.2 nos

@

Tk.

390.00

each

=

Tk.

1,638.00

(d)

Ordinary labour

 

 

 

 

 

 

 

 

(i)

Bag cutting

0.5 no

 

 

 

 

 

 

 

(ii)

Belcha

3 nos

 

 

 

 

 

 

 

(iii)

Lifting

4 nos

 

 

 

 

 

 

 

(iv)

Pouring

4 nos

 

 

 

 

 

 

 

(v)

On the way

4 nos

 

 

 

 

 

 

 

(vi)

Poking

2 nos

 

 

 

 

 

 

 

(vii)

Watering

0.5 no

 

 

 

 

 

 

 

 

Total =

18 nos

@

Tk.

320.00

each

=

Tk.

5,760.00

(e)

Mixture machine hire charge

1 day

@

Tk.

1,200.00

per day

=

Tk.

1,200.00

(f)

Vibrator machine hire charge

1 day

@

Tk.

600.00

per day

=

Tk.

600.00

(g)

Fuel and lubricant for mixture

 

 

 

 

 

 

 

 

 

machine & vibrator

1 day

@

Tk.

1,200.00

per day

=

Tk.

1,200.00

 

 

 

 

 

 

Total

=

Tk.

11,998.00

A-1

Cost for placing 100 cft concrete using 1 mixer machine

 

@

 

1200

cft per day

=

Tk.

999.83

A-2

Cost for placing 100 cft concrete using 1 mixer machine

 

@

 

1000

cft per day

=

Tk.

1,199.80

A-3

Cost for placing 100 cft concrete using 1 mixer machine

 

@

 

800

cft per day

=

Tk.

1,499.75

A-4

Cost for placing 100 cft concrete using 1 mixer machine

 

@

 

600

cft per day

=

Tk.

1,999.67

A-5

Cost for placing 100 cft concrete using 1 mixer machine

 

@

 

500

cft per day

=

Tk.

2,399.60

B-1.

Concrete (1:3:6) work using BRICK CHIPS and sand of F.M. 1.2

 

 

 

 

 

 

 

 

 

Considering 100 cft of work

 

 

 

 

 

 

 

 

  1.  

Bricks for chips

 

 

 

 

 

 

 

 

 

(@ 90 cft for % cft concrete).

765 nos

@

Tk.

8,700.00

%0 nos

=

Tk.

6,655.50

  1.  

Breaking chips in/c screening

90 cft

@

Tk.

950.00

% cft

=

Tk.

855.00

  1.  

Sand (F.M. 1.2)

45 cft

@

Tk.

1,400.00

% cft

=

Tk.

630.00

  1.  

Cement: CEM-II/A,52.5

13 bags

@

Tk.

395.00

bag

=

Tk.

5,135.00

  1.  

Local carriage, sundries, T & P, water, laboratory charge etc.

 

 

 

 

LS

=

Tk.

320.00

 

 

 

 

 

 

 

 

Tk.

13,595.50

 

 

 

 

 

 

135.96

 

 

 

B-2.

Concrete (1:2:4) work using BRICK CHIPS with sand of F.M. 1.2

 

 

 

 

 

 

 

 

 

Considering 100 cft of work

 

 

 

 

 

 

 

 

  1.  

Bricks for chips

 

 

 

 

 

 

 

 

 

(@ 90 cft for % cft concrete).

765 nos

@

Tk.

8,700.00

%0 nos

=

Tk.

6,655.50

  1.  

Breaking chips in/c screening

90 cft

@

Tk.

950.00

% cft

=

Tk.

855.00

  1.  

Sand (F.M. 1.2)

45 cft

@

Tk.

1,400.00

% cft

=

Tk.

630.00

  1.  

Cement: CEM- I,52.5

18 bags

@

Tk.

415.00

bag

=

Tk.

7,470.00

  1.  

Local carriage, sundries, T & P, water, laboratory charge etc.

 

 

 

 

LS

=

Tk.

320.00

 

 

 

 

 

 

Total

=

Tk.

15,930.50

 

 

 

 

 

 

159.31

 

 

 

B-3

Concrete (1:2:4) work using BRICK CHIPS (sand of F.M. 1.2 and 2.2 in equal proportion)

 

 

 

 

 

 

 

Considering 100 cft of work

 

 

 

 

 

 

 

 

  1.  

Bricks for chips

 

 

 

 

 

 

 

 

 

(@ 90 cft for % cft concrete).

765 nos

@

Tk.

8,700.00

%0 nos

=

Tk.

6,655.50

  1.  

Breaking chips in/c screening

90 cft

@

Tk.

950.00

% cft

=

Tk.

855.00

  1.  

Sand (F.M. 1.2)

22.5 cft

@

Tk.

1,400.00

% cft

=

Tk.

315.00

  1.  

Sand (F.M. 2.2)

22.5 cft

@

Tk.

4,500.00

% cft

=

Tk.

1,012.50

  1.  

Cement: OPC, Type-1 (CEM-I),52.5

18 bags

@

Tk.

415.00

bag

=

Tk.

7,470.00